BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | A | PASS |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/4/2001 5:02:46 PM ok for c/o
|
Permanent Occupancy | | 4/4/2001 | 4/4/2001 | | DONE |
|
|
|
|
BLD-Conference | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/3/2001 3:48:25 PM need plbg ok'd for final
|
BLD-Final | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-#### TEMP OCC; c/n: eng's affidavit, other sig's, etc. OKfor t/o 3/12/2001 2:07:07 PM
|
BLD-Final | 3/9/2001 | 3/9/2001 | 3/9/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/09/2001 at 08:34:47. Contact: ###-####.
|
FIRE-Final Inspection | 3/8/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Rick Jackson
|
|
|
###-####
|
FIRE-Final Inspection | 3/7/2001 | 3/8/2001 | 3/8/2001 | P | FAIL |
Rick Jackson
|
|
|
Harry ###-####
|
BLD-Final | 3/2/2001 | 3/5/2001 | 3/5/2001 | P | NR |
Carl Dependahl
|
|
|
Perry ###-####
|
FIRE-Final Inspection | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | FAIL |
Rick Jackson
|
|
|
Perry ###-#### need to test extinguishing system; door hardware; occupant load sign; detectors for AHU shutdown 3/5/2001 1:06:34 PM
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### need final reinspect letter from mti re door frames, rest appears ok 3/1/2001 3:30:06 PM
|
BLD-Conference | 2/27/2001 | 2/28/2001 | 2/28/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/27/2001 at 13:42:10. Contact: ###-####. w/ contactor...need complete all items, submit eng's observation. 2/28/2001 9:34:19 AM
|
BLD-Conference | 2/27/2001 | 2/27/2001 | 2/27/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/27/2001 9:43:47 AM w/ cont re; t/o req's... need chk w/ Tim re omission of hvac access ladder
|
BLD-Framing/Rough-in | 1/19/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/19/2001 at 08:34:49. Contact: ###-####. 1st fl ok to cover; need stamped eng's observation report 1/19/2001 3:55:50 PM
|
BLD-Conference | 1/11/2001 | 1/11/2001 | 1/11/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/11/2001 5:12:14 PM need engs ok
|
BLD-Framing/Rough-in | 12/26/2000 | 12/27/2000 | 12/27/2000 | A | PASS |
Jim Sly
|
|
|
###-#### Pending special and seismic inspections and approvals. 12/27/2000 11:19:43 AM
|