Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-02250
StatusFinaled
Name 5B INVESTMENTS
Site Address 1105 N LIBERTY ST
Project NameRENAISSANCE @ LIBERTY
Customer Number 
ePlanReviewNo
Description
(RENAISSANCE @ LIBERTY LAKES - CLUB HOUSE) This building is not fire sprinklered. To construct a 5,765 square foot assembly building to serve a 288 unit apartment complex. This building has three (3) restrooms accessible to the disabled, an exercise room, game room, video room, club room, mail room, work room, kitchen, offices, etc. Work is to include concrete footings, foundations, and slabs; wood stud bearing walls; engineered wood truss roof; brick veneer wainscot; and vinyl siding all per approved drawings, engineering, and plan review conditions on file. The capacity of the club room (90) shall be posted. THE SWIMMING POOL IS NOT COVERED UNDER THIS PERMIT. SEPARATE PERMIT APPLICATION AND APPROVAL IS REQUIRED FOR THE SWIMMING POOL. DR 99-00258 CUP 99-00127 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/13/20026/13/20026/13/2002 DONE
Final - approved/perm. occ.
Permanent Occupancy 6/13/20026/13/2002 DONE
Details
BLD-Aging Inspection12/31/200112/31/200112/31/2001 PART
DetailsTom Arcoraci
temp 1/3/2002 9:10:22 AM
BLD-Aging Inspection10/31/200110/31/200110/31/2001 PART
DetailsTom Arcoraci
temp occ 10/31/2001 8:45:13 AM
BLD-Final8/30/20018/31/20018/31/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/30/2001 at 17:32:21. Contact: ###-####. ok for temp 9/3/2001 8:06:45 PM
BLD-Final8/30/20018/31/20018/31/2001APART
DetailsTom Arcoraci
Added by Inspector: 408 On 8/30/2001 11:05:16 PM ok for temp occ
FIRE-Final Inspection8/30/20018/31/20018/31/2001APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/30/2001 at 15:02:32. Contact: ###-####. door hardware at excercise room 8/31/2001 10:48:35 AM
BLD-Final8/29/20018/30/20018/30/2001PNR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/29/2001 at 16:16:05. Contact: ###-####.
FIRE-Final Inspection8/29/20018/30/20018/30/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 8/30/2001 1:56:42 PM
BLD-Conference8/23/20018/24/20018/24/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/23/2001 at 16:26:47. Contact: ###-####.
BLD-Energy code compliance7/11/20017/12/20017/12/2001APASS
DetailsTom Arcoraci
JOHN ###-#### ENERGY CODE
BLD-Framing/Rough-in7/11/20017/11/20017/11/2001PPART
DetailsDave Hannah
###-#### 7/11/2001 2:13:26 PM all c/n items but one have been finished need engineer to clearify his detail for support under 2ply t64 and t63 trusses 7/11/2001 3:00:17 PM
BLD-Framing/Rough-in7/10/20017/10/20017/10/2001PNR
DetailsTom Arcoraci
jeff ###-#### fr insp
BLD-Framing/Rough-in7/6/20017/9/20017/9/2001AFAIL
DetailsTom Arcoraci
###-#### fr insp cn issued 7/9/2001 12:32:09 AM
BLD-Framing/Rough-in5/31/20015/31/20015/31/2001PPART
DetailsTom Arcoraci
partial Jeff ###-#### WIP SHEAR PARTIAL 5/31/2001 4:50:46 PM
BLD-Footing5/10/20015/11/20015/11/2001PPASS
DetailsTom Arcoraci
jeff-- ###-#### interior ft
BLD-Concrete5/10/20015/10/20015/10/2001PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 5/10/2001 2:55:54 PM wip mti on site
BLD-Foundation4/23/20014/23/20014/23/2001PPASS
DetailsTom Arcoraci
late pm Larry ###-####
BLD-Conference4/13/20014/18/20014/18/2001APASS
DetailsTom Arcoraci
CONFERENCE/ MEET AT THE JOB TRAILER CALL FIRST ###-#### CHUCK conf on framing 4/18/2001 11:50:29 AM
BLD-Footing4/16/20014/17/20014/17/2001APASS
DetailsTom Arcoraci
Larry ###-####