Permit Information
Permit NumberBLD00-02588
StatusFinaled
Name LIBERTY ONE
Site Address 10 N LIBERTY ST
Project NameLIBERTY ONE-SHELL
Customer Number 
ePlanReviewNo
Description
THE LIBERTY ONE BUILDING (SHELL) * TO CONSTRUCT A NEW 12,240 SQ.FT. ONE STORY SHELL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF TILT-UP CONCRETE EXTERIOR WALLS AND STEEL FRAME ROOF AND INTERIOR SUPPORT STRUCTURE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS IS A SHELL PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. THIS BUILDING IS FULLY FIRE SPRINKLED. SEPARATE FIRE SPRINKLER AND ALARM PLANS WITH APPROVAL AND SEPARATE PERMITTING IS REQUIRED FOR EACH BEFORE ANY OVERHEAD OR UNDERGROUND WORK IS DONE. DRH00-00158/PC#709-00/JCM GRADING PERMIT UNDER SEPARATE PLANS BLD00-02634
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20015/22/20015/22/2001PPASS
DetailsTom Arcoraci
Gene ###-#### please call first before going out ok for perm occ 5/22/2001 1:56:41 PM
BLD-Final5/16/20015/17/20015/17/2001APART
DetailsTom Arcoraci
Gene ###-#### please call first ok for temp occ need letters from spec insp and eng of record 5/17/2001 11:21:31 AM
BLD-Final5/15/20015/15/20015/15/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 5/15/2001 10:41:01 AM Reinsp OK FOR CERTIFICATE OF CONPLETION
FIRE-Final Inspection5/11/20015/11/20015/11/2001PFAIL
DetailsJoe Tawney
Gean ###-#### please call first Reinsp Fail hydro test FDC and spud in inspector test line 5/11/2001 2:08:10 PM
FIRE-Final Inspection4/30/20015/1/20015/1/2001AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 5/1/2001 12:13:49 PM
FIRE-Final Inspection4/27/20014/30/20014/30/2001ACANC
DetailsJoe Tawney
###-#### call first Cancel To be rescheduled 4/30/2001 12:04:37 PM
BLD-Conference3/15/20013/16/20013/16/2001ACANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 3/15/2001 10:55:19 AM
BLD-Framing/Rough-in3/14/20013/15/20013/15/2001APART
DetailsTom Arcoraci
Gene ###-#### rough in on the mechincal room. wip ok to cover elec room 3/15/2001 10:51:38 AM
BLD-Framing/Rough-in1/29/20011/29/20011/29/2001PPART
DetailsTom Arcoraci
###-#### welding for joist, metal deck on roof wip 1/29/2001 3:10:25 PM
BLD-Concrete1/3/20011/5/20011/5/2001APASS
DetailsDave Hannah
GENE ###-####- CONCRETE PANEL TILT UPS
BLD-Foundation1/3/20011/3/20011/3/2001PPART
DetailsTom Arcoraci
COLUMN & REBAR-- GENE ###-#### spec insp 1/3/2001 1:29:52 PM
BLD-Footing12/18/200012/18/200012/18/2000PPART
DetailsTom Arcoraci
FT -WILL POUR 3-- GENE ###-#### wip sp insp 12/18/2000 2:09:43 PM
BLD-Concrete12/14/200012/15/200012/15/2000APASS
DetailsDave Hannah
CONCRETE-- GENE ###-####special inspector on site 12/15/2000 10:35:34 AM
BLD-Concrete12/12/200012/13/200012/13/2000APART
DetailsTom Arcoraci
rebar and tilt up panels Jean ###-#### pouring at 9:00 wip 12/13/2000 10:30:40 AM
BLD-Concrete12/5/200012/5/200012/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/5/2000 5:03:52 PM mti onsite
BLD-Conference12/4/200012/4/200012/4/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/4/2000 3:16:49 PM w/ John Menard re plans
BLD-Concrete11/17/200011/20/200011/20/2000APART
DetailsAlan Hauser
###-#### slab insp
BLD-Concrete11/14/200011/14/200011/14/2000PPART
DetailsDave Hannah
###-#### please call first