Permit Information
Permit NumberBLD00-02375
StatusFinaled
Name ST LUKES
Site Address 190 E BANNOCK ST
Project NameST LUKES ED/NICU CONC
Customer NumberSTL980228
ePlanReviewNo
Description
ST LUKE'S ED/NICU EAST TOWER EXPANSION -(CONCRETE PACKAGE) TO CONSTRUCT THE CONCRETE FOUNDATION AND CONCRETE STRUCTURAL FRAME WORK FOR THE ST. LUKE'S EMERGENCY AND NEWBORN INTENSIVE CARE UNIT EXPANSION AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS A 79,455 SQ. FT., FOUR STORY HOSPITAL BUILDING EXPANSION WITH A 21,940 SQ. FT. SUB-BASEMENT AND A 21,085 SQ. FT. BASEMENT TO BE CONSTRUCTED AT THE EAST SIDE OF THE EXISTING ST. LUKE'S REGIONAL MEDICAL CENTER. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS PERMIT IS FOR THE CONSTRUCTION OF THE CONCRETE FOUNDATION AND STRUCTURAL FRAME ONLY, ALL OTHER PHASES OF CONSTRUCTION REQUIRED TO FINISH THIS BUILDLING EXPANSION WILL REQUIRE SEPARATE PERMITS. NOTE: THIS PERMIT WAS MODIFIED ON 2/7/01 TO ADD THE THIRD AND FOURTH FLOOR LEVELS TO THIS BUILDING. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference12/16/200212/19/200212/19/2002PPASS
DetailsCarl Dependahl
stan; rec'd affidavit from eng'r/spec insp, ok for l/c. 12/19/2002 5:25:49 PM
BLD-Conference12/13/200212/16/200212/16/2002ANR
DetailsCarl Dependahl
left msg 12/16/2002 4:49:59 PM
BLD-Conference12/11/200212/12/200212/12/2002ANR
DetailsCarl Dependahl
need plans 12/13/2002 4:04:01 PM
BLD-Aging Inspection12/11/200212/11/200212/11/2002 NR
DetailsCarl Dependahl
unable to contact supt...has t/o, will contact St Lukes 12/11/2002 10:28:48 AM
BLD-Concrete4/17/20024/18/20024/18/2002APASS
DetailsTom Arcoraci
for stairs-ground fl to the 1st floor--wendell- ###-#### new stairs from east basement exit ok 4/18/2002 9:34:20 AM
BLD-Concrete3/14/20023/15/20023/15/2002APART
DetailsCarl Dependahl
for exterior stairs on ground fl to 1st floor- ###-#### wip, chk run at final as concrete is wet. This is a req'd exit. 3/15/2002 11:19:43 AM
BLD-Concrete3/14/20023/15/20023/15/2002APART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/14/2002 5:08:32 PM ext concrete & int at expansion joint, keep c/n re install of 2hr rated joint system. 3/15/2002 11:21:53 AM
BLD-Conference3/13/20023/13/20023/13/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/13/2002 3:47:24 PM w/ Dan Stuart & GS...reviewed specs for 90min rated 3" solid glass"Vista brick" window assy...approved as fire rated window assy at north side occupancy separation/exterior wall...all sides are bounded by masonry to achieve 90 min rating( per detail)
BLD-Final3/8/20023/8/20023/8/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/8/2002 1:27:42 PM rec'd eng's affidavit; ok for t/o.
BLD-Conference2/12/20022/12/20022/12/2002PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/12/2002 6:15:33 PM c/n issued, need spec insp/eng's affidavits....chk cracks at "irregular" beams at bsmt lid (profile changed...sleeved areas show cracking at bottom edges)
BLD-Conference1/30/20021/30/20021/30/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/30/2002 11:56:16 AM re canopy, need submittal for modifications
BLD-Framing/Rough-in1/30/20021/30/20021/30/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/30/2002 3:10:38 PM ,need plan 1/30/2002 5:39:47 PM
BLD-Framing/Rough-in1/28/20021/29/20021/29/2002AFAIL
DetailsCarl Dependahl
need plans for canopy, complete firestops at int of bldg 1/30/2002 3:12:15 PM
BLD-Aging Inspection11/20/200111/20/200111/26/2001 NR
DetailsCarl Dependahl
st lukes nicu...wip 11/26/2001 11:49:28 AM
BLD-Conference9/20/20019/20/20019/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/20/2001 5:33:03 PM w/ supt & Mike Spiker of MTI onsite... spandrel edge reinf detail & insp procedure. eng'r has approved modifications.
BLD-Conference9/13/20019/13/20019/13/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/13/2001 1:23:09 PM w/ Mike Spiker, MTI & Wendall Jones, St. Lukes supt... repair of edge spandrels, studs; angles & imbeds to be added w/ eng's approval.
BLD-Conference9/4/20019/4/20019/4/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/4/2001 11:53:49 AM reviewed low strength result on spec insp report...will chk w/Wendall
BLD-Aging Inspection8/27/20018/27/20018/27/2001 PART
DetailsCarl Dependahl
St lukes east tower/ framing. wip 8/27/2001 11:36:30 AM
BLD-Concrete6/27/20016/27/20016/27/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/27/2001 at 06:50:04. Contact: ###-####....deck 4th fl, pend report 6/27/2001 10:48:31 AM
BLD-Framing/Rough-in6/27/20016/27/20016/27/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/27/2001 at 06:51:52. ok to begin cover at stair enclosures where no elec or plbgContact: ###-####. 6/27/2001 10:53:09 AM 6/27/2001 10:54:15 AM
BLD-Framing/Rough-in6/25/20016/25/20016/25/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/25/2001 9:19:16 AM ok to pre rock shaft wall behind elec chase &n along north stairs
BLD-Concrete6/21/20016/22/20016/22/2001APART
DetailsCarl Dependahl
Wendel ###-####; ok pend Spec insp report. 6/25/2001 9:24:30 AM
BLD-Framing/Rough-in6/8/20016/12/20016/12/2001ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/08/2001 at 12:07:41. Contact: ###-####. wil recall 6/11/2001 8:43:16 PM
BLD-Conference6/11/20016/11/20016/11/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/11/2001 10:06:37 AM conf. w/ Wendall & Lombac Const...need site insp to verify shafts/framing.
BLD-Concrete5/22/20015/23/20015/23/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/22/2001 at 13:43:15. Contact: ###-####. placed with special insp pending report. 5/23/2001 10:03:38 AM
BLD-Concrete4/30/20015/1/20015/1/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/30/2001 at 15:59:48. Contact: ###-####. nicu, wip pend report 5/2/2001 5:11:50 PM
BLD-Concrete4/4/20014/5/20014/5/2001APART
DetailsCarl Dependahl
2nd floor north side\###-#### Wip...ok pending reports. 4/5/2001 12:13:32 PM
BLD-Concrete3/12/20013/14/20013/14/2001APART
DetailsJim Storey
###-#### wip covered with special insp pending report. 3/14/2001 9:37:23 AM
BLD-Foundation2/21/20012/23/20012/23/2001APART
DetailsCarl Dependahl
basement wall\\###-####; pend mti report 2/23/2001 9:28:19 AM
BLD-Concrete2/21/20012/22/20012/22/2001APART
DetailsCarl Dependahl
slab\\###-####
BLD-Concrete12/29/20001/2/20011/2/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/29/2000 at 14:40:38. Contact: . placed with special insp. pending report. 1/2/2001 2:49:28 PM
BLD-Concrete12/13/200012/14/200012/14/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/13/2000 at 11:09:29. Contact: .pend report, 12/14/2000 9:14:22 AM
BLD-Concrete12/7/200012/8/200012/8/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/07/2000 at 14:30:08. Contact: .spec insp onsite, pend report 12/8/2000 11:32:34 AM
BLD-Concrete12/1/200012/1/200012/1/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/1/2000 10:45:49 AM wip, met w/Wendall, for st lukes...need insps called
BLD-Concrete10/3/200010/4/200010/4/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/03/2000 at 13:50:01. Contact: ###-####. sub basement ft and rebar ok for placement. north/east exterior wall lines. pending mti special inspection report. 10/4/2000 9:34:22 AM