BLD-Final | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
cecil ###-#### ok for perm occ 2/4/2002 3:37:07 PM
|
FIRE-Final Inspection | 1/31/2002 | 2/1/2002 | 2/1/2002 | P | PASS |
Troy Cobbley
|
|
|
Fire life/safety OK. Fire alarm and fire sprinkler systems finaled 2/1/2002 4:22:51 PM
|
FIRE-Final Inspection | 1/22/2002 | 1/24/2002 | 1/24/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide fire extinguishers in the penthouse and basement electrical rooms, elevator recall does not work, a bush obstructs the FDC, paint curbing per sheet A1.0, provide no parking signs per note 13, provide secondary containment verification for the emergency generator, provide offsite monitoring of the fire sprinkler system, provide floor signage and use stairs signs at elevators per notes 28 and 29, install door at ground level south exit, provide door on 2nd floor electrical room, verify life/safety and fire alarm and fire sprinkler in room at end of link and in Meditation room, provide door to remain unlocked sticker on both main exit doors 1/25/2002 3:12:17 PM
|
BLD-Conference | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 1/9/2002 12:32:58 PM ok to just screw on dry wall on 1 hr ext east wall 1/9/2002 2:34:14 PM
|
BLD-Wall cover | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 12/20/2001 4:07:45 PM exp joint at link 12/20/2001 4:15:37 PM
|
BLD-Wall cover | 12/14/2001 | 12/17/2001 | 12/17/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 12/14/2001 2:54:04 PM this for the link wip on link fire protection 12/17/2001 9:30:13 AM
|
BLD-Conference | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 12/3/2001 4:12:04 PM wip 12/3/2001 6:21:19 PM
|
BLD-Conference | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 11/15/2001 12:06:19 PM meeting at 1 pm
|
BLD-Conference | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 11/6/2001 3:02:40 PM 11 am
|
BLD-Conference | 11/6/2001 | 11/6/2001 | 11/6/2001 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 11/6/2001 2:58:55 PM 11 am
|
BLD-Conference | 8/21/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 8/21/2001 9:48:00 PM curtain wall ok grid 1st floor entry ok
|
BLD-Conference | 8/6/2001 | 8/6/2001 | 8/7/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 8/6/2001 11:39:51 PM CURTAIN WALL CAN NOT BE CONTINOUS AT CORNERS CALLED GEORGE FOR ANOTHR CONFERENCE 8/7/2001 3:14:25 AM
|
BLD-Conference | 5/10/2001 | 5/10/2001 | 5/10/2001 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 5/10/2001 11:26:59 AM
|
BLD-Conference | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 5/10/2001 11:28:43 AM WIP 5/10/2001 3:16:15 PM
|
BLD-Conference | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 5/4/2001 3:02:44 PM wip curtian wall and f/p of steel
|
BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/30/2001 2:23:07 PM
|
BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | CANC |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/30/2001 3:58:52 PM
|
BLD-Framing/Rough-in | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 14:36:41. Contact: ###-####. ok to rock penthouse 4/9/2001 1:20:58 PM
|
BLD-Framing/Rough-in | 3/28/2001 | 3/29/2001 | 3/29/2001 | P | NR |
Tom Arcoraci
|
|
|
roof drains... Jim ###-#### ready at 2 will resced 3/29/2001 1:48:11 PM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | CANC |
Tom Arcoraci
|
|
|
waste and water in the basement and first floor Robert ###-#### not there after 3:30
|
BLD-Framing/Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | CANC |
Tom Arcoraci
|
|
|
waste and water in the basement and first floor Robert ###-#### not there after 3:30
|
BLD-Concrete | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Alan Hauser
|
|
|
slab\\###-####
|
BLD-Footing | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Dave Hannah
|
|
|
FT INSP-- CECIL ###-####
|
BLD-Foundation | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### wip spec insp on site 10/19/2000 10:20:29 AM
|
BLD-Foundation | 10/12/2000 | 10/13/2000 | 10/13/2000 | A | PART |
Alan Hauser
|
|
|
Cecil ###-####
|
BLD-Footing | 10/5/2000 | 10/6/2000 | 10/6/2000 | A | PART |
Tom Arcoraci
|
|
|
ft insp ft & found-- cecil ###-####
|
BLD-Foundation | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/27/2000 at 12:54:44. Contact: ###-####.ok pending report 9/28/2000 11:42:50 AM
|
BLD-Footing | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 11:36:16. Contact: ###-####. placed w/special insp. 9/21/2000 9:09:28 AM
|
BLD-Foundation | 9/14/2000 | 9/15/2000 | 9/15/2000 | A | PART |
Tony Young
|
|
|
CECIL ###-#### FOUND INSP
mti special inspector on site 9/15/2000 8:59:39 AM
|
BLD-Foundation | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 12:21:08. Contact: ###-####.
|
BLD-Footing | 8/23/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 08:56:47. Contact: ###-####. spec insp on site 8/24/2000 11:47:10 AM
|
BLD-Footing | 8/24/2000 | 8/24/2000 | 8/24/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/24/2000 mti onsite
|