BLD-Final | 11/8/2000 | 11/9/2000 | 11/9/2000 | A | PASS |
Russ Owen
|
|
|
###-####Isabel###-####
|
BLD-Final | 11/9/2000 | 11/9/2000 | 11/9/2000 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 11/9/2000
|
Permanent Occupancy | | 11/8/2000 | 11/8/2000 | | DONE |
|
|
|
|
BLD-Final | 11/6/2000 | 11/7/2000 | 11/7/2000 | P | PART |
Russ Owen
|
|
|
Isabel Bruce ###-#### OK temp,need to resolve tie-down installation with engineer. 11/8/2000 2:22:45 PM
|
FIRE-Final Inspection | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Rick Jackson
|
|
|
Modular C Isabel Bruce ###-####
|
FIRE-Final Inspection | 10/27/2000 | 10/27/2000 | 10/27/2000 | P | CANC |
Russ Owen
|
|
|
andy ###-####
|
BLD-Final | 10/20/2000 | 10/20/2000 | 10/20/2000 | P | FAIL |
Tony Young
|
|
|
bob orr ###-####
c/n posted, verify trade sign offs, have eng. give revision on modular hold downs or change out to be like plans
10/20/2000 2:50:21 PM
|
BLD-Framing/Rough-in | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | FAIL |
Russ Owen
|
|
|
deck Bob orr ###-####no plans bottom steps exceeds 7". 10/12/2000 8:43:19 AM c/n 10/12/2000 8:43:24 AM
|
BLD-Framing/Rough-in | 10/9/2000 | 10/10/2000 | 10/10/2000 | A | PART |
Russ Owen
|
|
|
BOB ###-#### FR 1/2 of inside shear walls,provide details for fire stoping coridor .and complete framing at stage/corridor walls like plans. 10/10/2000 12:12:45 PM
|
BLD-Framing/Rough-in | 10/6/2000 | 10/9/2000 | 10/9/2000 | P | CANC |
Russ Owen
|
|
|
after 3:00\\###-####-- CANCEL PER BOB ORR
|
BLD-Framing/Rough-in | 10/6/2000 | 10/9/2000 | 10/9/2000 | P | FAIL |
Russ Owen
|
|
|
after 3:00\\###-####
|
BLD-Conference | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PART |
Russ Owen
|
|
|
CONF INSP---- ANDY ERSTAD-- ###-#### --CALL 1ST BEFORE INSP Conference by 408. 8/31/2000 11:43:29 AM
|