BLD-Final | 1/5/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Jim Storey
|
|
|
FN OCC ROB-- ###-#### OK FOR L/C CARD WITH CONTRACTOR. 1/8/2001 11:51:37 AM
|
BLD-Final | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/04/2001 at 10:51:55. Contact: ###-####.
|
BLD-Final | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/30/2000 at 07:38:40. Contact: ###-####. need change from arc. for canopy to metal covering from approved cloth. 11/30/2000 1:21:10 PM
|
FIRE-Final Inspection | 9/15/2000 | 9/15/2000 | 9/15/2000 | A | PASS |
Rick Jackson
|
|
|
###-#### per card final okay for c/o.mps
|
BLD-Final | 9/14/2000 | 9/14/2000 | 9/14/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/14/2000 at 11:10:35. Contact: ###-####. west walkway ok. 9/14/2000 3:15:49 PM
|
BLD-Final | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/13/2000 at 08:25:38. Contact: ###-####. walkways ok stairs and handrails ok pending canopys. 9/13/2000 5:40:00 PM
|
BLD-Final | 9/5/2000 | 9/6/2000 | 9/6/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 15:14:59. Contact: ###-####. ok for temp on the west area stairs. detail 3 on a/7 to be followed 9/6/2000 9:40:29 AM
|
BLD-Final | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 09/05/2000 at 09:05:03. Contact: ###-####. still need insp of the landing for the first phase stairs 9/5/2000 3:10:33 PM
|
FIRE-Sprinkler Rough-in | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PASS |
Rick Jackson
|
|
|
ANN ###-#### FIRE R/I
|
BLD-Framing/Rough-in | 9/1/2000 | 9/1/2000 | 9/1/2000 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/01/2000 at 11:05:54. Contact: ###-####.
|