BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Jim Storey
|
|
|
###-#### DUTCH final ok. 11/7/2001 11:09:11 AM
|
Permanent Occupancy | | 11/7/2001 | 11/7/2001 | | DONE |
|
|
|
|
BLD-Final | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PART |
Jim Storey
|
|
|
###-#### handrail clearance at pool/ perm rated doors first and third floor stair west end of bld/signage occ.load./othere insp. to sign perm. 6/14/2001 5:20:22 PM
|
FIRE-Final Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/12/2001 9:48:54 AM
|
FIRE-Final Inspection | 6/6/2001 | 6/8/2001 | 6/8/2001 | P | FAIL |
Rick Jackson
|
|
|
fire fn-- rob ###-#### c/n issued 6/8/2001 4:44:30 PM
|
BLD-Framing/Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Steven Webb
|
|
|
grid ceiling insp -- dutch ###-####
|
BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Steven Webb
|
|
|
###-#### ceiling grid Fire assemblies and grid ok for cover 1, 2, 3, floor, pool ok. NOT conference, corridor 133 and mechanical area, and lobby not been inspected. 5/17/2001 2:25:03 PM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Steven Webb
|
|
|
grid ceiling dutch ###-#### ok to drop tiles 3rd floor except 1 location, 2nd floor 3 location, bottom floor corridor except 1 location. No additional tiles until fire caulking completed in pool area, conference room. No tiles in corridor 131 totally. 5/16/2001 3:13:58 PM
|
BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 | P | PART |
Steven Webb
|
|
|
###-#### Susp. ceiling--ok to drop difficult tiles and light in only except pool area--ok. 5/15/2001 3:35:21 PM
|
BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/14/2001 11:13:34 AM Discussed with David Ruby in regards to one-hr requirements on the windows outside the pool area--After meeting with Mike Phillips, Bob Archabald and myself was determined that the on hr is needed according to 97 UBC 1005.3.3.2 Exit Enclosures 5/14/2001 11:16:52 AM
|
BLD-Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 5/14/2001 2:38:33 PM Issued a correction notice informing Petra that the windows and frame will need to comply with the 1-Hr fire rating according to 1005.3.3.2 5/14/2001 2:40:09 PM
|
BLD-Conference | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/17/2001 3:35:40 PM Requested contractor have all subs supply "cut sheets" on product and installlation specs on fire assembly products used prior to final inspection. 4/17/2001 3:36:57 PM
|
BLD-Conference | 4/13/2001 | 4/13/2001 | 4/13/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/13/2001 1:38:47 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | CANC |
Jim Storey
|
|
|
PEtra const ###-#### trans to s web via his requist. 4/3/2001 7:56:34 AM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 4/3/2001 8:21:51 AM Pool Area -- ok to cover. 4/3/2001 8:36:01 AM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | FAIL |
Steven Webb
|
|
|
dutch ###-#### C/N posted in job trailer. 4/2/2001 2:34:15 PM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/9/2001 | 3/9/2001 | P | PART |
Steven Webb
|
|
|
###-#### ok to cover 2nd and 3rd floors, lounge and managers quarters excluding fireplace. 3/9/2001 1:44:29 PM
|
BLD-Framing/Rough-in | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | CANC |
Jim Storey
|
|
|
###-#### steve web called and is doing the insp will add. 3/8/2001 9:31:50 AM
|
BLD-Framing/Rough-in | 3/8/2001 | 3/8/2001 | 3/8/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 3/8/2001 9:42:53 AM c/n issued--need mechanical and fire r. i. prior to insulation on 3rd floor and 1st floor, north side including pool, lounge and managers quarters. 3/8/2001 12:13:26 PM
|
BLD-Conference | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 2/28/2001 3:22:44 PM Met with petra, Dave lightfoot, Dixie in regards to covering portion of lodge without mechanical, no duck for heat or air(window units) exhaust fan chases were to be left open pending mechanical inspections). 2/28/2001 3:24:16 PM
|
FIRE-Sprinkler Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/28/2001 10:22:47 AM okay to cover 3rd floor and stairs
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Steven Webb
|
|
|
###-####: Ok to cover 2nd floor room and corridor. 2/21/2001 10:09:55 AM
|
BLD-Framing/Rough-in | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/12/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Steven Webb
|
|
|
###-####--Passed for 17 guest units on the 1st floor on the south side--ok to cover. 2/13/2001 4:18:36 PM
|
FIRE-Sprinkler Rough-in | 2/13/2001 | 2/13/2001 | 2/13/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/13/2001 10:30:52 AM okay to cover first and second floor suites only 2/13/2001 10:31:27 AM
|
FIRE-Sprinkler Rough-in | 2/7/2001 | 2/7/2001 | 2/7/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/7/2001 10:18:25 AM attempted r/i inspection for cover of second and first floor; plans not approved yet. they were given approval to proceed with sprinkler work by Bill Alexander but not to call in for inspections until plans are approved 2/7/2001 10:20:05 AM
|
BLD-Conference | 1/31/2001 | 1/31/2001 | 1/31/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/31/2001 11:19:58 AM ; Received submittal for a proposed portco to lodge, refered to supervisor 325, instructed contractor on supervisor recommendation to resubmit to plan review. 1/31/2001 11:43:27 AM
|
BLD-Framing/Rough-in | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/22/2001 12:54:39 Pm conference not framing, reviewed bathroom exhaust 1-hr chases, and received a eng. repair for truss number arix which will be cut at laundry chute area. 1/22/2001 2:50:54 PM
|
BLD-Conference | 1/11/2001 | 1/11/2001 | 1/11/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 1/11/2001 8:28:36 AM /Reviewed detail of proposed bathroom fan exhaust 1-Hr. chase detail. 1/11/2001 11:50:52 AM
|
BLD-Conference | 1/8/2001 | 1/8/2001 | 1/8/2001 | A | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 1/8/2001 12:00:58 PM Discussed plumbing vent chases with super, arictect, mechanical contractor.
|
BLD-Concrete | 12/27/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 12/27/2000 11:35:46 AM pool rebar ok
|
BLD-Conference | 12/27/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 12/27/2000 11:36:50 AM regarding penetration of 1 hr wall with plumbing.
|
BLD-Foundation | 11/22/2000 | 11/27/2000 | 11/27/2000 | A | PART |
Jim Storey
|
|
|
special inspector on site Dutch ###-#### placed wiyh special insp. pending report. 11/27/2000 10:00:05 AM
|
BLD-Footing | 11/20/2000 | 11/21/2000 | 11/21/2000 | P | PART |
Jim Storey
|
|
|
FT INSP-- DUTCH- CELL ###-#### -INTERIOR FT ft at f-14 spoke with brian smith eng. ok to oversize w/1#4 bar each way to acomadate pipe entrution. 11/21/2000 11:34:06 AM
|
BLD-Foundation | 11/15/2000 | 11/16/2000 | 11/16/2000 | A | PART |
Carl Dependahl
|
|
|
SPECIAL INSPECTOR CALLED Dutch ###-####
|
BLD-Foundation | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | NR |
Carl Dependahl
|
|
|
###-####,pend report from spec. insp. 11/14/2000 12:02:50 PM
|
BLD-Footing | 10/31/2000 | 11/1/2000 | 11/1/2000 | P | PASS |
Jim Storey
|
|
|
FT INSP- DUTCH CELL ###-#### placed with special insp. pending report. 11/1/2000 3:14:04 PM
|
BLD-Conference | 10/30/2000 | 10/31/2000 | 10/31/2000 | A | PASS |
Jim Storey
|
|
|
Dutch Wilkenson ###-#### special insp. on project. fax code section of 711.3 to jerry frank. 10/31/2000 10:40:11 AM
|