Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-02143
StatusFinaled
Name ST LUKES
Site Address 100 E IDAHO ST
Project NameST LUKES-MSTI
Customer NumberSTL2407
ePlanReviewNo
Description
(ST LUKES MSTI CHILDRENS COURTYARD) To construct a new play / relaxation area outside the northeast corner of the MSTI facility, over the existing concrete basement roof. Work includes non-combustible court yard containment wall, decorative planting areas; specially installed / placed columns to support an engineered sunscreen trellis system (special inspection per plans for welding & epoxy connections); specialty drainage system / waterproofing membrane; and code complying exit to serve the courtyard area. All per approved plans, notes and attachments. THIS PROJECT IS EXTERIOR TO THE BUILDING; OF NON-COMBUSTIBLE STRUCTURAL MATERIALS ASSEMBLED IN SUCH A WAY AS TO PREVENT TRAPPING OF HEAT OR SMOKE. THIS AREA IS NOT SPRINKLED. (DR97-214);(P.C.#593-00)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/19/20016/19/20016/19/2001PPASS
DetailsCarl Dependahl
st lukes; ok for c/o 6/19/2001 2:29:26 PM
BLD-Concrete6/1/20016/4/20016/4/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/01/2001 at 12:08:39. Contact: ###-####...still need p&z for final 6/4/2001 3:28:21 PM
BLD-Final5/31/20016/1/20016/1/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/31/2001 at 15:16:56. Contact: ###-####. need p&z and special insp. final letter. 6/1/2001 11:04:27 AM
BLD-Footing9/12/20009/13/20009/13/2000APART
Details
wendall ###-#### poured w/o city approval will accept approval from the sp insp 9/14/2000 9:24:21 AM