Permit Information
Permit NumberBLD00-02660
StatusFinaled
Name BOISE RESEARCH CENTER INC
Site Address 6232 N MEEKER PL
Project NameCAPITAL DEVELOPMENT
Customer Number2K032
ePlanReviewNo
Description
CAPITAL DEVELOPMENT OFFICE BUILDING * TO CONSTRUCT A NEW 7,132 SQ,FT. MULTI-TENANT, OFFICE BUILDING WITH A 1,300 SQ.FT. BASEMENT. 2,880 SQ.FT IS BEING FINISHED FOR A TENANT ALONG WITH 1,050 SQ.FT FOR COMMON ENTRY AND RESTROOMS. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST AND CABO/ANSI A117.1. ADDITIONAL WORK COVERED IN THIS PERMIT IS RELATED ON SITE PARKING LOT AND LAND SCAPING. DRH00-00130, PC#728-00, MJP MODIFICATION *** 1/22/01 To modify the west basement wall and make an exit stair, create a 900 sq.ft. attic space for mechanical room and general office area, relocate mechanical equipment from basement to attic area. All work per the approved plans. MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/27/20019/27/20019/27/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/27/2001 at 10:14:16. Contact: ###-####. OK for perm Occ. 9/27/2001 3:36:13 PM
Permanent Occupancy 9/27/20019/27/2001 DONE
Details
FIRE-Final Inspection9/26/20019/26/20019/26/2001PPASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 9/26/2001 3:01:07 PM
BLD-Final8/17/20018/17/20018/17/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/17/2001 at 10:37:53. Contact: ###-####. C/N...OK for Temp Occ. Floor plan change at Bsmnt Requires submit to plan check for plan Mod....Therefor No Occupancy of Bsmnt or exterior exitway (from bsmnt) allowed until new plans approved and inspection completed. 8/17/2001 4:22:45 PM
FIRE-Final Inspection8/17/20018/17/20018/17/2001PPART
DetailsJoe Tawney
Reinsp OK for temporary occupancy of 1st floor only. No occupancy of basement until exiting issues have been resolved 8/17/2001 3:22:15 PM
BLD-Final8/15/20018/16/20018/16/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/15/2001 at 11:03:21. Contact: ###-####. C/N...Partial insp only....Architect to re-submit (plan Modification) Added basement walls, doors and omitted door at Bsmnt usable space. 8/16/2001 3:11:33 PM
FIRE-Final Inspection8/15/20018/16/20018/16/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 8/16/2001 10:21:34 AM
BLD-Other7/27/20017/30/20017/30/2001APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 07/27/2001 at 11:44:34. Contact: ###-####. Ceiling grid OK 7/30/2001 1:22:20 PM
BLD-Other6/27/20016/27/20016/27/2001AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/27/2001 at 06:56:37. Contact: ###-####. 6/27/2001 12:16:43 PM needs seismic pods 6/27/2001 12:19:22 PM
BLD-Framing/Rough-in5/7/20015/8/20015/8/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/07/2001 at 12:04:21. Contact: ###-####. west side of stairs ok ,east side failed called contractor. 12/8/2001 10:58:05 AM
FIRE-Conference4/25/20014/25/20014/25/2001PPASS
DetailsJoe Tawney
4/26/2001 8:58:04 AM Conf with contr on fire & life safety items for non spklr bldg 4/26/2001 8:58:54 AM
BLD-Framing/Rough-in4/13/20014/13/20014/13/2001PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/13/2001 at 10:45:28. Contact: ###-####.
BLD-Framing/Rough-in4/11/20014/12/20014/12/2001PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 04/11/2001 at 15:39:33. Contact: ###-####. C/N Trusses. 4/12/2001 10:50:58 PM
BLD-Framing/Rough-in3/29/20013/30/20013/30/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/29/2001 at 13:14:28. Contact: ###-####. EXT SHEAR PANELS OK TO COVER ALSO CHECK INT SHEAR PANELS ON EXT WALL ALL OK ALSO CHECKED ITER SHEAR WALL HOLD DOWNS AND EAST SIDE SHEETING AND NAILING OK 3/30/2001 10:40:07 AM
BLD-Framing/Rough-in3/26/20013/26/20013/26/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/26/2001 at 09:24:18. Contact: ###-####. nail at top blocking front wall line. 3/26/2001 3:59:47 PM
BLD-Framing/Rough-in3/20/20013/20/20013/20/2001PNR
DetailsJim Sly
###-#### Need to nail shear panels and bolt/nut HD's. 3/20/2001 2:43:32 PM
BLD-Conference3/6/20013/6/20013/6/2001APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 03/06/2001 at 07:13:15. Contact: ###-####. Conf on Bsmnt Usable space and misc. 3/6/2001 10:08:29 AM
BLD-Framing/Rough-in2/28/20012/28/20012/28/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/28/2001 at 08:04:22. Contact: ###-####. Insp of floor and floor nailing.....appears OK. 2/28/2001 1:30:15 PM
BLD-Footing2/15/20012/15/20012/15/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/15/2001 at 08:17:07. Contact: ###-####. Remainder of found wall OK pend special insp and appr. 2/15/2001 12:42:16 PM
BLD-Footing2/9/20012/9/20012/9/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/09/2001 at 07:08:07. Contact: ###-####. Footing for East 1/2 of bldg OK pend special insp and appr. 2/9/2001 2:26:37 PM
BLD-Footing2/7/20012/7/20012/7/2001PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 02/07/2001 at 09:05:37. Contact: ###-####. Footing for area other than Bsmnt OK pending special insp and appr. 2/7/2001 6:59:37 PM
BLD-Foundation1/31/20012/1/20012/1/2001PPART
DetailsJim Sly
###-#### pouring at 1 Bsmnt walls OK pend special insp and appr. 2/1/2001 11:16:36 AM
BLD-Foundation1/22/20011/24/20011/24/2001APART
DetailsJim Sly
###-#### will pour at 10:00 Foot OK pend special insp and test appr. 1/24/2001 1:24:17 PM
BLD-Conference1/23/20011/23/20011/23/2001PPART
DetailsJim Sly
###-#### Re-submittal for plan modification and notified to not go beyond what's approved. 1/23/2001 2:14:28 PM
BLD-Conference1/2/20011/3/20011/3/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/02/2001 at 17:04:20. Contact: ###-####.