Permanent Occupancy | | 8/27/2001 | 8/27/2001 | | DONE |
|
|
|
|
BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Tony Young
|
|
|
Laurie ###-####
temp. occ. ok untill trades are signed off 3/16/2001 3:30:14 PM
|
FIRE-Final Inspection | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | PASS |
Joe Tawney
|
|
|
early am ###-#### Reinsp OK for permanant occupancy 3/19/2001 8:03:44 AM
|
FIRE-Final Inspection | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | CANC |
Joe Tawney
|
|
|
###-#### Reschedule 3/16/2001 8:19:19 AM
|
BLD-Final | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/14/2001 at 09:57:02. Contact: ###-####.
need trades signed off 3/14/2001 2:47:33 PM
|
FIRE-Final Inspection | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 3/15/2001 8:15:59 AM
|
BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PASS |
Tony Young
|
|
|
FOR CONFERENCE--- JERRY ###-#### OR ###-#### -CALL 1ST BEFORE INSP
conf. w/ Bob A on final and plan changes, bathroom, roof vents, exit signs,ADA regs., etc. 3/8/2001 4:34:55 PM
|
BLD-Conference | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Tony Young
|
|
|
Conference on attic ventilation requirements, required ADA restroom requirements, and exit light requirements at main entrance.
|
BLD-Conference | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 17:23:45. Contact: ###-####.
conf. on final w/ Joe Tawney various issues 2/27/2001 11:39:02 AM
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 2/27/2001 1:30:24 PM Conf with Tony Young and bldg occupants reg fire and life safety issues
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 08:35:43. Contact: ###-####.
interior walls in rear ok to cover 2/6/2001 4:03:55 PM
|
BLD-Framing/Rough-in | 2/2/2001 | 2/5/2001 | 2/5/2001 | P | NR |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 2/2/2001 4:09:50 PM
|
BLD-Framing/Rough-in | 2/2/2001 | 2/2/2001 | 2/2/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 02/02/2001 at 08:50:33. Contact: ###-####.
ok to cover part of int. wall in rear 2/5/2001 8:37:34 AM
|
BLD-Framing/Rough-in | 1/24/2001 | 1/25/2001 | 1/25/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/24/2001 at 10:58:34. Contact: ###-####.
roof crickets ok 1/25/2001 11:42:26 AM
|
BLD-Framing/Rough-in | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 09:09:31. Contact: ###-####.
2 hr parapet wall framing ok on east side 1/9/2001 9:21:20 AM
|
BLD-Other | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/08/2001 at 10:09:26. Contact: .
int.door frame cut into masonary wall, already done 1/8/2001 2:10:50 PM
|
BLD-Framing/Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/28/2000 at 09:15:33. Contact: ###-####.
game room, dressing room and storage room ok to cover 11/28/2000 2:26:53 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/24/2000 | 11/24/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:45:09. Contact: ###-####.
c/n posted, need to verify elec. signoff 11/24/2000 2:22:05 PM
|