BLD-Aging Inspection | 2/3/2003 | 2/3/2003 | 2/3/2003 | | DONE |
Carl Dependahl
|
|
|
|
BLD-Final | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | NR |
Carl Dependahl
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 12/4/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...permit is superceded by BLD01-02790, final or "void" ok. 12/4/2002 3:01:30 PM
|
FIRE-Final Inspection | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PASS |
Rick Jackson
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Final | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | NR |
Carl Dependahl
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, need fire, etc. 12/3/2002 10:23:57 AM
|
BLD-Conference | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | CANC |
Carl Dependahl
|
|
|
Dave ###-####
|
BLD-Conference | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | PASS |
Carl Dependahl
|
|
|
Dave ###-####...struct ok, need fire consultation re storage area exis 11/27/2002 4:16:07 PM
|
BLD-Final | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | FAIL |
Carl Dependahl
|
|
|
DAVE THIS IS FOR OCCUPANCY; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Final | 11/22/2002 | 11/25/2002 | 11/25/2002 | P | NR |
Carl Dependahl
|
|
|
c/n, need consult fire re exiting from "storage" area...prior to final sign off...other struct items ok, rec'd eng's & spec insp reports. 11/26/2002 1:39:02 PM
|
BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PASS |
Carl Dependahl
|
|
|
original shell permit, superceded by BLD01-02790...ok to final this as spec insp & eng's final reports are ok. 11/22/02 3:11:49 PM
|
BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Conference | 11/22/2002 | 11/22/2002 | 11/22/2002 | P | PASS |
Carl Dependahl
|
|
|
|
FIRE-Conference | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | PART |
Rick Jackson
|
|
|
harold ###-#### for conf met with Harold of Mountain Power; since an elevator is now in the building, an elevator recall control unit will be required per NFPA 72 para 3-9.3.1; he was going to get Dave Maxwell to submit plans 4/15/2002 3:27:10 PM
|
BLD-Conference | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/7/2002 3:12:15 PM w/ Jason B & new contractor at site...left c/n list to complete items.
|
BLD-Other | 3/5/2002 | 3/6/2002 | 3/6/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 13:42:13. Contact: ###-####.... 3/6/2002 2:59:31 PM c/n,draftstops,spec insp reports, etc. ok to issue new permits 3/6/2002 3:16:25 PM
|
BLD-Conference | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/27/2002 6:05:09 PM w/ Jason...need final prior to new permits
|
BLD-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 | | NR |
Carl Dependahl
|
|
|
new plan mod per Jason...may be add'l permit 12/18/2001 3:53:25 PM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/15/2001 11:09:54 AM w/ Jason B. re status of permit...keep c/n. Need review of plans for add'l work.
|
BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/10/2001 4:54:02 PM c/n, submit plans for ext work (in progress) "stop work"
|
BLD-Conference | 10/8/2001 | 10/8/2001 | 10/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/8/2001 10:44:10 AM w/ Jason B re plan modification ( again!)...new arch on job...they want to void this permit but must be finalled.
|
BLD-Aging Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 | | PART |
Carl Dependahl
|
|
|
Wip...plan modified, ok. 9/26/2001 8:29:26 AM
|
BLD-Framing/Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 09:03:05. Contact: ###-####. east ceilling 2nd floor ok for cover only. 7/27/2001 2:57:49 PM
|
BLD-Conference | 7/12/2001 | 7/12/2001 | 7/12/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/12/2001 12:00:46 PM need other finals & arch's letter requesting deletion of work not to be completed for "shell";
|
BLD-Framing/Rough-in | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PART |
Carl Dependahl
|
|
|
Rick ###-####; shaft & duct enclosure at west stair ok to continue. 2nd fl framing at east portion ok... 6/7/2001 3:05:25 PM
|
BLD-Framing/Rough-in | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PART |
Carl Dependahl
|
|
|
###-####; ok to cover floor at east...seal floor drains 1st. ok to frame "shafts" for hvac 6/4/2001 3:19:34 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 09:53:16. Contact: ###-####....floor ok at pool 1st fl area 5/21/2001 5:15:08 PM
|
BLD-Conference | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/24/2001 4:04:55 PM w/ bldr onsite, need hvac drawings, etc.
|
BLD-Footing | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PART |
Carl Dependahl
|
|
|
swimming pool area ###-####; new floor ftgs 4/2/2001 5:22:18 PM
|
BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/20/2001 at 08:18:33. Contact: ###-####...ok to cover west end corridor 3/20/2001 6:00:36 PM
|
BLD-Framing/Rough-in | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 07:28:02. Contact: ###-####...ok to cover floor at east side pending hvac ok; ok to insulate roof at bowstring truss area, recommend perm rated paint this condition 3/1/2001 4:35:17 PM
|
BLD-Framing/Rough-in | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 09:38:48. Contact: ###-####. c/n : fireblocks,draftstops, hangersn at existing joists. 2/22/2001 12:30:49 PM
|
BLD-Conference | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/13/2001 at 09:15:51. Contact: ###-####. has plan mod in for review 2/13/2001 6:09:54 PM
|
BLD-Framing/Rough-in | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/17/2001 at 10:52:13. Contact: ###-####. ok to cover int corr. walls/lid; need eng's detail for roof & spans. keep c/n 1/17/2001 1:48:08 PM
|
BLD-Foundation | 1/15/2001 | 1/16/2001 | 1/16/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 10:12:27. Contact: ###-####. stem wall of elev pit 1/16/2001 10:24:20 AM
|
BLD-Conference | 1/4/2001 | 1/4/2001 | 1/4/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/4/2001 11:42:52 AM c/n issued; need eng's upgrades for existing deficiency at overspan roofframing,( brg walls failing) and modified attachment of new 2nd fl. due to existing condition ( at walls rg floor at perimeter)
|
BLD-Footing | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 09:28:57. Contact: ###-####. elev ftg/slab ok 1/4/2001 11:40:17 AM
|
BLD-Footing | 12/20/2000 | 12/21/2000 | 12/21/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/20/2000 at 13:45:23. Contact: ###-####. int ftgs for new 2nd fl, mti ok'd dowels, ok to pour 12/21/2000 3:24:13 PM
|