BLD-Conference | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/24/2001 6:11:02 PM w/ St. Lukes proj mgr, need to determine fix for north wall....earth/wood separation.
|
BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 4/17/2001 | 4/19/2001 | 4/19/2001 | P | NR |
Tom Arcoraci
|
|
|
scott ###-#### needs other finals 4/19/2001 3:36:50 PM
|
BLD-Energy code compliance | 11/6/2000 | 11/7/2000 | 11/7/2000 | A | PASS |
Alan Hauser
|
|
|
Travis ###-####
|
BLD-Energy code compliance | 11/6/2000 | 11/6/2000 | 11/6/2000 | P | FAIL |
Steven Webb
|
|
|
needs energy report,c/n issued 11/6/2000 1:46:35 PM
|
BLD-Framing/Rough-in | 11/2/2000 | 11/3/2000 | 11/3/2000 | A | PART |
Steven Webb
|
|
|
Travis ###-####: c/n issued ok to insulate, need to verify compliance with c/n at energy. 11/3/2000 10:26:52 AM
|
BLD-Framing/Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | PART |
Steven Webb
|
|
|
TRavis ###-####: C/N issued, need eng. on Eng. I-beams plumbing cut outs. 10/31/2000 12:26:58 PM
|
BLD-Framing/Rough-in | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | PART |
Steven Webb
|
|
|
Travis ###-#### please call on your way out!! Reviewed prior c/n items.
|
BLD-Framing/Rough-in | 10/11/2000 | 10/11/2000 | 10/11/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### see cn notice two numerous to list 10/11/2000 2:40:04 PM
|
BLD-Concrete | 9/14/2000 | 9/14/2000 | 9/14/2000 | A | PASS |
Jim Storey
|
|
|
Added by Inspector: 301 On 9/14/2000 ft ok
|
BLD-Footing | 9/13/2000 | 9/14/2000 | 9/14/2000 | A | CANC |
Tony Young
|
|
|
FT INSP JAKE ###-####
j.s. to do 9/14/2000 10:14:32 AM
|