BLD-Framing/Rough-in | 10/1/2003 | 10/1/2003 | 10/1/2003 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to cover basement 10/1/2003 12:42:58 PM
|
BLD-Framing/Rough-in | 9/9/2003 | 9/10/2003 | 9/10/2003 | A | PART |
Dave Hannah
|
|
|
HARVEY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks ok to cover basement walls 1st and 2nd floors 9/10/2003 10:36:25 AM
|
BLD-Framing/Rough-in | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | FAIL |
Dave Hannah
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs fire blocking ok to insulate 9/9/2003 10:06:28 AM
|
BLD-Conference | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | DONE |
Dave Hannah
|
|
|
###-#### harvery 8/27/2003 8:59:35 AM
|
BLD-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 | P | PART |
Carl Dependahl
|
|
|
chimney ok to remain, doesn't obstruct door 7/23/2003 1:04:10 PM
|
BLD-Framing/Rough-in | 7/22/2003 | 7/23/2003 | 7/23/2003 | A | NR |
Carl Dependahl
|
|
|
nel; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Aging Inspection | 6/17/2003 | 6/17/2003 | 6/17/2003 | | PASS |
Carl Dependahl
|
|
|
see history, WIP. 6/17/2003 10:22:36 AM
|
BLD-Aging Inspection | 4/1/2003 | 4/1/2003 | 4/1/2003 | | PASS |
Carl Dependahl
|
|
|
Log cabin, WIP... 4/1/2003 9:48:10 AM
|
BLD-Conference | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PASS |
Carl Dependahl
|
|
|
MARGIE; Phone #: ###-#### Internet Inspection Request from: Darla Downs..."phase 1" handrail changes approved verbally by Marty Santoyo; much of work is via grants & donations and is slow, apparently Armstrong Arch's has taken on this job (Margie Kennedy)...ok...this is a "city project" 1/29/2003 9:08:17 AM
|
BLD-Conference | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ designer...referred to design review 12/12/2002 8:46:15 AM
|
BLD-Conference | 12/10/2002 | 12/11/2002 | 12/11/2002 | P | PASS |
Carl Dependahl
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...W/ DESIGNER/PROJ. MGR: NEED DESIGN REVIEW OK FOR CHANGES TO RAILS; CONTACT p&Z 12/11/2002 2:59:24 PM
|
FIRE-Supply Line Cover | 3/5/2001 | 3/5/2001 | 3/5/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/5/2001 11:03:11 AM okay to cover 3/5/2001 11:06:48 AM
|
BLD-Conference | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PART |
Carl Dependahl
|
|
|
###-####, c/n...need historical review, comply w/UBC509 2/15/2001 3:40:49 PM
|
BLD-Footing | 1/16/2001 | 1/17/2001 | 1/17/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### PLANS ARE INSIDE THE DOOR; ftg at bsmt ramp, pend mti report 1/17/2001 11:48:43 AM
|