Permanent Occupancy | | 11/16/2001 | 11/16/2001 | | DONE |
|
|
|
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm when others sign perm 11/15/2001 11:43:59 AM
|
BLD-Framing/Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/9/2001 1:53:41 PM ok to rock left side of building, except for the garage .needs ele insp.
|
BLD-Final | 8/10/2001 | 8/10/2001 | 8/10/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/10/2001 12:39:40 PM Reinsp OK for permanant
|
BLD-Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Russ Owen
|
|
|
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
|
BLD-Final | 7/25/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Russ Owen
|
|
|
tim ###-####ok temp oc only , needs all per signatures and stairs have corrections.c/n on site. ok for temporary. 7/25/2001 5:08:42 PM
|
FIRE-Final Inspection | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for temp Occ 7/25/2001 3:10:52 PM Move FDC Monitor Contr vlvs on back flow 7/25/2001 3:11:41 PM
|
FIRE-Final Inspection | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 7/23/2001 3:46:16 PM
|
BLD-Final | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | FAIL |
Russ Owen
|
|
|
###-####. c/n posted also needs fire/life safety. 7/20/2001 3:33:01 PM
|
FIRE-Final Inspection | 7/19/2001 | 7/20/2001 | 7/20/2001 | P | CANC |
Rick Jackson
|
|
|
###-#### inspector #409 didn't have enough time to get to it 7/20/2001 3:58:21 PM
|
FIRE-Conference | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with contr regarding signage for project 6/20/2001 12:01:07 PM
|
BLD-Framing/Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | P | PASS |
Russ Owen
|
|
|
###-#### ok to sheetrock soffit. 1/4/2002 9:38:39 AM
|
BLD-Energy code compliance | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Russ Owen
|
|
|
John ###-#### ok to rock garages. 12/21/2001 1:56:02 PM
|
FIRE-Alarm Testing | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:50:33 AM
|
BLD-Energy code compliance | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | PASS |
Russ Owen
|
|
|
###-#### ok to sheetrock 12/16/2001 12:44:04 PM
|
BLD-Energy code compliance | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | FAIL |
Russ Owen
|
|
|
JOHN ALSO WANTS DRY NAILING INSPECTION ###-####
|
BLD-Framing/Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PART |
Russ Owen
|
|
|
###-#### ok to add 2nd layer at req areas. 12/14/2001 4:43:48 PM
|
FIRE-Conference | 5/11/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Joe Tawney
|
|
|
Tim ###-#### Conf with Gen contr about alarm system 5/14/2001 2:07:53 PM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/11/2001 | 5/11/2001 | P | PART |
Russ Owen
|
|
|
Tim ###-#### ok to i nsulate need some adnl caulking done . 12/11/2001 3:44:11 PM
|
BLD-Energy code compliance | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Russ Owen
|
|
|
john ###-#### .need to re-insp addnl items noted with contractor. 12/8/2001 5:43:47 PM
|
BLD-Framing/Rough-in | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Russ Owen
|
|
|
john ###-#### 2/7/2001 12:00:19 PM 12/7/2001 12:00:30 PM ok to insulate need to firestop walls at floor lines. 12/7/2001 1:35:35 PM
|
BLD-Framing/Rough-in | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | FAIL |
Russ Owen
|
|
|
Tim ###-#### Building #4 12/4/2001 9:18:08 AM
|
BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Russ Owen
|
|
|
TIM ###-#### FR ok to cover ext walls only,needs ele before frame insp. 12/2/2001 9:20:09 AM
|
BLD-Foundation | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | FAIL |
Dave Hannah
|
|
|
shear wall Kenneth ###-####crew covered up strapes they are going to uncover they also need to add bolts to mud plate and nail bottom plates on sec and third floors and nail strapes by stairs 4/27/2001 10:20:13 AM
|
BLD-Conference | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PART |
Russ Owen
|
|
|
Tim ###-####
|
BLD-Conference | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | CANC |
Dave Hannah
|
|
|
tim ###-#### bldg #4
|
BLD-Conference | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Russ Owen
|
|
|
Tim ###-####
|
BLD-Concrete | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Foundation | 2/5/2001 | 2/5/2001 | 2/5/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 1/25/2001 | 1/26/2001 | 1/26/2001 | A | PASS |
Russ Owen
|
|
|
ft insp tim ###-####
|