BLD-Other | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | DONE |
Bob Archibald
|
|
|
Bond has been posted - ok to sign off for final
|
Permanent Occupancy | | 8/17/2001 | 8/17/2001 | | DONE |
|
|
|
|
BLD-Conference | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | DONE |
Dave Hannah
|
|
|
Leave CN requirering posting of bond with Public works for issuance of certificate of occupancy. 8/10/2001 3:28:49 PM owner is allready working with bill shoud have bond some time next week 8/10/2001 3:29:52 PM
|
BLD-Aging Inspection | 7/9/2001 | 7/9/2001 | 7/9/2001 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PASS |
Dave Hannah
|
|
|
Final - reinspect
|
BLD-Final | 3/30/2001 | 4/3/2001 | 4/3/2001 | A | CANC |
Dave Hannah
|
|
|
Bill, ###-####
|
BLD-Final | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | NR |
Dave Hannah
|
|
|
###-#### 4/3/2001 4:26:31 PM
|
BLD-Final | 3/29/2001 | 3/30/2001 | 3/30/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### 3/30/2001 2:33:59 PM NEED TO FIRE CALLOR PLUMBING VENTS AND BOTTOM OF WALL IN ATTIC 3/30/2001 2:35:37 PM
|
FIRE-Final Inspection | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 3/30/2001 12:43:03 PM
|
FIRE-Final Inspection | 3/13/2001 | 3/14/2001 | 3/14/2001 | A | FAIL |
Joe Tawney
|
|
|
fire fn bill ###-#### Reinsp Fail C/N not done 3/14/2001 12:30:43 PM
|
FIRE-Final Inspection | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Joe Tawney
|
|
|
Bill, ###-#### Reinsp Fail C/N issued 3/6/2001 12:38:34 PM
|
FIRE-Final Inspection | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 3/2/2001 8:17:05 AM
|
BLD-Other | 1/16/2001 | 1/17/2001 | 1/17/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/16/2001 at 18:03:23. Contact: ###-####.insulation and seal kit ok tocover 1/17/2001 1:06:23 PM
|
BLD-Framing/Rough-in | 1/15/2001 | 1/16/2001 | 1/16/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/15/2001 at 15:24:11. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/10/2001 | 1/11/2001 | 1/11/2001 | A | FAIL |
Dave Hannah
|
|
|
brent ###-#### fr not ready they didnt have
mec elec rough ins 1/11/2001 11:53:45 AM
|
BLD-Framing/Rough-in | 12/18/2000 | 12/19/2000 | 12/19/2000 | A | PART |
Dave Hannah
|
|
|
Bill ###-#### shear nailing ok to cover north west& south walls east wall has three staps that are wrong need eng fix ok to cover if fix is on inside of wall
12/19/2000 11:04:11 AM
12/19/2000 11:05:55 AM
|
BLD-Conference | 12/12/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Tom Arcoraci
|
|
|
CONF-- BILL-- ###-#### 12/13/2000 2:33:48 PM may have eng design cut for trusss at one hour wall 12/13/2000 5:16:15 PM
|
BLD-Conference | 12/8/2000 | 12/8/2000 | 12/8/2000 | P | PASS |
Dave Hannah
|
|
|
BRENT ###-#### FOR CONF 12/8/2000 2:02:03 PM
|
BLD-Conference | 12/4/2000 | 12/5/2000 | 12/5/2000 | A | FAIL |
Tom Arcoraci
|
|
|
FOR CONF-- BRENT ###-#### 12/5/2000 9:15:19 AM occ sep not per plan 12/5/2000 11:11:30 AM
|
BLD-Footing | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | PASS |
Dave Hannah
|
|
|
###-#### brent
|