BLD-Final | 9/6/2002 | 9/6/2002 | 9/6/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/06/2002 at 09:25:01. Contact: ###-####....ok shell only , need bld01-03253 (t/i?) finalled as well. 9/6/2002 4:36:39 PM
|
FIRE-Final Inspection | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PASS |
Troy Cobbley
|
|
|
fire alarm and fire life/safety finaled 9/6/2002 9:17:37 AM
|
FIRE-Final Inspection | 8/22/2002 | 8/23/2002 | 8/23/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/22/2002 at 13:44:11. Contact: ###-####. need address; move knox box to Americana side of building; zones defined for fire monitoring company; map at FACP and in knox box 8/23/2002 3:10:58 PM
|
BLD-Conference | 7/11/2002 | 7/12/2002 | 7/12/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/11/2002 at 14:27:11. Contact: ###-####.w/j.c...ok to infill window within overhand distance at front wall, near existing 4hr wall (Last window of 3...) 7/12/2002 10:48:11 AM
|
FIRE-Sprinkler Rough-in | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 12:27:31. Contact: ###-####. need sprinkler plans and alarm plans; antifreeze loop installed in canopies without plans; system over 100 heads and not monitored; combustibles above ceiling; ceiling not installed in all areas with pendant heads at ceiling level 10/1/2001 9:13:35 AM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PART |
Carl Dependahl
|
|
|
east canopy's ###-####, frame appears ok; need clarify thru-bolts for ledgers at east side & length of c-channels for lintels (20.7 ft. req'd) 8/10/2001 11:22:43 AM
|
BLD-Framing/Rough-in | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Tom Arcoraci
|
|
|
JC ###-#### ok to cover north west canopy 7/22/2001 10:53:10 PM
|
BLD-Concrete | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Carl Dependahl
|
|
|
masonary grouting ###-####; columns at south 7/10/2001 5:29:34 PM
|
BLD-Concrete | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Jim Storey
|
|
|
concrete--jc ###-#### colm. rebar and clean outs ok. 7/6/2001 1:24:03 PM
|
BLD-Foundation | 6/21/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### masonry cols ok to continue 6/22/2001 11:36:08 AM
|
BLD-Footing | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PART |
Carl Dependahl
|
|
|
ft jc----- ###-#### - at this address 713 s 14th ???...masonry cols at west....ftgs ok 6/21/2001 11:30:58 AM
|
BLD-Framing/Rough-in | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PART |
Carl Dependahl
|
|
|
masonry cells ###-####; infills at north side; struct. steel lintels installed over infill...need complete plans, looks ok. 6/1/2001 2:36:43 PM
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/8/2001 4:31:22 PM w/westfall re modification/deletion of car park area
|
BLD-Conference | 4/30/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 15:10:47. Contact: ###-####. Contractor / developer request modification...demo parking structure rather than reuse; submit written request w/ plan sheets for review. 5/1/2001 4:04:25 PM
|
BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/30/2001 4:04:20 PM w/ Cornell Larson...may need add'l plan/ submittal for changes...Meet onsite??
|