BLD-Final | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/3/2000 ok for c/o pend fire
|
Permanent Occupancy | | 10/3/2000 | 10/3/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 10/2/2000 12:23:29 PM
|
BLD-Final | 9/27/2000 | 9/29/2000 | 9/29/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####, c/n: fire corrections, address, sign, partition bracing, install all glazing. ok for t/o pend fire ok 9/29/2000 11:40:05 AM
|
FIRE-Final Inspection | 9/27/2000 | 9/28/2000 | 9/28/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Fail C/N issued 9/29/2000 12:07:37 PM
|
BLD-Framing/Rough-in | 9/21/2000 | 9/22/2000 | 9/22/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### 9/22/2000 12:03:44 PM q and a room int room for shop framing ok 9/22/2000 2:12:07 PM
|
BLD-Framing/Rough-in | 9/6/2000 | 9/6/2000 | 9/6/2000 | P | PART |
Carl Dependahl
|
|
|
dave-- ###-#### fr , c/n re grid, spec insp o to cover walls9/6/2000 12:01:50 9/6/2000 12:04:39 PM
|
BLD-Framing/Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
Carl Dependahl
|
|
|
Dave; ###-#### ok to insul only, has htgc/n 9/5/2000 1:14:49 PM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/28/2000 int shear ok except at mech rm walls cut for comb air
|
BLD-Framing/Rough-in | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Carl Dependahl
|
|
|
Dave ###-####; ok to fasten gyp at mezz. shearwall only 8/14/2000 9:36:52 AM
|
BLD-Footing | 7/3/2000 | 7/5/2000 | 7/5/2000 | A | PART |
Jim Sly
|
|
|
###-#### Center column pads OK pending spec. insp appr (STRATA)...Job locate just W. of T/A Co. 7/5/00 10:09:23 AM
|