BLD-Final | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Russ Owen
|
|
|
Cathy has the card - all others have signed for perm.. ok perm oc. 12/6/2001 10:48:29 AM
|
Permanent Occupancy | | 12/6/2001 | 12/6/2001 | | DONE |
|
|
|
|
BLD-Final | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 12/5/2001 3:46:23 PM
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | PART |
Russ Owen
|
|
|
|
BLD-Final | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | PART |
Russ Owen
|
|
|
fn ###-####- john fn c/n posted ok for a temp oc. 9/28/2001 4:03:53 PM
|
FIRE-Final Inspection | 9/27/2001 | 9/27/2001 | 9/27/2001 | P | PASS |
Joe Tawney
|
|
|
fire fn john ###-####. Reinsp. OK permanent occ. 9/27/2001 3:51:29 PM
|
FIRE-Final Inspection | 9/19/2001 | 9/19/2001 | 9/19/2001 | P | FAIL |
Joe Tawney
|
|
|
Spklr system not completed. Could not test alarms 9/19/2001 2:07:02 PM
|
BLD-Framing/Rough-in | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | FAIL |
Russ Owen
|
|
|
###-#### ok to start rock except 2hr walls c/ns. 7/30/2001 3:00:40 PM
|
BLD-Framing/Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | FAIL |
Russ Owen
|
|
|
John ###-####need 2hr (after the fact) wall to be continous through all areas. 7/11/2001 4:27:43 PM
|
BLD-Framing/Rough-in | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Russ Owen
|
|
|
john ###-####.c/n for 2 hr area separation wall. 7/3/2001 12:25:18 PM
|
BLD-Framing/Rough-in | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Russ Owen
|
|
|
john ###-#### exterior shear
|
BLD-Framing/Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PART |
Russ Owen
|
|
|
partial framing shear wall tim ###-#### ok to side 6/28/2001 11:26:35 AM
|
FIRE-Alarm Testing | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:49:56 AM
|
BLD-Concrete | 3/30/2001 | 4/2/2001 | 4/2/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 16:29:27. Contact: ###-####.
|
BLD-Foundation | 3/14/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Russ Owen
|
|
|
###-####ext walls. 3/15/2001 1:00:04 PM
|
BLD-Foundation | 3/9/2001 | 3/12/2001 | 3/12/2001 | P | PASS |
Russ Owen
|
|
|
###-####ext footings ok, also approved by soils engineer. 3/12/2001 2:36:20 PM
|