BLD-Final | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PASS |
Carl Dependahl
|
|
|
Final - Joe, ###-####, c/n ok 6/11/2001 4:35:48 PM
|
Permanent Occupancy | | 6/11/2001 | 6/11/2001 | | DONE |
|
|
|
|
BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/8/2001 8:26:24 AM w/ Jim re c/n
|
BLD-Conference | 5/7/2001 | 5/7/2001 | 5/7/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/7/2001 2:01:47 PM w/ owner, need p&z to approve ext or landscape changes
|
BLD-Conference | 4/16/2001 | 4/16/2001 | 4/16/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/16/2001 11:18:20 AM w/ owner re final req's
|
BLD-Final | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
fn-- vicky ###-#### , c/n, door hdwe, other finals, complete landscape, etc...ok for t/o 4/16/2001 6:11:35 PM
|
FIRE-Final Inspection | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Cancel should be 409 4/17/2001 8:34:13 AM
|
FIRE-Final Inspection | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 4/16/2001 2:35:57 PM
|
BLD-Final | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/2/2001 4:52:08 PM ok to cover....may req scuttle & ladder to roof units, location to be figured.
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/1/2001 1:48:44 PM w/ owner: recall for shaft,& col. reinsp
|
BLD-Energy code compliance | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### insul installed 2/27/2001 12:10:44 PM
|
BLD-Framing/Rough-in | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; verbal c/n to add2 studs at ea. int brg point for girder trusses; begin/complete 1hr shaft, obtain complete hvac r/i; ok to rock ext walls only 2/27/2001 12:10:22 PM
|
BLD-Energy code compliance | 2/26/2001 | 2/26/2001 | 2/27/2001 | P | NR |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 2/26/2001 | 2/26/2001 | 2/27/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### conf only 2/27/2001 12:11:04 PM
|
BLD-Energy code compliance | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | NR |
Carl Dependahl
|
|
|
VICKY ###-#### ENERGY CODE INSP
|
BLD-Framing/Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 | A | PART |
Carl Dependahl
|
|
|
FR INSP VICKY ###-#### ; ok to insul ext walls only; need complete shaft, etc. 2/26/2001 10:47:14 AM
|
BLD-Framing/Rough-in | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | NR |
Tom Arcoraci
|
|
|
###-#### no truss eng 2/22/2001 4:17:53 PM
|
BLD-Conference | 2/21/2001 | 2/21/2001 | 2/21/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/21/2001 9:11:48 AM w/ Western htg re smoke/fire dampers req'd
|
BLD-Conference | 2/20/2001 | 2/20/2001 | 2/20/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/20/2001 11:06:16 AM w/ owner re insulation at hvac
|
BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 11:04:40 AM keep c/n, coil strap installed at south side roof...wip
|
BLD-Conference | 2/6/2001 | 2/6/2001 | 2/6/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/6/2001 10:29:09 AM magna wall stucco ok for 1hr ext per NER
|
BLD-Framing/Rough-in | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | FAIL |
Carl Dependahl
|
|
|
joe ###-#### shear nail, c/n; coil straps at roof, install hd's as req 2/5/2001 5:10:12 PM d 2/5/2001 5:10:17 PM
|
BLD-Conference | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 16:26:32. Contact: ###-####.w/ owner re firew 1/25/2001 12:00:13 PM alls 1/25/2001 12:00:18 PM
|
BLD-Footing | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PART |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/07/2000 at 08:48:46. Contact: .isolated col ftgs 12/7/2000 3:49:32 PM
|
BLD-Foundation | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PART |
Carl Dependahl
|
|
|
###-####; fnd ok 12/7/2000 3:49:09 PM
|
BLD-Concrete | 11/29/2000 | 11/29/2000 | 11/29/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/29/2000 12:37:28 PM ftgs, pend soils report (MTI?)
|
BLD-Framing/Rough-in | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | NR |
Carl Dependahl
|
|
|
joe ###-#### rebar not a frame 11/29/2000 12:36:35 PM
|
BLD-Conference | 11/20/2000 | 11/20/2000 | 11/20/2000 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/20/2000 10:30:18 AM w/ owner re ryder's bar ...has fire walls to avoid sprinkling bldg
|