BLD-Final | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PASS |
Carl Dependahl
|
|
|
phil ###-#### fn occ
|
Permanent Occupancy | | 4/2/2001 | 4/2/2001 | | DONE |
|
|
|
|
BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Phil Last corr notice (340) stated to complete prior corr noticeof which contractor did not have on site. 3/27/2001 3:41:37 PM 3/27/2001 3:42:28 PM
|
BLD-Final | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### c/n, ok for t/o 1/8/2001 6:30:24 PM
|
FIRE-Final Inspection | 1/8/2001 | 1/8/2001 | 1/8/2001 | P | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 12/28/2000 | 12/29/2000 | 12/29/2000 | A | PART |
Jim Storey
|
|
|
phil ###-#### l/c for only one night 12/31/2000 12/29/2000 4:58:18 PM
|
FIRE-Final Inspection | 12/28/2000 | 12/28/2000 | 12/29/2000 | P | PART |
Rick Jackson
|
|
|
###-#### reinspection phil//// okay to occupy for only 12/31 1/2/2001 8:33:00 AM
|
FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/21/2000 | P | FAIL |
Rick Jackson
|
|
|
PER PHIL FOR CONF//// met with architect about exiting and occupant loads 12/21/2000 10:36:06 AM
|
BLD-Conference | 12/14/2000 | 12/14/2000 | 12/14/2000 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/14/2000 5:22:58 PM w/ YMC, want to install 3000kw heater a exit corridor, need hvac eng's ok
|
BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 | P | PART |
Carl Dependahl
|
|
|
fire corridor-- frank ###-#### -re-insp, lid ok, need hvac letter 12/13/2000 5:56:12 PM
|
BLD-Framing/Rough-in | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PART |
Carl Dependahl
|
|
|
fire corridor-- frank ###-####; need to submit re hvac at corridor 12/12/2000 5:24:30 PM
|
BLD-Framing/Rough-in | 12/6/2000 | 12/7/2000 | 12/7/2000 | A | PART |
Carl Dependahl
|
|
|
provide info for type 2 hood, letter for menu (no meat fried??) need hvac designers letter for corridor penetrations, etc ok to begin cover 12/7/2000 12:26:26 PM
|