Permanent Occupancy | | 5/2/2002 | 5/2/2002 | | DONE |
|
|
|
|
BLD-Final | 2/27/2001 | 2/28/2001 | 2/28/2001 | P | NR |
Carl Dependahl
|
|
|
FN OCC-- MARK ###-####, need achd, complete 2/28/2001 5:09:11 PM sprinkler re 2/28/2001 5:09:26 PMlocation 2/28/2001 5:09:49 PM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### 5 int non-brg wall at 2nd fl.2/21/2001 9:34:41 AM... 2/21/2001 10:48:14 AM 2/21/2001 10:49:05 AM
|
BLD-Final | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PART |
Jim Storey
|
|
|
MARK ###-#### FN TEMP OCC life saftey ok for event. single function only. c/n to be 10/27/2000 5:26:06 PM done in max 2 weeks of this date. 10/27/2000 5:26:56 PM
|
FIRE-Final Inspection | 10/26/2000 | 10/27/2000 | 10/27/2000 | A | PASS |
Rick Jackson
|
|
|
MARK ###-####-- FIRE FN
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | NR |
Jim Storey
|
|
|
TEMP OCC-- MARK ###-#### -INSP THE SAFETY RAIL ON MEZZ
|
BLD-Framing/Rough-in | 10/18/2000 | 10/19/2000 | 10/18/2000 | P | CANC |
|
|
|
###-#### WRONG PERMIT # PER MARK BROWN
|
BLD-Framing/Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | A | FAIL |
Carl Dependahl
|
|
|
Mark ###-#### ; need to submit all spec. insp/ eng's reports, complete stairs, etc upper rest. rm ok to rock. multi permits 10/16/2000 1:21:28 PM
|
BLD-Other | 9/13/2000 | 9/13/2000 | 9/13/2000 | | PASS |
|
|
|
Dave Hattrick and I reviewd cable gurards with job superintendent. quarter inch cable, to much flex in cable excessive sag with almost no pressure applied laterally
|