Permit Number | BLD00-02653 |
Status | Finaled |
Name |
CAMERON INVESTMENTS L C ETAL
|
Site Address |
6169 W CLINTON ST
|
Project Name | |
Customer Number | |
ePlanReview | No |
Description |
*BOISE POLICE DEPARTMENT TRAINING CENTER* To combine two tenant spaces and the North half of a third (1/2 of 6165 & all of 6167 & 6169 Clinton) for use by the Boise Police Department as Training Classrooms & Administration Offices. To remodel portions within the existing 5,376 sq. ft. building, currently in use as a BPD Training & Adminsitration Center. To remove interior non-bearing walls to create a new training classroom, and a larger office, reception & lobby areas; to reuse some of the removed doors to close existing wall openings( must comply with current code to be reused); and to demolish existing restroom walls on two sides and construct new walls, access & restroom ceiling to provide unisex accessible restroom. To relocate fixture's W/I restroom for compliance with CABO/ANSI A117.1-92. Construction to be of wood or steel studs with sheetrock cover; 2" x 4" ceiling joists with sheetrock at restroom ceiling and repair of suspended ceiling & walls to match existing. To upgrade tenant separation wall to meet one-hour construction & provide 20 minute, self-closing, "S" labeled doors at all door openings through the tenant separation wall per note 11 of the attached plan review comments. All per approved plans, red-line notes & plan review comments attached. Review remainder of building for any imminent hazards. The scope of this work includes obtaining a certificate of occupancy for the tenant space when project is completed. (P.C.#721-00)/drs
|