BLD-Final | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### call first; ok per plan modification. 11/6/2001 2:27:53 PM
|
Permanent Occupancy | | 11/6/2001 | 11/6/2001 | | DONE |
|
|
|
|
BLD-Final | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | FAIL |
Carl Dependahl
|
|
|
temp occ-- kim ###-####--per carl put in for pm; c/n: signag 6/8/2001 2:36:58 PM , complete finish, shell & rooftop issues. ok for t/o, card to bldr modification6/8/2001 2:37:46 PM 6/8/2001 3:08:23 PM
|
FIRE-Final Inspection | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/8/2001 1:59:54 PM
|
BLD-Final | 6/1/2001 | 6/5/2001 | 6/5/2001 | A | NR |
Carl Dependahl
|
|
|
Kim ###-####; need complete handrails, fire , etc. recall 6/5/2001 4:16:10 PM
|
FIRE-Final Inspection | 6/1/2001 | 6/5/2001 | 6/5/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### tested hood system okay; occupant load signs and extinguishers 6/5/2001 11:31:20 AM
|
BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/12/2001 3:09:18 PM wall panels ok...keep c/n re lid at bar
|
BLD-Framing/Rough-in | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### scene art wall panels ok; provide non comb backing at celing at bar 3/9/2001 4:49:56 PM
|
BLD-Framing/Rough-in | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/5/2001 3:29:38 PM c/n re fireblocking & support at furred clg and prefab wall panels...submit info on mat'ls per plans. install 3/16 plywood over n.comb. matl...
|
BLD-Framing/Rough-in | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### extend shaft at bsmt, dampers to be installed; seal second "future" shaft. at bottom 2/22/2001 12:28:34 PM
|
BLD-Framing/Rough-in | 1/18/2001 | 1/18/2001 | 1/18/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### SHAFT/ front of hvac shaft by elevator ok to cover; keep c/n re shaft at east side...need detail or dampers... 1/18/2001 2:23:56 PM
|
BLD-Framing/Rough-in | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n for fireblocks at existing shaft, new shaft & lack of damper at penetrations 1/10/2001 3:42:27 PM
|
FIRE-Sprinkler Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | PART |
Rick Jackson
|
|
|
FIRE R/I KIM ###-#### 2nd floor okay 1/4/2001 7:59:42 AM
|
BLD-Framing/Rough-in | 1/2/2001 | 1/2/2001 | 1/2/2001 | P | PART |
Jim Storey
|
|
|
###-#### ok for cover pending reinsp on shafts and fire blk at ceilling line of unusable space at west wall. 1/2/2001 3:22:25 PM
|
FIRE-Conference | 12/22/2000 | 12/26/2000 | 12/26/2000 | A | PART |
Rick Jackson
|
|
|
KIM 941- 3664 FOR CONF// sprinkler heads required in shafts 12/26/2000 11:31:57 AM
|
BLD-Framing/Rough-in | 12/22/2000 | 12/22/2000 | 12/22/2000 | P | PART |
Carl Dependahl
|
|
|
R/I KIM -- ###-#### MEC CONNECTIONS IN BALLROOM CEILING JOIST ok to cover that area. need fire sprinkler analysis for existing shafts w/ exposed combustibles 12/22/2000 1:44:21 PM
|
BLD-Framing/Rough-in | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | FAIL |
Carl Dependahl
|
|
|
R/I- KIM ###-#### ; need sprinkler r/i at "existing" shafts back of kitchen wall, (hvac from starbucks?) firestop floor/ceiling lines
12/21/2000 11:51:10 AM
|
BLD-Conference | 11/20/2000 | 11/21/2000 | 11/21/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####; need elec & other for "final" recall...address on Fulton per bldr. 11/21/2000 11:04:07 AM
|
BLD-Conference | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | PART |
Carl Dependahl
|
|
|
KIM ###-#### FOR CONF
|