BLD-Aging Inspection | 12/11/2002 | 12/11/2002 | 12/11/2002 | | CANC |
Russ Owen
|
|
|
|
FIRE-Final Inspection | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Troy Cobbley
|
|
|
Life/safety finaled 12/5/2001 5:02:25 PM
|
Permanent Occupancy | | 12/6/2001 | 12/6/2001 | | DONE |
|
|
|
|
BLD-Final | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PASS |
Tom Arcoraci
|
|
|
JOHN ###-#### ok for perm occ 11/21/2001 10:01:04 AM
|
BLD-Aging Inspection | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PART |
Russ Owen
|
|
|
|
BLD-Final | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/20/2001 9:15:06 PM needs lock set on doors for temp also c/n other items. 8/21/2001 4:28:55 PM
|
BLD-Final | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/21/2001 5:27:07 PM ok temp oc c/n posted at site. 8/21/2001 5:29:53 PM
|
BLD-Final | 8/18/2001 | 8/20/2001 | 8/20/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/18/2001 at 15:45:47. Contact: ###-####.. needs all signatures on job card. 8/20/2001 3:49:21 PM
|
BLD-Final | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | CANC |
Russ Owen
|
|
|
###-#### john
|
BLD-Final | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PART |
Joe Tawney
|
|
|
Added by Inspector: 406 On 8/20/2001 3:24:05 PM Reinsp OK for temporary occupancy pending approval of resubmittal of additional mimi horns
|
BLD-Final | 8/20/2001 | 8/20/2001 | 8/20/2001 | A | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/20/2001 4:34:06 PM
|
BLD-Framing/Rough-in | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PART |
Russ Owen
|
|
|
John ###-####. ok to sheetrock drop soffit. 6/29/2001 4:18:28 PM
|
BLD-Energy code compliance | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | PART |
Russ Owen
|
|
|
###-####ok to drywall sec 1/2 1/15/2002 1:21:59 PM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PART |
Russ Owen
|
|
|
John ###-####ok to insulate 2 areas in green require repair. 1/12/2002 2:00:24 PM
|
BLD-Framing/Rough-in | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | FAIL |
Russ Owen
|
|
|
John ###-####
|
BLD-Framing/Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | PART |
Dave Hannah
|
|
|
shear wall John ###-#### ok to cover ext walls all but for the two ends problems with straps 5/24/2001 12:36:53 PM
|
FIRE-Alarm Testing | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Joe Tawney
|
|
|
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:51:50 AM
|
BLD-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | PART |
Russ Owen
|
|
|
This is an aging activity working on apartments 12/16/2001 11:41:22 AM
|
BLD-Concrete | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 2/19/2001 | 2/20/2001 | 2/20/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 15:10:30. Contact: ###-####. stem walls for bldg. no. one 2/20/2001 4:13:33 PM
|
BLD-Footing | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### Discrepancy on plans for footing rebar.....Need stamped letter for clarification from Eng prior to pour. 2/9/2001 9:26:43 AM
|