Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01797
StatusFinaled
Name S-SIXTEEN LIMITED PARTNERSHIP
Site Address 7607 S EISENMAN RD
Project NameIDAHO AUTO AUCTION
Customer Number 
ePlanReviewNo
Description
NEW RECONDITION BUILDING FOR THE IDAHO AUTO AUCTION * A NEW 10.950 SQ. FT. ONE STORY, TYPE V-N, PRE-MANUFACTURED METAL BUILDING. A NEW 1000 GALLON SAND AND GREASE TRAP WILL BE INSTALLED AND CONNECTED ALONG WITH THE SANITARY SEWER LINES TO AN EXISTING SANITARY LINE WEST OF THE BUILDING. THE NEW FACILITY WILL HAVE MECHANICAL ROOM, KITCHEN, RESTROOMS, LAUNDRY ROOM AND A OFFICE. SITE WORK WAS COMPLETED UNDER A PREVIOUS BUILDING PERMIT NUMBER. BLD99-03056 OPERATIONS AS APPROVED INCLUDE WASHING AND DETAILING OPERATIONS IN THE S-3 PORTION OF THE BUILDING. NO OTHER STRUCTURES ON THIS SITE ARE INCLUDED UNDER THIS PERMIT. 1-10-01 -ARCHITECT HAS PROVIDED A LETTER ASKING TO CHANGE THE TYPE OF CONSTRUCTION FOR THIS PROJECT TO A V-N. THE BUILDING IS WITHIN ALLOWABLE AREAS AND THE USES ARE COMPATIABLE THEREFORE THE REQUEST HAS BEEN APPROVED. M. OTTO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/13/20014/13/2001 DONE
Details
BLD-Final4/3/20014/3/20014/3/2001PPART
DetailsJim Storey
###-#### Rod pending ele and plm to sign off on perm . 4/3/2001 4:21:00 PM
FIRE-Final Inspection3/21/20013/21/20013/21/2001PPASS
DetailsRick Jackson
###-####
BLD-Framing/Rough-in2/12/20012/12/20012/12/2001PPASS
DetailsJim Storey
###-####
BLD-Framing/Rough-in2/12/20012/12/20012/12/2001PPASS
DetailsJim Storey
###-####
BLD-Conference2/6/20012/6/20012/6/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/6/2001 4:46:18 PM w/ supt...ok to photo washer box firestop at "FIREWALL"
BLD-Framing/Rough-in1/31/20012/1/20012/1/2001PFAIL
DetailsCarl Dependahl
###-####, c/n, need firestop assys at 1hr occ. walls...washer box.conduit, etc. ok to cover as noted. need clarify extent of occ. sep. walls. 2/1/2001 4:38:15 PM
BLD-Conference1/11/20011/12/20011/12/2001APASS
DetailsJim Storey
FOR CONF ROD-- ###-#### worked out occ wall septation of hotisy rm and dryer rm 1 hr wall configuration framing. 1/12/2001 9:33:51 AM
BLD-Conference1/5/20011/8/20011/8/2001APASS
DetailsJim Storey
###-#### ROD FOR CONF REVIEWEFD OCC SEWCPTRATIONS. 1/8/2001 11:21:46 AM
BLD-Foundation9/29/200010/2/200010/2/2000APART
DetailsJim Storey
###-#### pending special insp. report. 10/2/2000 9:12:16 AM
BLD-Foundation9/26/20009/28/20009/28/2000APART
DetailsJim Storey
Rod ###-#### placed with special insp.pendig report. 9/28/2000 1:38:18 PM
BLD-Footing9/22/20009/25/20009/25/2000APART
DetailsJim Storey
ft rod-- ###-#### placed w/ special insp. pending report. 9/25/2000 11:43:05 AM
BLD-Footing9/19/20009/20/20009/20/2000APASS
DetailsJim Storey
Rod ###-#### rebar ok. 9/20/2000 10:24:38 AM
BLD-Concrete9/15/20009/18/20009/18/2000PNR
DetailsJim Storey
###-#### pre-const. 9/18/2000 4:56:21 PM