Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-02822
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF
Site Address 945 N MAPLE GROVE RD
Project NameLINGER LONGER LODGE AP
Customer Number 
ePlanReviewNo
Description
BUILDING # 1 - TYPE C * TO CONSTRUCT A NEW 23,060 SQ.FT., THREE STORY, WOOD FRAMED, 24 UNIT APARTMENT BUILDING. THE FIRST FLOOR IS 7,688 SQ,FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR THREE BEDROOM UNITS, THE SECOND FLOOR IS 7,200 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR, THREE BEDROOM UNITS. THE THIRD FLOOR IS 7,200 SQ.FT AND CONTAINS FOUR, TWO BEDROOM UNITS AND FOUR ONE BEDROOM UNITS. ALL CONSTRUCTION PER THE APPROVED PLANS. NOTE: THIS BUILDING HAS A NFPA 13-R FIRE SPRINKLER SYSTEM. MJP DRH 99-126 CUP 00-00061 PC#765-00
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/11/200212/11/200212/11/2002 CANC
DetailsRuss Owen
FIRE-Final Inspection12/5/200112/6/200112/6/2001APASS
DetailsTroy Cobbley
Life/safety finaled 12/5/2001 5:02:25 PM
Permanent Occupancy 12/6/200112/6/2001 DONE
Details
BLD-Final11/20/200111/21/200111/21/2001APASS
DetailsTom Arcoraci
JOHN ###-#### ok for perm occ 11/21/2001 10:01:04 AM
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PART
DetailsRuss Owen
BLD-Final8/20/20018/21/20018/21/2001AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 9:15:06 PM needs lock set on doors for temp also c/n other items. 8/21/2001 4:28:55 PM
BLD-Final8/21/20018/21/20018/21/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/21/2001 5:27:07 PM ok temp oc c/n posted at site. 8/21/2001 5:29:53 PM
BLD-Final8/18/20018/20/20018/20/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/18/2001 at 15:45:47. Contact: ###-####.. needs all signatures on job card. 8/20/2001 3:49:21 PM
BLD-Final8/20/20018/20/20018/20/2001PCANC
DetailsRuss Owen
###-#### john
BLD-Final8/20/20018/20/20018/20/2001PPART
DetailsJoe Tawney
Added by Inspector: 406 On 8/20/2001 3:24:05 PM Reinsp OK for temporary occupancy pending approval of resubmittal of additional mimi horns
BLD-Final8/20/20018/20/20018/20/2001ACANC
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 4:34:06 PM
BLD-Framing/Rough-in6/29/20016/29/20016/29/2001PPART
DetailsRuss Owen
John ###-####. ok to sheetrock drop soffit. 6/29/2001 4:18:28 PM
BLD-Energy code compliance6/14/20016/15/20016/15/2001APART
DetailsRuss Owen
###-####ok to drywall sec 1/2 1/15/2002 1:21:59 PM
BLD-Framing/Rough-in6/11/20016/12/20016/12/2001APART
DetailsRuss Owen
John ###-####ok to insulate 2 areas in green require repair. 1/12/2002 2:00:24 PM
BLD-Framing/Rough-in6/5/20016/6/20016/6/2001AFAIL
DetailsRuss Owen
John ###-####
BLD-Framing/Rough-in5/23/20015/24/20015/24/2001APART
DetailsDave Hannah
shear wall John ###-#### ok to cover ext walls all but for the two ends problems with straps 5/24/2001 12:36:53 PM
FIRE-Alarm Testing5/18/20015/21/20015/21/2001APASS
DetailsJoe Tawney
###-#### Conf with Lea Elect reg exit signs. Adv not req by code 5/22/2001 10:51:50 AM
BLD-Aging Inspection5/16/20015/16/20015/16/2001 PART
DetailsRuss Owen
This is an aging activity working on apartments 12/16/2001 11:41:22 AM
BLD-Concrete3/14/20013/15/20013/15/2001APART
DetailsRuss Owen
###-####
BLD-Foundation2/19/20012/20/20012/20/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/19/2001 at 15:10:30. Contact: ###-####. stem walls for bldg. no. one 2/20/2001 4:13:33 PM
BLD-Footing2/8/20012/9/20012/9/2001AFAIL
DetailsJim Sly
###-#### Discrepancy on plans for footing rebar.....Need stamped letter for clarification from Eng prior to pour. 2/9/2001 9:26:43 AM