BLD-Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
Final - approved/perm. occ.
|
Permanent Occupancy | | 6/13/2002 | 6/13/2002 | | DONE |
|
|
|
|
BLD-Final | 3/26/2002 | 3/27/2002 | 3/27/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 08:28:25. Contact: ###-####. ok for temp occ 3/27/2002 3:02:52 PM
|
FIRE-Conference | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety, fire alarm and fire sprinkler finaled 3/27/2002 9:55:23 AM
|
FIRE-Final Inspection | 3/15/2002 | 3/18/2002 | 3/18/2002 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Fire alarm needs temporal pattern verified. 3/18/2002 3:04:04 PM
|
BLD-Wall cover | 1/23/2002 | 1/24/2002 | 1/24/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 11:10:32. Contact: ###-####. ok to cover 1/24/2002 4:32:56 PM
|
BLD-Wall cover | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 16:10:39. Contact: ###-####.
|
BLD-Wall cover | 1/17/2002 | 1/18/2002 | 1/18/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 15:53:38. Contact: ###-####. drops ok 2 and 3 floors 1/18/2002 4:33:46 PM
|
BLD-Wall cover | 1/11/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 09:29:53. Contact: ###-####. drop ceilings for cover east 4 units of bld 14 1/15/2002 10:42:13 AM
|
BLD-Wall cover | 1/8/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 1/8/2002 4:59:12 PM ok for drops and insul needs truss clips at east side 1/9/2002 12:12:13 PM
|
BLD-Wall cover | 1/7/2002 | 1/9/2002 | 1/9/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/07/2002 at 14:02:37. Contact: ###-####. wip 1/9/2002 8:06:11 AM
|
BLD-Wall cover | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/08/2002 at 07:42:25. Contact: ###-####.
|
BLD-Wall cover | 1/4/2002 | 1/7/2002 | 1/7/2002 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 10:37:14. Contact: ###-####.
|
BLD-Wall cover | 1/3/2002 | 1/4/2002 | 1/4/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 16:57:42. Contact: ###-####. center 12 ok for drops and insul 1/4/2002 10:19:41 AM
|
BLD-Wall cover | 1/3/2002 | 1/4/2002 | 1/3/2002 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 16:48:34. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/03/2002 at 16:58:49.
|
BLD-Wall cover | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 08:08:14. Contact: ###-####. 4 west units in 14 ok 1/3/2002 4:14:26 PM
|
BLD-Wall cover | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/27/2001 at 08:03:55. Contact: ###-####. ok to set tubs 12/27/2001 4:59:26 PM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/24/2001 | 9/24/2001 | 9/24/2001 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Footing | 7/24/2001 | 7/25/2001 | 7/25/2001 | P | PASS |
Tom Arcoraci
|
|
|
interior footings jeff ###-####
|
BLD-Foundation | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | PASS |
Tom Arcoraci
|
|
|
late am please larry ###-####
|
BLD-Footing | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | PASS |
Dave Hannah
|
|
|
late am pump set up at 12:00 Larry ###-####
|