BLD-Final | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 10:14:16. Contact: ###-####. OK for perm Occ. 9/27/2001 3:36:13 PM
|
Permanent Occupancy | | 9/27/2001 | 9/27/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 9/26/2001 3:01:07 PM
|
BLD-Final | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 10:37:53. Contact: ###-####. C/N...OK for Temp Occ. Floor plan change at Bsmnt Requires submit to plan check for plan Mod....Therefor No Occupancy of Bsmnt or exterior exitway (from bsmnt) allowed until new plans approved and inspection completed. 8/17/2001 4:22:45 PM
|
FIRE-Final Inspection | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PART |
Joe Tawney
|
|
|
Reinsp OK for temporary occupancy of 1st floor only. No occupancy of basement until exiting issues have been resolved 8/17/2001 3:22:15 PM
|
BLD-Final | 8/15/2001 | 8/16/2001 | 8/16/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 11:03:21. Contact: ###-####. C/N...Partial insp only....Architect to re-submit (plan Modification) Added basement walls, doors and omitted door at Bsmnt usable space. 8/16/2001 3:11:33 PM
|
FIRE-Final Inspection | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 8/16/2001 10:21:34 AM
|
BLD-Other | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 11:44:34. Contact: ###-####. Ceiling grid OK 7/30/2001 1:22:20 PM
|
BLD-Other | 6/27/2001 | 6/27/2001 | 6/27/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 06:56:37. Contact: ###-####. 6/27/2001 12:16:43 PM needs seismic pods 6/27/2001 12:19:22 PM
|
BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 12:04:21. Contact: ###-####. west side of stairs ok ,east side failed called contractor. 12/8/2001 10:58:05 AM
|
FIRE-Conference | 4/25/2001 | 4/25/2001 | 4/25/2001 | P | PASS |
Joe Tawney
|
|
|
4/26/2001 8:58:04 AM Conf with contr on fire & life safety items for non spklr bldg 4/26/2001 8:58:54 AM
|
BLD-Framing/Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 10:45:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/11/2001 at 15:39:33. Contact: ###-####. C/N Trusses. 4/12/2001 10:50:58 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 13:14:28. Contact: ###-####. EXT SHEAR PANELS OK TO COVER ALSO CHECK INT SHEAR PANELS ON EXT WALL ALL OK ALSO CHECKED ITER SHEAR WALL HOLD DOWNS AND EAST SIDE SHEETING AND NAILING OK 3/30/2001 10:40:07 AM
|
BLD-Framing/Rough-in | 3/26/2001 | 3/26/2001 | 3/26/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 09:24:18. Contact: ###-####. nail at top blocking front wall line. 3/26/2001 3:59:47 PM
|
BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | NR |
Jim Sly
|
|
|
###-#### Need to nail shear panels and bolt/nut HD's. 3/20/2001 2:43:32 PM
|
BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 07:13:15. Contact: ###-####. Conf on Bsmnt Usable space and misc. 3/6/2001 10:08:29 AM
|
BLD-Framing/Rough-in | 2/28/2001 | 2/28/2001 | 2/28/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 08:04:22. Contact: ###-####. Insp of floor and floor nailing.....appears OK. 2/28/2001 1:30:15 PM
|
BLD-Footing | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/15/2001 at 08:17:07. Contact: ###-####. Remainder of found wall OK pend special insp and appr. 2/15/2001 12:42:16 PM
|
BLD-Footing | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 07:08:07. Contact: ###-####. Footing for East 1/2 of bldg OK pend special insp and appr. 2/9/2001 2:26:37 PM
|
BLD-Footing | 2/7/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 09:05:37. Contact: ###-####. Footing for area other than Bsmnt OK pending special insp and appr. 2/7/2001 6:59:37 PM
|
BLD-Foundation | 1/31/2001 | 2/1/2001 | 2/1/2001 | P | PART |
Jim Sly
|
|
|
###-#### pouring at 1 Bsmnt walls OK pend special insp and appr. 2/1/2001 11:16:36 AM
|
BLD-Foundation | 1/22/2001 | 1/24/2001 | 1/24/2001 | A | PART |
Jim Sly
|
|
|
###-#### will pour at 10:00 Foot OK pend special insp and test appr. 1/24/2001 1:24:17 PM
|
BLD-Conference | 1/23/2001 | 1/23/2001 | 1/23/2001 | P | PART |
Jim Sly
|
|
|
###-#### Re-submittal for plan modification and notified to not go beyond what's approved. 1/23/2001 2:14:28 PM
|
BLD-Conference | 1/2/2001 | 1/3/2001 | 1/3/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 17:04:20. Contact: ###-####.
|