BLD-Final | 5/5/2003 | 5/6/2003 | 5/6/2003 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/5/2003 at 5:20:11 PM. Contact: ###-####. C/N Scope of 5/6/2003 5:05:48 PM
|
FIRE-Final Inspection | 5/2/2003 | 5/5/2003 | 5/5/2003 | A | PASS |
Troy Cobbley
|
|
|
hank; Phone #: ###-#### Fire life safety finaled 5/5/2003 10:27:04 AM
|
BLD-Aging Inspection | 4/4/2003 | 4/4/2003 | 4/4/2003 | | PART |
Jim Sly
|
|
|
Called for Electr insp....and called for fire insp for friday April 11 4/8/2003 4:13:42 PM
|
FIRE-Final Inspection | 10/21/2002 | 10/21/2002 | 10/21/2002 | A | FAIL |
Troy Cobbley
|
|
|
provide city approved fire sprinkler drawings, provide exit signs as shown of the plans, provide approved door hardware on doors in the remodeled areas, repair and/or provide emergency lights in corridor and portable "EFG"
|
BLD-Conference | 9/3/2002 | 9/4/2002 | 9/4/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/03/2002 at 09:55:01. Contact: ###-####. hank will start calling in finals for other trades 9/4/2002 10:28:34 AM
|
BLD-Conference | 2/26/2002 | 2/27/2002 | 2/27/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 10:02:56. Contact: ###-####. Called and talked with them, they wanted to know about changing door locations, I recommended the consult with the architect first. (Note see inspection history). 2/27/2002 4:20:35 PM
|
BLD-Conference | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/07/2002 at 11:55:39. Contact: ###-####. will resume work this spring 2/8/2002 11:18:16 AM
|
BLD-Conference | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 16:19:46. Contact: ###-####. they are finishing up the srinkler and alarm system ph 2 they will start ph 3 in the sring we will keep permit open so they can finish work next summer 9/7/2001 9:21:20 AM
|
FIRE-Final Inspection | 8/23/2001 | 8/27/2001 | 8/27/2001 | A | NR |
Joe Tawney
|
|
|
fire fn delilah- ###-####
|
BLD-Conference | 4/12/2001 | 4/12/2001 | 4/12/2001 | P | PASS |
Dave Hannah
|
|
|
Per Dave H.
|
Extend Permit 180 days | | 4/12/2001 | 4/12/2001 | | DONE |
|
|
|
per Dave Hannah
|
BLD-Framing/Rough-in | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | PART |
Jim Sly
|
|
|
Murray ###-#### Partial...OK to cover beams and framing in classrm and library Pend Elect, Mech and Sprinkler R/I approval. 9/8/2000 10:30:06 AM
|
FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PART |
Joe Tawney
|
|
|
Russ ###-#### Spklr rough in One head too close to wall in closet 9/8/2000 4:33:08 PM
|