Permit Information
Permit NumberBLD00-02653
StatusFinaled
Name CAMERON INVESTMENTS L C ETAL
Site Address 6169 W CLINTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
*BOISE POLICE DEPARTMENT TRAINING CENTER* To combine two tenant spaces and the North half of a third (1/2 of 6165 & all of 6167 & 6169 Clinton) for use by the Boise Police Department as Training Classrooms & Administration Offices. To remodel portions within the existing 5,376 sq. ft. building, currently in use as a BPD Training & Adminsitration Center. To remove interior non-bearing walls to create a new training classroom, and a larger office, reception & lobby areas; to reuse some of the removed doors to close existing wall openings( must comply with current code to be reused); and to demolish existing restroom walls on two sides and construct new walls, access & restroom ceiling to provide unisex accessible restroom. To relocate fixture's W/I restroom for compliance with CABO/ANSI A117.1-92. Construction to be of wood or steel studs with sheetrock cover; 2" x 4" ceiling joists with sheetrock at restroom ceiling and repair of suspended ceiling & walls to match existing. To upgrade tenant separation wall to meet one-hour construction & provide 20 minute, self-closing, "S" labeled doors at all door openings through the tenant separation wall per note 11 of the attached plan review comments. All per approved plans, red-line notes & plan review comments attached. Review remainder of building for any imminent hazards. The scope of this work includes obtaining a certificate of occupancy for the tenant space when project is completed. (P.C.#721-00)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/7/20013/7/2001 DONE
Details
BLD-Final2/27/20012/28/20012/28/2001APASS
DetailsAlan Hauser
###-#### ext 21 diane
BLD-Final2/14/20012/15/20012/15/2001ACANC
DetailsRuss Owen
diane -- ###-#### ext 21--fn police training center- call 1st before insp.done by 316. 2/15/2001 9:27:06 AM
BLD-Final2/14/20012/15/20012/15/2001AFAIL
DetailsJim Sly
diane -- ###-#### ext 21--fn police training center- call 1st before insp C/N Need appr plans and check door hardware at door (circle) 1 2/15/2001 9:50:50 AM
FIRE-Final Inspection2/5/20012/7/20012/7/2001APASS
DetailsJoe Tawney
###-####. Reinsp OK for certificate of completion 2/7/2001 2:16:36 PM
BLD-Final1/4/20011/5/20011/5/2001PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/04/2001 at 08:38:36. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 01/05/2001 at 09:33:46.
FIRE-Final Inspection1/4/20011/5/20011/5/2001AFAIL
DetailsJoe Tawney
###-####. Final Fail C/N issued 1/5/2001 1:36:09 PM
BLD-Framing/Rough-in12/11/200012/12/200012/12/2000APASS
DetailsAlan Hauser
FR INSP JOE-- ###-####