Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-02820
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF
Site Address 855 N MAPLE GROVE RD
Project NameLINGER LONGER LODGE AP
Customer Number 
ePlanReviewNo
Description
BUILDING # 6 - TYPE B * TO CONSTRUCT A NEW 21,600 SQ.FT., THREE STORY, WOOD FRAMED, 24 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 7,200 SQ,FT AND CONTAINS 6 GARAGES, TWO, TWO BEDROOM UNITS AND FOUR ONE BEDROOM UNITS, THE SECOND FLOOR IS 14,400 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, ONE BEDROOM UNITS. THE THIRD FLOOR IS 14,400 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR ONE BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. MJP DRH 99-126 CUP 00-00061 PC#765-00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200111/29/200111/29/2001PPASS
DetailsRuss Owen
JOHN ###-#### ok perm oc. 11/29/2001 2:36:28 PM
Permanent Occupancy 11/29/200111/29/2001 DONE
Details
BLD-Final11/28/200111/28/200111/28/2001PFAIL
DetailsRuss Owen
###-#### john
BLD-Final11/27/200111/27/200111/27/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 11/27/2001 at 09:49:03. Contact: ###-####.ok temp oc c/n posted. 11/27/2001 4:14:29 PM
FIRE-Final Inspection11/26/200111/27/200111/27/2001APASS
DetailsTroy Cobbley
Life/safety finaled. OK for perm occ. 11/27/2001 9:44:27 AM
FIRE-Final Inspection11/20/200111/21/200111/21/2001AFAIL
DetailsTroy Cobbley
Install "no parking" signs on south side landscaping and at the front entrance, adjust all doors on building #6, 11/21/2001 8:32:54 AM 11/21/2001 8:36:34 AM
BLD-Framing/Rough-in9/26/20019/27/20019/27/2001AFAIL
DetailsRuss Owen
###-####
BLD-Framing/Rough-in9/26/20019/26/20019/26/2001PFAIL
DetailsRuss Owen
###-#### john
BLD-Framing/Rough-in9/18/20019/18/20019/18/2001PPART
DetailsRuss Owen
###-####- tim ok to cover . @nd level inside units have a chase with multiple line sets in and need fire caulking at the top . 9/18/2001 4:41:55 PM
BLD-Energy code compliance9/12/20019/12/20019/12/2001PPART
DetailsRuss Owen
john ###-#### need top of a chase at 2 nd level completed. 9/13/2001 8:58:52 AM
BLD-Framing/Rough-in8/31/20018/31/20018/31/2001PPART
DetailsRuss Owen
###-#### JOHN ok to insulate c/n. 8/31/2001 4:12:09 PM
BLD-Framing/Rough-in8/29/20018/29/20018/29/2001PPART
DetailsRuss Owen
###-#### john
BLD-Framing/Rough-in7/11/20017/11/20017/11/2001PPASS
DetailsRuss Owen
shear wall ###-####
BLD-Framing/Rough-in7/6/20017/6/20017/6/2001PFAIL
DetailsRuss Owen
ext shear 7/6/2001 3:50:33 PM
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect on req for exit signs. Adv not req by code 5/22/2001 10:46:32 AM
BLD-Concrete5/10/20015/11/20015/11/2001PPART
DetailsRuss Owen
Tim ###-####
BLD-Concrete5/8/20015/9/20015/9/2001ANR
DetailsRuss Owen
###-####
BLD-Concrete5/8/20015/8/20015/8/2001PNR
DetailsRuss Owen
###-#### bld #6
BLD-Foundation4/9/20014/10/20014/10/2001APASS
DetailsDave Hannah
tim ###-#### bldg #6
BLD-Foundation2/15/20012/15/20012/15/2001PCANC
DetailsRuss Owen
Tim ###-####