BLD-Final | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/06/2000 at 13:35:31. Contact: ###-####.
|
FIRE-Final Inspection | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | PASS |
Joe Tawney
|
|
|
JC ###-#### Reinsp OK for certificate of completion 12/6/2000 5:13:51 PM
|
FIRE-Final Inspection | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | FAIL |
Joe Tawney
|
|
|
Reinsp Fail Battery's and outside bell 11/17/2000 7:22:25 PM
|
BLD-Framing/Rough-in | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/07/2000 at 09:06:20. Contact: ###-####.int corridor framing ok to cover, chk firestops, etc at next insp. Tunnel corridor. 8/7/2000 12:15:39 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/25/2000 ok to cover walls at r.rm & corridor pend elec/ plbg. Need insp for tunnel lid
|