Permanent Occupancy | | 4/6/2001 | 4/6/2001 | | DONE |
|
|
|
|
BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:29:23. Contact: ###-####.
|
FIRE-Final Inspection | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Joe Tawney
|
|
|
4/5/2001 6:11:53 PM Final OK for permanant occupancy 4/5/2001 6:12:10 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | NR |
Carl Dependahl
|
|
|
###-####; unable to contact 4/2/2001 5:21:47 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 4/2/2001 4:28:20 PM
|
BLD-Other | 3/30/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 07:36:13. Contact: ###-####.ok except not done in hallway will check at next insp. 3/30/2001 3:27:10 PM
|
BLD-Other | 3/28/2001 | 3/29/2001 | 3/29/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 14:15:11. Contact: ###-####. grid needs perimeter wires with-in 8 in of walls. c/n. 3/29/2001 12:21:34 PM
|
FIRE-Sprinkler Rough-in | 3/7/2001 | 3/8/2001 | 3/7/2001 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 07:37:54. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/07/2001 at 07:45:14.
|
FIRE-Sprinkler Rough-in | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | PART |
Joe Tawney
|
|
|
OK on spklr rough in 3/8/2001 8:19:35 AM
|
BLD-Final | 2/26/2001 | 2/27/2001 | 2/27/2001 | A | PART |
Russ Owen
|
|
|
Bill Boettcher, ###-####framing not final. 2/27/2001 2:02:51 PM
|
BLD-Conference | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 16:46:54. Contact: ###-####.rear hallway is not required to be rated. 2/22/2001 12:22:11 PM
|
BLD-Conference | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/21/2001 5:04:14 PM w/ bldr re combustibles/backing req'd
|