Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-01643
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 8455 W WESTPARK ST
Project NameSCP GLOBAL TECH-#455/456
Customer Number 
ePlanReviewNo
Description
SCP GLOBAL TEHCNOLOGIES (BLDG 455/456) PHASE II - To construct a 4,992 sq.ft. loading dock to the northeast corner of building, construct a 1,431 sq.ft. enclosed link between Bldg. 455 and 456 at the South end, to attach buildings, and miscellaneous site work per DRH00-00076. A Density reduction survey has been done & recorded to remove interior property line between buildings. With this permit both buildings will be considered one building of Type V-N Construction with unlimited area, allowed by the 20 year renewable lease acquisition of the railroad right-of-way so there are four 60 foot yards around the perimeter and the building is fully fire sprinklered. To install electrical, mechanical, plumbing & sprinkler system for support of modified existing areas and the new additions. All per approved plans, notes & attached plan review comments. NOTE: This builidng is fully sprinkled for allowable area increase. PC#00-477/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in12/13/200112/13/200112/13/2001PCANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 12/13/2001 9:37:49 AM walk thru, ###-#### mel...in error 12/13/2001 12:17:04 PM
BLD-Final1/9/20011/10/20011/10/2001APASS
DetailsTom Arcoraci
###-#### ok form perm occ when code enforcement signs perm occ 1/10/2001 3:12:45 PM
BLD-Final1/8/20011/9/20011/9/2001AFAIL
DetailsRuss Owen
###-#### need copy of s-i final letter which is at the site, also project engineer needs to address the noted deviations. 1/9/2001 11:04:07 AM 1/9/2001 11:06:08 AM
FIRE-Final Inspection1/5/20011/8/20011/8/2001PPASS
DetailsJoe Tawney
FIRE FN JEFF ###-#### Reinsp OK for permanant occupancy 1/8/2001 5:21:16 PM
FIRE-Final Inspection1/4/20011/5/20011/5/2001AFAIL
DetailsJoe Tawney
###-#### Final Fail AHU shutdown 1/5/2001 1:38:10 PM
BLD-Framing/Rough-in11/20/200011/21/200011/21/2000APART
DetailsTom Arcoraci
###-#### link framing ok 11/21/2000 11:17:01 AM
FIRE-Final Inspection11/9/200011/9/200011/9/2000PPASS
DetailsJoe Tawney
FIRE FN JASON ###-#### Reinsp Ok for certificate of completion 11/14/2000 7:55:54 AM
BLD-Concrete11/1/200011/2/200011/2/2000PPART
DetailsCarl Dependahl
stem wall -- ted ###-####; link area, ok pend spec insp reports 11/2/2000 2:43:39 PM
BLD-Footing11/1/200011/1/200011/1/2000PPART
DetailsCarl Dependahl
ft insp-- ted ###-####
BLD-Final10/30/200010/31/200010/31/2000AFAIL
DetailsDave Hannah
TEMP OCC- ###-####- TED
BLD-Final10/30/200010/30/200010/30/2000PCANC
DetailsCarl Dependahl
temp occ Ted Parret ###-####
BLD-Final10/24/200010/25/200010/25/2000AFAIL
DetailsCarl Dependahl
TEMP ###-####; c/n, spec insp reports, truss eng'g, complete gaurdrails, etc 10/25/2000 12:27:14 PM
FIRE-Final Inspection10/24/200010/24/200010/24/2000PPART
DetailsJoe Tawney
Ted ###-#### OK on alarm test for new loading dock Also see FIR00-00595 10/25/2000 8:01:03 AM
BLD-Framing/Rough-in9/18/20009/19/20009/19/2000PPART
Details
Ted Parrott ###-#### o cover ext walls after insulationTed Parrott ###-#### 9/19/2000 3:03:48 PM
BLD-Framing/Rough-in9/18/20009/19/20009/19/2000PPART
Details
Ted Parrott ###-#### o cover ext walls after insulationTed Parrott ###-#### 9/19/2000 3:03:48 PM
BLD-Framing/Rough-in9/11/20009/11/20009/11/2000PPART
DetailsTom Arcoraci
###-#### 9/11/2000 4:08:53 PM hear nail ok for ext at loading dock 9/11/2000 4:09:17 PM
BLD-Foundation8/7/20008/8/20008/8/2000APART
DetailsTom Arcoraci
Ted ###-####
BLD-Footing8/3/20008/4/20008/4/2000APART
DetailsCarl Dependahl
late morning ###-#### jeff; pend insp report 8/4/2000 11:32:22 AM