StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #36-PC 3157
Customer NumberPCS 3157
ePlanReviewNo
Description
MICRON BUILDING #36 SECTIONS "B,C &D" (PCS 3157) * TO CONSTRUCT A NEW 216,000 SQ. FT., TWO STORY WITH A 2100 SQ. FT. BASEMENT OFFICE SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS BEING CONSTRUCTED OF CONCRETE TILT-UP EXTERIOR WALLS, STEEL FRAME AND MASONRY AREA SEPARATION WALLS. THIS BUILDING IS BEING DIVIDED INTO THREE 72,000 SQ. FT., TWO STORY SECTIONS BY TWO-HOUR FIRE-RESISTIVE AREA SEPARATION WALLS FOR ALLOWABLE AREA REQUIREMENTS. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ALLOWABLE AREA INCREASE. THE ONE STORY CAFETERIA SECTION IS BEING CONSTRUCTED UNDER A SEPARATE PERMIT (bld00-01980). THIS BUILDING IS A CONTINUATION OF THE BUILDING #24 EXPANSION BEING CONSTRUCTED UNDER SEPARATE PERMITS. THIS IS A SHELL PERMIT ONLY. NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH00-00072/PC#467-00/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/21/20034/21/20034/21/2003 PART
DetailsJim Storey
paul working with cathy w. 4/21/2003 4:39:42 PM
BLD-Aging Inspection2/17/20032/17/20032/17/2003 PASS
DetailsJim Storey
paul markalina and doug karcher are looking through the micron archive to locate the lost card . 2/19/2003 8:10:50 AM
FIRE-Final Inspection11/20/200111/20/200111/20/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 11/20/2001 7:19:45 PM
BLD-Framing/Rough-in2/8/20012/9/20012/9/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/08/2001 at 17:14:56. Contact: ###-####. called in on wrong permit # 2/12/2001 12:59:09 PM
BLD-Concrete11/9/200011/13/200011/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/09/2000 at 16:26:51. Contact: ###-####. placed with special insp. pending report. 11/13/2000 9:31:25 PM
BLD-Concrete11/1/200011/3/200011/3/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:58:23. Contact: ###-####. placed with special insp pending report. 11/3/2000 3:14:04 PM
BLD-Concrete11/1/200011/2/200011/2/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:57:40. Contact: ###-####. placed with special insp; pending report. 11/2/2000 9:44:00 AM
BLD-Concrete11/1/200011/1/200011/1/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/01/2000 at 10:56:59. Contact: ###-####. placed with special insp.pending report. 11/1/2000 4:12:59 PM
BLD-Concrete10/26/200010/30/200010/30/2000PPART
DetailsJim Storey
Steve ###-####
BLD-Concrete10/25/200010/26/200010/26/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/25/2000 at 15:42:23. Contact: ###-####. placed w special insp pending report. 10/26/2000 1:26:21 PM
BLD-Concrete10/23/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
BLD-Concrete10/23/200010/25/200010/25/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:45. Contact: ###-####.
BLD-Concrete10/23/200010/24/200010/24/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2000 at 16:31:03. Contact: ###-####. placed with special insp. pending report. 10/24/2000 2:10:00 PM
BLD-Concrete10/19/200010/23/200010/23/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/19/2000 at 14:32:01. Contact: ###-####.
BLD-Concrete10/19/200010/19/200010/19/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/19/2000 at 07:37:37. Contact: ###-####. pending report. 10/19/2000 5:05:48 PM
BLD-Concrete10/17/200010/17/200010/17/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/17/2000 at 09:11:13. Contact: ###-####.
BLD-Footing9/25/20009/25/20009/25/2000PPART
DetailsJim Storey
ft insp-- steve ###-#### placed w/special insp. 9/25/2000 2:58:39 PM
BLD-Concrete9/21/20009/22/20009/22/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/21/2000 at 16:43:09. Contact: ###-####.
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
BLD-Concrete9/20/20009/20/20009/20/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 08:30:34. Contact: ###-####. placed with special insp. 9/20/2000 5:22:33 PM
BLD-Concrete9/18/20009/19/20009/19/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/18/2000 at 13:58:20. Contact: ###-####. slab ok 9/19/2000 9:03:13 AM
BLD-Concrete9/14/20009/14/20009/14/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/14/2000 at 07:12:35. Contact: ###-####. walls on elavator pit top out apears ok pending special insp report. rebar inprogress. 9/14/2000 3:54:36 PM
BLD-Concrete9/13/20009/13/20009/13/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/13/2000 at 10:14:21. Contact: ###-####. covered with special insp. pending reports. 9/13/2000 5:52:35 PM
BLD-Concrete9/11/20009/12/20009/12/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:52. Contact: ###-####. pending report. 9/12/2000 8:50:43 AM
BLD-Concrete9/11/20009/11/20009/11/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/11/2000 at 11:05:08. Contact: ###-####. pending report. 9/11/2000 4:54:50 PM
BLD-Concrete9/8/20009/8/20009/8/2000PPART
Details
Scheduled by a contractor via Hello! on 09/08/2000 at 07:26:48. Contact: ###-####. pending sp nsp aprovals 9/8/2000 2:16:04 PM
BLD-Concrete9/6/20009/7/20009/7/2000APART
Details
Scheduled by a contractor via Hello! on 09/06/2000 at 13:31:32. Contact: ###-####. pending sp insp approvals 9/8/2000 7:20:57 AM
BLD-Concrete9/5/20009/6/20009/6/2000APART
Details
steve-- ###-#### ext 241--for concrete for the 1st slab pur pending sp insp approvals 9/6/2000 11:47:13 AM
BLD-Footing8/28/20008/29/20008/29/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/28/2000 at 15:50:45. Contact: ###-####. rebar ok pending report from special insp. 8/29/2000 10:12:03 AM
BLD-Footing8/28/20008/28/20008/28/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/28/2000 at 10:59:30. Contact: ###-####.
BLD-Foundation8/24/20008/24/20008/24/2000PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/24/2000 at 08:19:23. Contact: ###-####. area #6 rebar and pads ok. 8/24/2000 3:58:35 PM
BLD-Footing8/21/20008/22/20008/22/2000AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/21/2000 at 15:58:04. Contact: ###-####. cold joint in footing no horrizontal splice bar/ lap on horr bar not stagered spice at laps/ rain leader piping three locations not compacted under footing/ #4 bar tranverse to slab spacing over 3 ft spec. aprox. 40 to 42 inches o.c./ trench footing needs cleaned loose dirt. 8/22/2000 9:36:42 AM
BLD-Footing8/14/20008/15/20008/15/2000PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/14/2000 at 16:54:52. Contact: ###-####. n/r 8/15/2000 5:07:19 PM
BLD-Foundation8/11/20008/14/20008/14/2000APART
DetailsJim Storey
Steve Smith ###-#### ext 41 they are going to start pouring at 10 covered by special insp pending report 8/14/2000 10:22:39 AM. 8/14/2000 10:22:44 AM