Permanent Occupancy | | 12/8/2000 | 12/8/2000 | | DONE |
|
|
|
|
BLD-Final | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 15:51:19. Contact: .
|
FIRE-Final Inspection | 12/5/2000 | 12/5/2000 | 12/5/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/05/2000 at 07:35:11. Contact: .
|
FIRE-Final Inspection | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 11/30/2000 4:22:48 PM //// c/n issued - air balance report; extinguishers; address; remote LEDs for duct detectors - not tested; emergency lights 11/30/2000 4:24:43 PM
|
FIRE-Sprinkler Rough-in | 11/30/2000 | 11/30/2000 | 11/30/2000 | P | PASS |
Rick Jackson
|
|
|
FIRE ###-#### R/I tested hood extinguishing system - okay 11/30/2000 4:23:16 PM
|
BLD-Other | 11/16/2000 | 11/16/2000 | 11/16/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2000 at 07:28:39. Contact: .
|
BLD-Other | 11/14/2000 | 11/14/2000 | 11/14/2000 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 07:07:05. Contact: .unable to contact 11/14/2000 12:00:52 PM
|
BLD-Other | 11/9/2000 | 11/13/2000 | 11/13/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/09/2000 at 14:23:02. Contact: . ceilling ok need spreader bars an pod requirments for spacing. 11/13/2000 9:04:55 AM
|
BLD-Framing/Rough-in | 10/24/2000 | 10/25/2000 | 10/25/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 14:02:19. Contact: .
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/16/2000 at 14:51:15. Contact: . shafts need back 1 hr at walls/ efis needs drip edge at brick wyanes transition/ support ceilling framing at restaroom kitchen wall/ fire blk walls at cielling line. 10/17/2000 9:50:01 AM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/15/2000 at 14:58:33. Contact: . exxterior sheer nailling ok. 9/18/2000 9:07:59 AM
|
BLD-Conference | 9/13/2000 | 9/13/2000 | 9/13/2000 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 9/13/2000 bedrock excavation installing sewer and storm sewer without permit, covered without inspection. lift correction notice.
|
BLD-Foundation | 8/29/2000 | 8/30/2000 | 8/30/2000 | A | PASS |
Jim Storey
|
|
|
re-bar insp early am Elliot ###-####
|