BLD-Aging Inspection | 4/21/2003 | 4/21/2003 | 4/21/2003 | | PART |
Jim Storey
|
|
|
paul working with cathy w. 4/21/2003 4:39:42 PM
|
BLD-Aging Inspection | 2/17/2003 | 2/17/2003 | 2/17/2003 | | PASS |
Jim Storey
|
|
|
paul markalina and doug karcher are looking through the micron archive to locate the lost card . 2/19/2003 8:10:50 AM
|
FIRE-Final Inspection | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 11/20/2001 7:19:45 PM
|
BLD-Framing/Rough-in | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/08/2001 at 17:14:56. Contact: ###-####. called in on wrong permit # 2/12/2001 12:59:09 PM
|
BLD-Concrete | 11/9/2000 | 11/13/2000 | 11/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 16:26:51. Contact: ###-####. placed with special insp. pending report. 11/13/2000 9:31:25 PM
|
BLD-Concrete | 11/1/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 10:58:23. Contact: ###-####. placed with special insp pending report. 11/3/2000 3:14:04 PM
|
BLD-Concrete | 11/1/2000 | 11/2/2000 | 11/2/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 10:57:40. Contact: ###-####. placed with special insp; pending report. 11/2/2000 9:44:00 AM
|
BLD-Concrete | 11/1/2000 | 11/1/2000 | 11/1/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/01/2000 at 10:56:59. Contact: ###-####. placed with special insp.pending report. 11/1/2000 4:12:59 PM
|
BLD-Concrete | 10/26/2000 | 10/30/2000 | 10/30/2000 | P | PART |
Jim Storey
|
|
|
Steve ###-####
|
BLD-Concrete | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/25/2000 at 15:42:23. Contact: ###-####. placed w special insp pending report. 10/26/2000 1:26:21 PM
|
BLD-Concrete | 10/23/2000 | 10/25/2000 | 10/25/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
|
BLD-Concrete | 10/23/2000 | 10/25/2000 | 10/25/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
|
BLD-Concrete | 10/23/2000 | 10/24/2000 | 10/24/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:03. Contact: ###-####. placed with special insp. pending report. 10/24/2000 2:10:00 PM
|
BLD-Concrete | 10/19/2000 | 10/23/2000 | 10/23/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 14:32:01. Contact: ###-####.
|
BLD-Concrete | 10/19/2000 | 10/19/2000 | 10/19/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 07:37:37. Contact: ###-####. pending report. 10/19/2000 5:05:48 PM
|
BLD-Concrete | 10/17/2000 | 10/17/2000 | 10/17/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/17/2000 at 09:11:13. Contact: ###-####.
|
BLD-Footing | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Jim Storey
|
|
|
ft insp-- steve ###-#### placed w/special insp. 9/25/2000 2:58:39 PM
|
BLD-Concrete | 9/21/2000 | 9/22/2000 | 9/22/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/21/2000 at 16:43:09. Contact: ###-####.
|
BLD-Concrete | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
|
BLD-Concrete | 9/20/2000 | 9/20/2000 | 9/20/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
|
BLD-Concrete | 9/18/2000 | 9/19/2000 | 9/19/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/18/2000 at 13:58:20. Contact: ###-####. slab ok 9/19/2000 9:03:13 AM
|
BLD-Concrete | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 07:12:35. Contact: ###-####. walls on elavator pit top out apears ok pending special insp report. rebar inprogress. 9/14/2000 3:54:36 PM
|
BLD-Concrete | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 10:14:21. Contact: ###-####. covered with special insp. pending reports. 9/13/2000 5:52:35 PM
|
BLD-Concrete | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:52. Contact: ###-####. pending report. 9/12/2000 8:50:43 AM
|
BLD-Concrete | 9/11/2000 | 9/11/2000 | 9/11/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:08. Contact: ###-####. pending report. 9/11/2000 4:54:50 PM
|
BLD-Concrete | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 07:26:48. Contact: ###-####. pending sp nsp aprovals 9/8/2000 2:16:04 PM
|
BLD-Concrete | 9/6/2000 | 9/7/2000 | 9/7/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/06/2000 at 13:31:32. Contact: ###-####. pending sp insp approvals 9/8/2000 7:20:57 AM
|
BLD-Concrete | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | PART |
|
|
|
steve-- ###-#### ext 241--for concrete for the 1st slab pur pending sp insp approvals 9/6/2000 11:47:13 AM
|
BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:50:45. Contact: ###-####. rebar ok pending report from special insp. 8/29/2000 10:12:03 AM
|
BLD-Footing | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 10:59:30. Contact: ###-####.
|
BLD-Foundation | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/24/2000 at 08:19:23. Contact: ###-####. area #6 rebar and pads ok. 8/24/2000 3:58:35 PM
|
BLD-Footing | 8/21/2000 | 8/22/2000 | 8/22/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/21/2000 at 15:58:04. Contact: ###-####. cold joint in footing no horrizontal splice bar/ lap on horr bar not stagered spice at laps/ rain leader piping three locations not compacted under footing/ #4 bar tranverse to slab spacing over 3 ft spec. aprox. 40 to 42 inches o.c./ trench footing needs cleaned loose dirt. 8/22/2000 9:36:42 AM
|
BLD-Footing | 8/14/2000 | 8/15/2000 | 8/15/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/14/2000 at 16:54:52. Contact: ###-####. n/r 8/15/2000 5:07:19 PM
|
BLD-Foundation | 8/11/2000 | 8/14/2000 | 8/14/2000 | A | PART |
Jim Storey
|
|
|
Steve Smith ###-#### ext 41 they are going to start pouring at 10 covered by special insp pending report 8/14/2000 10:22:39 AM. 8/14/2000 10:22:44 AM
|