BLD-Final | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | PASS |
Mike Jordan
|
|
|
vince Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2014 | 7/16/2014 | 7/16/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 7/11/2014 | 7/14/2014 | 7/14/2014 | A | CANC |
Mike Jordan
|
|
|
Vince-please call for access, if no anser please call Denise ###-#### or ###-#### Phone #: ###-####.
|
BLD-Final | 7/14/2014 | 7/14/2014 | 7/14/2014 | P | FAIL |
Mike Jordan
|
|
|
Provide smoke detectors in bedrooms.
|
BLD-Other | 7/11/2014 | 7/11/2014 | 7/11/2014 | A | DONE |
Mike Jordan
|
|
|
Ok to schedule final inspection with $46.31 admin fee.
|
Extend Permit 180 days | | 10/4/2002 | 10/4/2002 | | DONE |
|
|
|
still working
|
BLD-Final | 3/20/2002 | 3/21/2002 | 3/21/2002 | P | FAIL |
Russ Owen
|
|
|
dan ###-#### fn c/n. 3/21/2002 4:34:51 PM
|
BLD-Final | 1/25/2002 | 1/31/2002 | 1/31/2002 | P | CANC |
Russ Owen
|
|
|
###-####--fn-- dan Called owner explained about the need for other trades to sign off prior to bld final. 1/31/2002 2:36:46 PM
|
BLD-Framing/Rough-in | 9/28/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Russ Owen
|
|
|
984 BEN. work in progress, owner had en questions. 10/1/2001 5:00:29 PM
|
BLD-Energy code compliance | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Energy code compliance | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | PART |
Russ Owen
|
|
|
Dan Short ###-####. need to have beam upper floor over window sized as per c/n also still need to work on wall at house side in basement for fire blocking. 7/16/2001 3:24:12 PM
|
BLD-Energy code compliance | 7/6/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Russ Owen
|
|
|
energy code-- ###-#### cell danial.posted c/n NOTE:cotractor and owner doing most all work here,and are not familiar with all related codes and trades. 7/10/2001 10:52:55 AM
|
BLD-Framing/Rough-in | 6/28/2001 | 6/29/2001 | 6/29/2001 | P | PART |
Russ Owen
|
|
|
###-#### c/n posted ok insulate. 6/29/2001 1:57:40 PM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | NR |
Russ Owen
|
|
|
drywall needs mec/ele/plm. 1/19/2002 4:35:04 PM
|
Extend Permit 180 days | | 5/21/2001 | 5/21/2001 | | DONE |
|
|
|
homeowner
|
BLD-Framing/Rough-in | 3/16/2001 | 3/19/2001 | 3/19/2001 | A | PART |
Russ Owen
|
|
|
CALL ###-#### COLEEN AFTER 11:00 CALL ###-#### . wanted to Know about beam in living room ,has girder that appears to be designed to cary ext roof, told them to verify with truss company,also told them to maintain slope of of ext deck over basement area, need pt for plates in basement, no other frame ispection done. not ready conference only. 3/19/2001 12:41:46 PM
|
BLD-Conference | 3/15/2001 | 3/16/2001 | 3/16/2001 | A | NH |
Tom Arcoraci
|
|
|
rick ###-#### for conf
|
BLD-Framing/Rough-in | 3/15/2001 | 3/16/2001 | 3/15/2001 | A | CANC |
Russ Owen
|
|
|
###-#### Rick cancelled by Colleen
|
BLD-Footing | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | CANC |
Jim Storey
|
|
|
Eric ###-#### Eric ###-#### 425 called and is on site will add insp. 1/10/2001 3:13:22 PM
|
BLD-Footing | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2001 3:31:02 PM crew used #4 bar plans call for 5 engineer ok to double 4bar
|
BLD-Footing | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2001 3:31:02 PM crew used #4 bar plans call for 5 engineer ok to double 4bar
|
BLD-Foundation | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2001 3:34:59 PM crew is working on wall what they have in place is ok they are using #4 at 6inchs on center as per engin ok
|
BLD-Foundation | 1/10/2001 | 1/10/2001 | 1/10/2001 | P | PART |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/10/2001 3:34:59 PM crew is working on wall what they have in place is ok they are using #4 at 6inchs on center as per engin ok
|
BLD-Footing | 1/2/2001 | 1/3/2001 | 1/3/2001 | A | CANC |
Alan Hauser
|
|
|
#425 1/3/2001 12:06:03 PM
|
BLD-Conference | 12/11/2000 | 12/11/2000 | 12/11/2000 | P | FAIL |
Dave Hannah
|
|
|
###-#### 12/11/2000 3:32:56 PMwrote c/n contractor is to stop work resubmit plans 12/11/2000 3:39:47 PM
|
BLD-Conference | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | PASS |
Carl Dependahl
|
|
|
###-####
|