BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
Final - approved/perm. occ.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 13:49:47. Contact: ###-####. OK for Temp Occ. 2/21/2002 2:14:34 PM
|
FIRE-Final Inspection | 2/15/2002 | 2/15/2002 | 2/15/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 2/15/2002 2:04:11 PM Fire life/safety finaled. Fire sprinkler and fire alarm finaled
|
BLD-Wall cover | 12/21/2001 | 12/24/2001 | 12/24/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 16:29:51. Contact: ###-####. ok to cover south 4 of 12 12/24/2001 9:35:49 AM
|
BLD-Wall cover | 12/21/2001 | 12/24/2001 | 12/24/2001 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 407 On 12/21/2001 5:21:24 PM
|
BLD-Wall cover | 12/21/2001 | 12/21/2001 | 12/21/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 08:37:09. Contact: ###-####.unable to do set up for monday am. 12/21/2001 5:23:18 PM
|
BLD-Wall cover | 12/18/2001 | 12/19/2001 | 12/19/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 15:54:25. Contact: 94197748. 2nd and 3rd floors ok to cover 12/19/2001 9:55:35 AM
|
BLD-Wall cover | 12/12/2001 | 12/13/2001 | 12/13/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 09:13:03. Contact: ###-####.ok north side. 12/13/2001 11:52:16 AM
|
BLD-Wall cover | 12/11/2001 | 12/12/2001 | 12/12/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 13:38:03. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/12/2001 at 09:10:38.
|
BLD-Wall cover | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/06/2001 at 13:38:25. Contact: ###-####. ok to cover center sec of bld 11 12/7/2001 11:05:01 AM
|
BLD-Wall cover | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 17:23:02. Contact: ###-####. ok to rock 12/6/2001 12:27:13 PM
|
BLD-Wall cover | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 12/6/2001 10:29:57 AM
|
BLD-Wall cover | 12/4/2001 | 12/5/2001 | 12/5/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 09:14:37. Contact: ###-####. ok for drops need to re inspect two hr walls at 3rd floor 12/5/2001 1:58:32 PM
|
BLD-Wall cover | 12/3/2001 | 12/4/2001 | 12/4/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 09:50:42. Contact: ###-####. wip 12/4/2001 8:46:06 AM
|
BLD-Framing/Rough-in | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PART |
Tom Arcoraci
|
|
|
JEFF ###-#### WALL COVER wip 11/30/2001 11:44:57 AM
|
BLD-Framing/Rough-in | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 11/30/2001 10:35:57 AM ok inul north 4 units 11/30/2001 2:49:17 PM
|
BLD-Wall cover | 11/26/2001 | 11/27/2001 | 11/27/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/26/2001 at 12:07:01. Contact: ###-####. ok to set tubs 11/27/2001 11:04:10 AM
|
BLD-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 | | PART |
Tom Arcoraci
|
|
|
wip 10/29/2001 1:32:50 PM
|
BLD-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 | | PART |
Tom Arcoraci
|
|
|
wip 8/26/2001 9:18:29 PM
|
BLD-Footing | 6/26/2001 | 6/27/2001 | 6/27/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PASS |
Tom Arcoraci
|
|
|
Larry ###-#### they are pouring at one o clock
|
BLD-Footing | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PART |
Tom Arcoraci
|
|
|
Larry ###-####
|