BLD-Final | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Russ Owen
|
|
|
GATE CODE 7208 ###-#### special inspection has been provided for concrete cylindr test, exceeds required strength of 28 days 400 psi, meet compliance at 7 day test of 4660, Boise City had not been called out to inspect rebar. 12/31/2001 10:18:42 AM fer 12/31/2001 10:18:47 AM 12/31/2001 10:19:39 AM
|
BLD-Final | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Russ Owen
|
|
|
Craig ###-#### needs achd and s-i report for mono pole footing. 12/21/2001 1:56:35 PM
|
FIRE-Final Inspection | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Joe Tawney
|
|
|
###-####\\7208 Final OK for permanant occupancy 5/10/2001 10:31:38 AM
|
FIRE-Final Inspection | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### gate code 7208 Final Fail Approved plans not on site 5/9/2001 12:23:52 PM
|
BLD-Final | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | FAIL |
Jim Sly
|
|
|
###-#### Craig gate comb 7208 card is by elec equipment next to power C/N....Need Req signatures on Occ Request card and letter of appr from Eng of record. 4/23/2001 2:06:05 PM
|
BLD-Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Unable to connect with party responsible for paperwork. 4/20/2001 12:06:32 PM
|
BLD-Foundation | 2/14/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | PART |
Russ Owen
|
|
|
re-bar Mark ###-####s-i inspection will be performed./2001 3:25:10 PM 2/13/2001 3:25:32 PM
|