SAINT ALPHONSUS MEDICAL OFFICE BUILDING #6 SHELL AND CORE * TO CONSTRUCT A NEW 60,350 SQ. FT., FOUR STORY, WITH 15,665 SQ. FT. BASEMENT, SHELL & CORE MEDICAL OFFICE BUILDING AND RELATED SITE IMPROVEMENYS. THIS BUILDING WILL BE CONSTRUCTED OF STEEL STRUCTURAL FRAME, CONCRETE PAN DECK FLOORS, METAL ROOF DECK, METAL EXTERIOR NONBEARING STUD WALLS AND MASONRY STAIR ENCLOSURES. THE PERMIT ALSO INCLUDES THE CONSTRUCTION OF A 155 LINEAL FOOT BY 14 FOOT WIDE NONCOMBUSTIBLE ELEVATED PEDESTRIAN WALKWAY LINK FROM THE SOUTHEAST CORNER OF THE THIRD FLOOR OF BUILDING #6 TO THE NORTHWEST CORNER OF THE EXISTING NORTH TOWER OFFICE BUILDING TO THE SOUTH. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS SHELL AND CORE PERMIT ONLY, NO OCCUPANCY IS ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. THIS BUILDING IS FULLY FIRE SPRINKLED. FIRE SPRINKLERS OVERHEAD/UNDERGROUND AND FIRE ALARM WORK REQUIRE SEPERATE PLAN REVIEWS AND PERMITTING BY THE FIRE DEPARTMENT. DUP98-00142/DRH98-00196/PC#474-00 GRADING BLD98-03934. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/4/20022/4/20022/4/2002PPASS
DetailsTom Arcoraci
cecil ###-#### ok for perm occ 2/4/2002 3:37:07 PM
FIRE-Final Inspection1/31/20022/1/20022/1/2002PPASS
DetailsTroy Cobbley
Fire life/safety OK. Fire alarm and fire sprinkler systems finaled 2/1/2002 4:22:51 PM
FIRE-Final Inspection1/22/20021/24/20021/24/2002AFAIL
DetailsTroy Cobbley
provide fire extinguishers in the penthouse and basement electrical rooms, elevator recall does not work, a bush obstructs the FDC, paint curbing per sheet A1.0, provide no parking signs per note 13, provide secondary containment verification for the emergency generator, provide offsite monitoring of the fire sprinkler system, provide floor signage and use stairs signs at elevators per notes 28 and 29, install door at ground level south exit, provide door on 2nd floor electrical room, verify life/safety and fire alarm and fire sprinkler in room at end of link and in Meditation room, provide door to remain unlocked sticker on both main exit doors 1/25/2002 3:12:17 PM
BLD-Conference1/9/20021/9/20021/9/2002PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 1/9/2002 12:32:58 PM ok to just screw on dry wall on 1 hr ext east wall 1/9/2002 2:34:14 PM
BLD-Wall cover12/20/200112/20/200112/20/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/20/2001 4:07:45 PM exp joint at link 12/20/2001 4:15:37 PM
BLD-Wall cover12/14/200112/17/200112/17/2001APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/14/2001 2:54:04 PM this for the link wip on link fire protection 12/17/2001 9:30:13 AM
BLD-Conference12/3/200112/3/200112/3/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 12/3/2001 4:12:04 PM wip 12/3/2001 6:21:19 PM
BLD-Conference11/15/200111/16/200111/16/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/15/2001 12:06:19 PM meeting at 1 pm
BLD-Conference11/6/200111/7/200111/7/2001APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/6/2001 3:02:40 PM 11 am
BLD-Conference11/6/200111/6/200111/6/2001ACANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 11/6/2001 2:58:55 PM 11 am
BLD-Conference8/21/20018/21/20018/21/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 8/21/2001 9:48:00 PM curtain wall ok grid 1st floor entry ok
BLD-Conference8/6/20018/6/20018/7/2001PFAIL
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 8/6/2001 11:39:51 PM CURTAIN WALL CAN NOT BE CONTINOUS AT CORNERS CALLED GEORGE FOR ANOTHR CONFERENCE 8/7/2001 3:14:25 AM
BLD-Conference5/10/20015/10/20015/10/2001ACANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 5/10/2001 11:26:59 AM
BLD-Conference5/10/20015/10/20015/10/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 5/10/2001 11:28:43 AM WIP 5/10/2001 3:16:15 PM
BLD-Conference5/4/20015/4/20015/4/2001PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 5/4/2001 3:02:44 PM wip curtian wall and f/p of steel
BLD-Conference4/30/20014/30/20014/30/2001APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 4/30/2001 2:23:07 PM
BLD-Conference4/30/20014/30/20014/30/2001PCANC
DetailsTom Arcoraci
Added by Inspector: 408 On 4/30/2001 3:58:52 PM
BLD-Framing/Rough-in4/6/20014/9/20014/9/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/06/2001 at 14:36:41. Contact: ###-####. ok to rock penthouse 4/9/2001 1:20:58 PM
BLD-Framing/Rough-in3/28/20013/29/20013/29/2001PNR
DetailsTom Arcoraci
roof drains... Jim ###-#### ready at 2 will resced 3/29/2001 1:48:11 PM
BLD-Framing/Rough-in2/13/20012/13/20012/13/2001PCANC
DetailsTom Arcoraci
waste and water in the basement and first floor Robert ###-#### not there after 3:30
BLD-Framing/Rough-in2/13/20012/13/20012/13/2001PCANC
DetailsTom Arcoraci
waste and water in the basement and first floor Robert ###-#### not there after 3:30
BLD-Concrete11/9/200011/13/200011/13/2000APART
DetailsAlan Hauser
slab\\###-####
BLD-Footing10/26/200010/27/200010/27/2000APART
DetailsDave Hannah
FT INSP-- CECIL ###-####
BLD-Foundation10/18/200010/19/200010/19/2000APART
DetailsTom Arcoraci
###-#### wip spec insp on site 10/19/2000 10:20:29 AM
BLD-Foundation10/12/200010/13/200010/13/2000APART
DetailsAlan Hauser
Cecil ###-####
BLD-Footing10/5/200010/6/200010/6/2000APART
DetailsTom Arcoraci
ft insp ft & found-- cecil ###-####
BLD-Foundation9/27/20009/28/20009/28/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/27/2000 at 12:54:44. Contact: ###-####.ok pending report 9/28/2000 11:42:50 AM
BLD-Footing9/20/20009/21/20009/21/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/20/2000 at 11:36:16. Contact: ###-####. placed w/special insp. 9/21/2000 9:09:28 AM
BLD-Foundation9/14/20009/15/20009/15/2000APART
DetailsTony Young
CECIL ###-#### FOUND INSP
mti special inspector on site 9/15/2000 8:59:39 AM
BLD-Foundation9/7/20009/8/20009/8/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/07/2000 at 12:21:08. Contact: ###-####.
BLD-Footing8/23/20008/24/20008/24/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/23/2000 at 08:56:47. Contact: ###-####. spec insp on site 8/24/2000 11:47:10 AM
BLD-Footing8/24/20008/24/20008/24/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/24/2000 mti onsite