BLD-Final | 5/22/2001 | 5/23/2001 | 5/23/2001 | A | PASS |
Alan Hauser
|
|
|
ok for permenant occ., as per #316 5/23/2001 9:31:11 AM
|
Permanent Occupancy | | 5/23/2001 | 5/23/2001 | | DONE |
|
|
|
|
BLD-Final | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PART |
Jim Sly
|
|
|
###-#### OK for Temp Occ....C/N..Need ADA counter at reception counter and Need Perm Occ status within 90 days of this notice. Public works OK'd ....Phoned to tell me. 3/9/2001 1:38:27 PM
|
FIRE-Final Inspection | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK FOR PERMANANT OCCUPANCY 3/9/2001 12:40:40 PM
|
BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Jim Sly
|
|
|
###-####
|
BLD-Final | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Jim Sly
|
|
|
###-####
|
FIRE-Final Inspection | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Cancel not ready 3/8/2001 5:20:09 PM
|
BLD-Final | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### ###-####323 3/7/2001 2:33:27 PM Need Req. signatures.....Warned of glazing within 18" of floor. 3/7/2001 2:34:33 PM
|
FIRE-Final Inspection | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 3/8/2001 8:17:57 AM
|
BLD-Conference | 2/1/2001 | 2/2/2001 | 2/2/2001 | A | CANC |
Jim Sly
|
|
|
dave ###-#### Cancelled by Dave (superinten). 2/1/2001 5:17:11 PM
|
BLD-Framing/Rough-in | 1/12/2001 | 1/12/2001 | 1/12/2001 | P | PASS |
Jim Sly
|
|
|
###-#### DAve Frame OK except stairs....Will check a final. 1/12/2001 11:57:26 AM
|
BLD-Final | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Jim Sly
|
|
|
###-#### OK for Temp Occ....West 1/2 of bldg only C/N Complete entire bldg & obtain Perm Occ within 120 days. 1/10/2001 6:01:04 PM
|
BLD-Final | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | FAIL |
Jim Sly
|
|
|
dave ###-#### cell fn NR 1/9/2001 11:03:33 AM
|
FIRE-Final Inspection | 1/8/2001 | 1/9/2001 | 1/9/2001 | A | CANC |
Joe Tawney
|
|
|
cell ###-#### dave fire fn Cancel Not ready 1/9/2001 12:48:32 PM
|
FIRE-Final Inspection | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PASS |
Joe Tawney
|
|
|
dave ###-#### fn fire Reinsp OK for permanant occupancy 1/10/2001 8:09:09 AM
|
BLD-Final | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 18:27:28. Contact: ###-####.
|
BLD-Final | 1/4/2001 | 1/3/2001 | 1/3/2001 | P | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 1/4/2001 8:09:07 AM Final Fail C/N issued
|
BLD-Other | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 18:26:50. Contact: ###-####.
|
BLD-Final | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
not ready 1/2/2001 3:28:31 PM
|
BLD-Framing/Rough-in | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Tom Arcoraci
|
|
|
early pm Dave ###-#### cn issued 1/2/2001 3:28:15 PM
|
FIRE-Final Inspection | 12/29/2000 | 1/2/2001 | 1/2/2001 | P | FAIL |
Joe Tawney
|
|
|
Fail Not ready 1/3/2001 8:28:13 AM
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
###-#### DAve
|
BLD-Conference | 12/21/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Jim Sly
|
|
|
###-#### DAve
|
BLD-Energy code compliance | 11/1/2000 | 11/2/2000 | 11/2/2000 | P | PART |
Jim Sly
|
|
|
BLD 3\ ###-#### For main floor west tenant space ONLY...Frame OK too. 11/2/2000 2:25:34 PM 11/2/2000 2:26:59 PM
|
BLD-Framing/Rough-in | 10/27/2000 | 10/30/2000 | 10/30/2000 | A | FAIL |
Jim Sly
|
|
|
BLD # 3------MATT -###-#### Main flr West side....C/N Penitr Tenant Dem wall. 10/30/2000 10:39:55 AM
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | NR |
Jim Sly
|
|
|
BUILDING 3 WEST SIDE OF MED BUILDING NR 10/25/2000 11:04:25 AM
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | FAIL |
Jim Sly
|
|
|
Matt ###-####2 Need all trade R/I approvals. 10/17/2000 10:29:49 AM
|
BLD-Framing/Rough-in | 10/3/2000 | 10/4/2000 | 10/4/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### 861- 0564 Need all trade finals and resolve plan change from bsmnt sprinklers to Usable space. 10/4/2000 10:06:49 AM
|
BLD-Conference | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Jim Sly
|
|
|
Ramo ###-#### Mech/frame questions. 9/15/2000 9:59:02 AM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/15/2000 | 9/15/2000 | P | PART |
Jim Sly
|
|
|
Shear OK 9/15/2000 2:09:09 PM
|