BLD-Final | 2/19/2003 | 2/20/2003 | 2/20/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/19/2003 at 2:17:37 PM. Contact: ###-####. finanl ok all special insp and engineering sign offs in archive. 2/20/2003 10:54:37 AM per approved plan from plan review. 2/20/2003 10:56:38 AM
|
BLD-Final | 2/12/2003 | 2/13/2003 | 2/13/2003 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/12/2003 at 16:05:14. Contact: ###-####. stil need gaurd rail height at west end and east end. 2/13/2003 4:05:15 PM
|
FIRE-Final Inspection | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 8:38:50 AM. Contact: ###-####.
|
BLD-Aging Inspection | 2/4/2003 | 2/4/2003 | 2/4/2003 | | PART |
Jim Storey
|
|
|
wip 2/4/2003 7:34:58 AM
|
Code Occupancy Approval | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | DONE |
Scott M.Brown
|
|
|
FINAL SIGNRD OFF. 12/5/2002 4:25:01 PM
|
FIRE-Final Inspection | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/04/2002 at 09:41:20. Contact: ###-####. need clarification on location of hydrants in relation to the cab road; per Dave Miller he will talk with Ken Schneider about this 12/5/2002 5:02:36 PM
|
BLD-Final | 12/2/2002 | 12/3/2002 | 12/3/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 10:24:51. Contact: ###-####.gaurdrail min 42 inches/ engineer of record letter of approval for all rfi's and review of all special insp. reports / soil special insp final afadivad sign off/ lock on power doors at parking garage/ all other required signoffs per permit. 12/3/2002 4:55:49 PM
|
BLD-Foundation | 10/8/2001 | 10/10/2001 | 10/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 17:15:53. Contact: ###-####. placed with special insp. unable to get there. 10/10/2001 3:44:41 PM
|
BLD-Foundation | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 17:15:07. Contact: ###-####. east roadway back fill and retaining wall ft ok special insp on site. rebar on bridge deck in progess. engineer to address dope psi loading being crushed under rebar loading will be replaced. followed through special insp with rfi pending./ wating for ducts for pt profils. 10/9/2001 11:46:08 AM
|
BLD-Foundation | 9/17/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:04:56. Contact: ###-####. placed with special insp. pending report. 9/20/2001 3:09:43 PM
|
BLD-Foundation | 9/17/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:04:04. Contact: ###-####. covered w/s/i 9/19/2001 11:13:36 AM
|
BLD-Foundation | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:03:12. Contact: ###-####. placed w/special insp. pending reports 9/18/2001 10:40:24 AM
|
BLD-Foundation | 8/27/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Jim Storey
|
|
|
harry ###-#### covered by special insp. 8/31/2001 10:39:30 AM
|
BLD-Foundation | 8/27/2001 | 8/30/2001 | 8/30/2001 | A | FAIL |
Jim Storey
|
|
|
harry ###-#### shat rebar lap splice not per drawings rfi required to justify before placement/ spiral bar pitch being addressed for correction colm forms being removed for reinsp. 8/30/2001 9:58:43 AM
|
BLD-Foundation | 8/27/2001 | 8/29/2001 | 8/29/2001 | A | PART |
Jim Storey
|
|
|
harry ###-#### placedwith special insp. pending report. 8/29/2001 10:35:20 AM
|
BLD-Foundation | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PART |
Steven Webb
|
|
|
harry ###-#### covered under special inspectors 8/28/2001 8:49:06 AM
|
BLD-Foundation | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 10:39:51. Contact: ###-####. b piling rebar ok. 8/21/2001 9:37:47 AM
|