BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
Final, ok for perm. occ. cert.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Aging Inspection | 1/28/2002 | 1/28/2002 | 1/28/2002 | | PART |
Tom Arcoraci
|
|
|
wip 1/28/2002 8:41:23 AM
|
FIRE-Final Inspection | 11/26/2001 | 11/26/2001 | 11/26/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/26/2001 11:33:43 AM Correction notice completed. Fire life/safety finaled. Ok for perm occ
|
BLD-Aging Inspection | 10/30/2001 | 10/30/2001 | 10/30/2001 | | PART |
Tom Arcoraci
|
|
|
wip 10/30/2001 8:54:33 AM
|
BLD-Final | 8/29/2001 | 8/30/2001 | 8/30/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 16:15:14. Contact: ###-####. ok for temp 8/30/2001 5:50:12 AM
|
FIRE-Final Inspection | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Joe Tawney
|
|
|
Final OK for temporary Occupancy. C/N issued 8/30/2001 2:04:40 PM
|
BLD-Energy code compliance | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
jeff ###-#### insulation
|
BLD-Framing/Rough-in | 7/6/2001 | 7/9/2001 | 7/9/2001 | A | PASS |
Tom Arcoraci
|
|
|
dry wall nailing--jeff- ###-####
|
BLD-Framing/Rough-in | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Tom Arcoraci
|
|
|
###-####
|
BLD-Energy code compliance | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### Jeff
|
BLD-Framing/Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to inul west and center 6/27/2001 3:27:02 AM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Tom Arcoraci
|
|
|
fire calking jeff ###-#### ok to rock bath tub walls 6/19/2001 4:52:23 AM
|
BLD-Conference | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PASS |
Tom Arcoraci
|
|
|
jEFF bURNS ###-####
|
BLD-Conference | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
jeff- ###-#### for conf ok to use exp in 710.3 ubc for third floor ceiling 6/8/2001 11:07:54 AM
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/7/2001 | P | PASS |
Tom Arcoraci
|
|
|
Jeff ###-#### fire place and corr material 6/7/2001 9:59:33 AM
|
BLD-Conference | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Tom Arcoraci
|
|
|
John ###-#### PLUMBING FIRE STOP WILL BE METACAULK 1000 5/31/2001 11:44:48 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Tom Arcoraci
|
|
|
partial Jeff ###-#### WIP SHEAR PARTIAL 5/31/2001 4:51:03 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### WIP 5/11/2001 2:42:31 PM
|
BLD-Conference | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Tom Arcoraci
|
|
|
Jeff ###-#### conf on stairs and exit width 5/7/2001 5:31:01 PM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PART |
Tom Arcoraci
|
|
|
shear wall \\###-#### ok to rock ext first floor 5/7/2001 5:29:58 PM
|
BLD-Conference | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### 4x12 stringers for stairs per plan 4/30/2001 11:31:39 AM
|
BLD-Footing | 4/24/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Dave Hannah
|
|
|
late pm ###-####
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### JEFF conf on eng 4/23/2001 3:35:43 PM
|
BLD-Conference | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### Jeff Burns ec conf r19walls r38 ceiling u-50 windows ok per 325 4/4/2001 3:34:21 PM
|
BLD-Conference | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | NH |
Russ Owen
|
|
|
Jeff Burns ###-#### no one at the site called left mesg. 4/3/2001 10:34:41 AM
|
BLD-Foundation | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Footing | 3/23/2001 | 3/26/2001 | 3/26/2001 | P | PASS |
Tom Arcoraci
|
|
|
pumping at 3:OO LARRY ###-####
|