BLD-Final | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:51:50. Contact: ###-####.
|
Permanent Occupancy | | 11/22/2000 | 11/22/2000 | | DONE |
|
|
|
|
BLD-Final | 11/17/2000 | 11/20/2000 | 11/20/2000 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/17/2000 at 09:09:15. Contact: ###-####.
|
BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 14:52:54. Contact: ###-####. 42 inch access to exit door/ 36 min ailes.10/27/2000 3:15:19 PM 10/27/2000 3:16:42 PM
|
FIRE-Final Inspection | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/26/2000 at 14:52:23. Contact: ###-####.
|
FIRE-Final Inspection | 10/18/2000 | 10/19/2000 | 10/19/2000 | A | FAIL |
Rick Jackson
|
|
|
FOR 1ST FLOOR FIRE FN --ROD- ###-#### tested alarms - notification and detectors okay; need detector for NAC; replace batteries to 33 amp; exit signs; complete sprinklers; clear stair towers 10/19/2000 12:36:04 PM
|
BLD-Conference | 8/10/2000 | 8/10/2000 | 8/10/2000 | A | PART |
|
|
|
covered plmg w/o same insp came to confirm plmg insp was satisfied with method to reveal same 8/10/2000 9:59:09 AM
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
|
|
|
herb--###-#### fr ok to cover with elec approvals 8/2/2000 10:42:15 AM
|