Permanent Occupancy | | 3/22/2002 | 3/22/2002 | | DONE |
|
|
|
|
BLD-Final | 3/20/2002 | 3/21/2002 | 3/21/2002 | A | PASS |
Carl Dependahl
|
|
|
###-#### MEL c/n ok. ok for perm c/o. 3/21/2002 10:13:04 AM
|
FIRE-Final Inspection | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/21/2002 3:00:42 PM
|
BLD-Final | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### MEL awaiting Mti's approval of fireproofing test at int. column & beam. 3/20/2002 1:48:30 PM
|
BLD-Conference | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/14/2002 3:10:18 PM dbl door astragal smoke-fire seals ok
|
BLD-Conference | 3/8/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/8/2002 3:58:24 PM ok to build out 1hr ext. walls at time of tenant improvement of retail area. 3/11/2002 4:10:01 PM
|
BLD-Final | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PART |
Carl Dependahl
|
|
|
mel ###-#### fn has t/o; awaiting shell final affidavit. 3/11/2002 4:08:29 PM
|
BLD-Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | PART |
Carl Dependahl
|
|
|
call first ###-####
|
BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/7/2002 10:29:26 AM w/ supt. re final: need door astragals/smoke seals as per prior c/n.
|
FIRE-Final Inspection | 3/7/2002 | 3/7/2002 | 3/7/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/7/2002 8:36:51 AM
|
BLD-Conference | 2/26/2002 | 2/26/2002 | 2/26/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/26/2002 9:37:37 AM w/ GS & Mel Perez...need adjust doors to ADA "push" req's; install gyp at retail area common wall to courtyard area per GS
|
BLD-Conference | 2/19/2002 | 2/19/2002 | 2/20/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 408 On 2/19/2002 5:08:18 PM w/ Mel Perez re 1hr ext walls...will consult supervisor. 2/21/2002 9:00:11 AM
|
BLD-Final | 2/15/2002 | 2/19/2002 | 2/20/2002 | A | NR |
Carl Dependahl
|
|
|
###-####; Keep c/n, foyer stairs are complete. 2/21/2002 8:57:30 AM
|
BLD-Conference | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | NR |
Carl Dependahl
|
|
|
###-####; unable to contact; recall. 2/19/2002 1:15:19 PM
|
BLD-Final | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### mel
|
BLD-Conference | 2/11/2002 | 2/11/2002 | 2/12/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/11/2002 2:32:21 PM re stairs, wip, keep c/n 2/12/2002 6:03:08 PM
|
BLD-Final | 1/25/2002 | 1/28/2002 | 1/28/2002 | A | NR |
Carl Dependahl
|
|
|
###-#### MEL, need adjust total doors etc. keep c/n 1/28/2002 12:37:16 PM
|
BLD-Conference | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 1/23/2002 6:16:09 PM mel wip, keep c/n 1/24/2002 12:00:49 PM
|
BLD-Conference | 1/24/2002 | 1/24/2002 | 1/24/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 1/24/2002 11:59:30 AM ...keep c/n , address affidavit issues 1/24/2002 5:10:31 PM
|
BLD-Conference | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/11/2002 5:17:15 PM w/Carl W. re 3rd fl shelled space, letter ok...no use at present.
|
BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | FAIL |
Carl Dependahl
|
|
|
###-#### . c/n re winders at lobby 1/3/2002 6:18:19 PM
|
BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### c/n, ok for t/o; need eng's/archs report, install smoke seals at dbl doors, etc. 1/3/2002 8:09:53 AM
|
BLD-Final | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/28/2001 5:42:54 PM
|
BLD-Final | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/28/2001 5:42:54 PM
|
BLD-Final | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/28/2001 5:42:54 PM
|
BLD-Final | 12/28/2001 | 12/31/2001 | 12/31/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/28/2001 5:42:54 PM ...c/n provide listing for dbl doors, clari 12/31/2001 5:44:31 PM y eng's affidavit, complete firestops at cable trays at floors (telecom rms) etc. 12/31/2001 5:45:58 PM
|
BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####...keep c/n, remove duct at 5th fl. s.w. stair enclosure. 12/28/2001 5:15:18 PM
|
FIRE-Final Inspection | 12/27/2001 | 12/28/2001 | 12/28/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### door hardware and closures; with Carl D and Lee 12/28/2001 4:53:10 PM
|
BLD-Final | 12/20/2001 | 12/21/2001 | 12/21/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/20/2001 6:12:14 PM ...need engs report, etc. 12/21/2001 6:47:58 PM
|
BLD-Final | 12/19/2001 | 12/20/2001 | 12/20/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/19/2001 5:51:14 PM mel. keep c/n 12/20/2001 6:12:57 PM
|
BLD-Final | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 12/18/2001 3:54:09 PM Mel ###-####...keep c/n, need all other signatures, etc. partial only. 12/19/2001 6:42:45 PM
|
BLD-Final | 12/19/2001 | 12/19/2001 | 12/19/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####...complete damper install; clear shafts of combustible mat'l, verify exit signs & unimpeded doors at 1st fl. east exit area. part only; rec'd 2nd fl horiz exit diagram as built. 12/19/2001 6:45:29 PM
|
BLD-Conference | 12/17/2001 | 12/18/2001 | 12/18/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####; w/ Mel re elev mach rms/ penthouses not rated per ch 15, ubc (exc.) 12/18/2001 3:55:36 PM
|
BLD-Framing/Rough-in | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### c/n issued re ramps, guards, etc 12/17/2001 5:36:27 PM
|
BLD-Conference | 12/13/2001 | 12/13/2001 | 12/13/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/13/2001 5:35:03 PM w/ Mel re elev mach. rms. & penthouses; NC/NR ok beyond 20' to p.l...hoist ways to be vented.
|
BLD-Framing/Rough-in | 12/12/2001 | 12/12/2001 | 12/12/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### bsmt corr. ok, exc. cable trays 12/12/2001 6:07:02 PM
|
BLD-Framing/Rough-in | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PART |
Carl Dependahl
|
|
|
MEL ###-#### need chk sf dampers at elev lobbies, wip 12/11/2001 6:26:42 PM
|
BLD-Framing/Rough-in | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | PART |
Russ Owen
|
|
|
###-####. questions for basements. 12/5/2001 4:12:55 PM
|
BLD-Framing/Rough-in | 11/30/2001 | 12/3/2001 | 12/3/2001 | A | PASS |
Jim Storey
|
|
|
###-#### mel 1 hr const. on 3rd to 5 th floors in place ok to cover ceilling tile. 12/3/2001 2:33:00 PM
|
BLD-Conference | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/29/2001 2:24:54 PM w/ Tim Hogland, Jennifer, & GS: waiver of 1hr wall at north side ok exc. at sally port & wall above as is approx 39 ft to p.l...1hr to be completed at wall closer than stated not at 90 deg. to p.l. (extension above sally port)
|
BLD-Conference | 11/27/2001 | 11/27/2001 | 11/27/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/27/2001 9:20:54 AM w/new architect & Lee B. re courtroom walls, still need detail for revised horiz. exit at 4th fl; keep c/n. (Richard Hatcher has left L.C.A. met Debora onsite as new arch.)
|
BLD-Framing/Rough-in | 11/21/2001 | 11/26/2001 | 11/26/2001 | P | PART |
Carl Dependahl
|
|
|
LEROY ###-#### c/n re north wall fire rating. 11/26/2001 5:45:47 PM
|
BLD-Framing/Rough-in | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PART |
Carl Dependahl
|
|
|
###-####; grid at 4th fl corridor, elev. lobby ok. need remove or enclose piping at central stair enclosure. 11/16/2001 5:39:39 PM
|
BLD-Framing/Rough-in | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/14/2001 5:14:49 PM Mel ###-#### lobby ok to tile 11/15/2001 6:26:27 PM
|
BLD-Conference | 11/13/2001 | 11/14/2001 | 11/15/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/13/2001 6:15:19 PM ###-####...w/ supt at site 11/15/2001 3:00:31 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/13/2001 6:14:23 PM
|
BLD-Framing/Rough-in | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### MEL 11/13/2001 1:50:21 PM 11/13/2001 1:50:49 PM
|
BLD-Conference | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/9/2001 4:38:27 PM onsite w/ Mel P. re req's for fire doors/rated glazing...90 min req'd at 2hr wall sections.
|
BLD-Framing/Rough-in | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/6/2001 4:50:02 PM 10-12:00 please. 2hr. horiz. exit wall & bsmt separation walls, keep c/n, need archs detail for 4th fl 2hr wall; %th fl courts & perim room grids ok 11/7/2001 2:32:26 PM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/7/2001 2:33:35 PM bsmt corridor & separation walls part, 2hr sep. wall infill is ok to use shaftwall system; need verify proper glazing at 2hr wall doors (visitation rooms, etc.) 11/7/2001 4:31:37 PM
|
BLD-Framing/Rough-in | 11/5/2001 | 11/5/2001 | 11/6/2001 | P | NR |
Carl Dependahl
|
|
|
keep c/n, recall 11/6/2001 4:46:23 PM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### MEL . Grid ok at 4th floor ,but cable tray penetrations not done, also 4 hr horizontal exit is not constructed as per plans, told contractor to have the architect out to determine how to gain compliance as built, doors not lined up walls not lined up etc ,will require some modifications,contractor told to stay away from the wall untill a new plan from architect has been submitted. Basement not ready for grid inspection, 2nd floor corriodr ok grid except for corridor wall penitrations. 11/1/2001 5:07:21 PM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### mel. Recall fourth fourth floor, add pods in rooms over 144 sq ft also will need to check above all of the 1 hour cooridor and 2 hour horz exit wall both sides for penetrations. Also need to review for location of 2 hr horiz wall. 10/29/2001 4:28:36 PM
|
BLD-Conference | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/23/2001 5:10:49 PM w/ supt...need remove extraneous pipes/penetrations from enclosures. 10/24/2001 5:26:25 PM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/23/2001 11:58:25 AM ###-####, Mel. 4th fl courts only 10/24/2001 11:38:11 AM
|
BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### al... grids at north 1/2 3rd fl ok to tile pend elec...recall 4th fl courtrms, need complete seismic & perimeters; Need actual layout of 2hr horiz exit wall where not per plans at 4th fl. 10/23/2001 12:01:06 PM
|
BLD-Conference | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/22/2001 3:36:43 PM w/ Tempra Wilson...Ada Co is req'd to have parking structure done prior to final occupancy...some pemits for project may have "flags" or "holds" placed...which affects ability to scedule inspections thru IVR.
|
BLD-Conference | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/17/2001 5:58:12 PM w/ Mel & ISI foreman at site...re grid ceiling reqs 10/18/2001 2:40:47 PM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/17/2001 5:58:49 PM 2nd fl perimeter rooms ok 10/18/2001 2:41:44 PM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### MEL 2nd fl grids ok to tile. 10/17/2001 12:36:12 PM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/17/2001 5:54:12 PM ...2nd fl; wires added at can lites/ grid per c/n...chk supports at holding cell halls grids 10/17/2001 6:01:28 PM
|
BLD-Framing/Rough-in | 10/12/2001 | 10/15/2001 | 10/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-#### complete wires at 2nd fl courtrooms can lites, halls, etc...ok to tile at conf rms only. 10/16/2001 10:54:32 AM
|
BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/10/2001 2:10:29 PM add'l c/n issued: support can lites w/ slack wire or show listing for bar hangers, complete firestops at roomsides
|
BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/10/2001 4:21:31 PM c/n: provide as built for 4th fl 2hr wall configuration, layout slightly changed from plan...show firestop listings for cable trays & large hydronic piping at same.
|
BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/8/2001 5:15:35 PM 2nd fl courts, Lee ###-#### court grids ok pend elec...complete firestops at corridor roomsides prior to tiles. reinsp req'd. Keep c/n. 10/9/2001 4:54:56 PM
|
BLD-Conference | 10/8/2001 | 10/8/2001 | 10/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/8/2001 9:05:11 AM w/cont re c/n of 10-4...keep c/n
|
BLD-Framing/Rough-in | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/8/2001 1:50:36 PM courtroom grid; lee...###-####. ###-#### office; need elec ok for grids, remove tile at west court per Jim Schmer. 10/8/2001 5:16:47 PM
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/5/2001 9:38:25 AM w/ ISI foreman, larry re c/n of 10-4...will submit detail re grid clg or comply w/ std.
|
BLD-Framing/Rough-in | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/3/2001 5:48:22 PM reinsp keep c/n re grid & firestops,perim wires are installed at 1st fl. 10/4/2001 12:15:32 PM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### mel horiz.exit wall firestops not complete 10/3/2001 5:50:53 PM
|
BLD-Conference | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 9/28/2001 5:09:02 PM mel ###-#### rec'd 2hr wall detail, incorrect. 10/1/2001 5:04:49 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 9/28/2001 4:39:54 PM mel ###-####...horiz. exit wall at 4th fl. needs complete firestops, standpipes are installed 10/1/2001 4:26:57 PM 10/1/2001 6:22:00 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 9/28/2001 4:35:15 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 9/28/2001 4:36:52 PM mel ###-####
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | FAIL |
Carl Dependahl
|
|
|
mel-- ###-#### fr carl i ran out of time to do these insp. 301 9/17/2001 7:12:22 PM c/n re firewall assy's, recall 9/21/2001 4:33:49 PM
|
BLD-Framing/Rough-in | 8/30/2001 | 9/4/2001 | 9/4/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 8/30/2001 2:12:37 PM walk thru, verbal c/n: need backing studs or listed assy at 2hr stair walls... complete firestops at all penetrations. 9/5/2001 3:43:50 PM
|
BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 8/30/2001 9:10:12 AM , called in error, no final. 8/30/2001 9:14:46 AM
|
BLD-Framing/Rough-in | 8/27/2001 | 8/29/2001 | 8/29/2001 | A | PART |
Carl Dependahl
|
|
|
MEL-- ###-#### FR still need gyp assy details ; walk thru, WIP 8/30/2001 3:54:25 PM
|
BLD-Conference | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 8/21/2001 9:47:12 AM mel ###-####...need all reports/ affidavits; keep c/n re frame details for 2hr walls 8/21/2001 4:36:25 PM 8/21/2001 4:37:15 PM
|
BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Carl Dependahl
|
|
|
mil ###-####, kee 8/14/2001 11:37:52 AM p c/n ISI to provide details as req'd 8/14/2001 11:38:18 AM
|
BLD-Conference | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/13/2001 3:41:39 PM w/ Mel re c/n on priorc/n
|
BLD-Framing/Rough-in | 7/16/2001 | 7/17/2001 | 7/17/2001 | P | PART |
Jim Storey
|
|
|
FR INSP MEL- ###-#### 4 th and 3rd center stair encloser not complet gyp assembly wing walls into corridor/ shaft core board not stagered min 24 inchs at butt joints/ hard ceillings wire support spacing ? 7/18/2001 10:39:27 AM
|
BLD-Framing/Rough-in | 6/29/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 6/29/2001 3:20:27 PM walk through; need detail for 2hr stairs...rc & 2 layers gyp? 7/2/2001 4:33:19 PM
|
BLD-Framing/Rough-in | 6/26/2001 | 6/26/2001 | 6/29/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### keep c/n; wip 6/29/2001 3:21:20 PM
|
BLD-Conference | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/27/2001 5:19:37 PM w / ISI re rated wall details
|
BLD-Framing/Rough-in | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/14/2001 1:37:28 PM wip...
|
BLD-Conference | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/11/2001 4:40:30 PM re floor boxes w/ eng's " judgement "...install as per detail shown
|
BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Carl Dependahl
|
|
|
firestop for floor mel ###-#### boxes, maintain engs detail 6/14/2001 3:19:37 PM
|
BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PART |
Carl Dependahl
|
|
|
Mel ###-####, need shaft fl 3-5, wip 6/7/2001 4:40:18 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/31/2001 3:34:41 PM w.i.p... keep c/n.
|
BLD-Conference | 5/17/2001 | 5/17/2001 | 5/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/17/2001 8:56:36 AM w arch & proj eng'r re framing issues, keep cn
|
BLD-Framing/Rough-in | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; c/n, need clarification of rating for wall at bsmt corridor, install 2hr dampers per listing & complete wall assy's per listing & plans.Install shaft framing for hvac exhaust at 3rd fl & up , complete closure for 2hr exit pass. at 1st fl east side5/11/2001 4:13:06 PM 5/11/2001 4:15:01 PM
|
BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/9/2001 10:42:36 AM walk through...need shafts at hvac exhaust ducts fl 3,4
|
BLD-Framing/Rough-in | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Carl Dependahl
|
|
|
Mil ###-####; 4th/ 5th fl curtain wall firestops ok; Need shafts for hvac-exhaust from 3rd fl at areas2,3 , and as req'd...compleat main 2hr shafts through out, replace core bd as needed due to damage 5/3/2001 4:38:59 PM 5/3/2001 4:40:57 PM
|
BLD-Wall cover | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/27/2001 4:19:39 PM knee walls 2nd fl ok
|
BLD-Conference | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/25/2001 5:52:27 PM rec'd spec insp reports for firestops at curtain walls..ok to begin cover at knee walls 2nd fl.
|
BLD-Framing/Rough-in | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Carl Dependahl
|
|
|
###-####, curtain wall firestops 3rd fl ok, seismic bracing at lobby grid ok 4/16/2001 4:40:19 PM
|
BLD-Conference | 4/11/2001 | 4/11/2001 | 4/11/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/11/2001 5:39:12 PM rec'd curtain wall firestop detail
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### may need clarification of 4hr occ. wall "closure" at bsmt...is lid 4hr?? 4/11/2001 5:45:59 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####;c/n, need detail for top of elev shaft, fasten core bd.at corners of shafts 4/4/2001 12:33:02 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | NR |
Jim Storey
|
|
|
###-#### ran out of tlled for requist for 33/29/2001ime ca 3/28/2001 4:17:31 PM
|
BLD-Framing/Rough-in | 3/21/2001 | 3/21/2001 | 3/21/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/21/2001 5:27:07 PM need submittal for mod's at elev. machine room; fasten edges of shaft wall mat'l at tracks (corners), reinsp
|
BLD-Other | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 11:58:57. Contact: ###-####... 3/23/2001 5:36:08 PM wip. need details for top of shaft; replace shaft wall as needed 3/23/2001 5:36:53 PM
|
BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/8/2001 5:10:08 PM w/ J. Menard and Carl W on resub...need further info for top of shaft
|
BLD-Framing/Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PART |
Carl Dependahl
|
|
|
Mel ###-####; reviewed shaft resub w/ arch...ok if firestop specified on drawings (elev. motor assy.) 3/9/2001 5:29:24 PM
|
BLD-Conference | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/11/2001 12:22:06 PM walk-thru w/ supt.
|
BLD-Conference | 1/9/2001 | 1/9/2001 | 1/9/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/9/2001 6:06:10 PM w/ super at site,
|
BLD-Conference | 12/20/2000 | 12/20/2000 | 12/20/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/20/2000 10:45:57 AM w/ proj eng'r: need resubmit or verify listing for putty pads at boxes in 2hr floors
|
BLD-Conference | 12/19/2000 | 12/19/2000 | 12/19/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/19/2000 3:32:18 PM w/ Laura patton re floor penetrations
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 3/28/2000 | A | PART |
Carl Dependahl
|
|
|
fr insp mel- ###-#### ; reviewed 2hr wall detail, need install rock wool or SAFB ? 9/28/2001 5:14:27 PM
|
BLD-Framing/Rough-in | 3/13/2001 | 3/13/2001 | 3/16/2000 | P | NR |
Carl Dependahl
|
|
|
###-####,need info for elev 3/16/2001 4:01:39 PM
|