BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Jim Storey
|
|
|
###-#### ron
|
Permanent Occupancy | | 1/29/2002 | 1/29/2002 | | DONE |
|
|
|
|
BLD-Final | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 10:11:43. Contact: ###-####. c/n,thresholds, exit doors (chk break away hdwe at main entry, etc. see c/n. ok for t/o. 8/24/2001 4:32:52 PM
|
BLD-Final | 8/22/2001 | 8/23/2001 | 8/23/2001 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 17:16:36. Contact: ###-####. needs signatures on occ card 8/23/2001 2:11:04 AM
|
FIRE-Final Inspection | 8/21/2001 | 8/22/2001 | 8/22/2001 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 14:20:59. Contact: ###-####.
|
BLD-Conference | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 17:01:48. Contact: ###-####.
|
FIRE-Final Inspection | 8/16/2001 | 8/17/2001 | 8/17/2001 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 17:05:37. Contact: ###-####. c/n issued 8/17/2001 4:31:25 PM
|
BLD-Other | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
|
BLD-Other | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 22:44:38. Contact: ###-####. ceillings ok except mony office vestabual light and com.room perimotor wires/ exit hardware at ele rm and back loading dock. 8/10/2001 9:04:11 AM
|
BLD-Other | 8/7/2001 | 8/8/2001 | 8/8/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:35:43. Contact: ###-####. delli primitor wires/ break rm primitor wires 8/8/2001 3:00:20 PM
|
BLD-Other | 8/3/2001 | 8/6/2001 | 8/6/2001 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 17:18:50. Contact: ###-####. hole in shaft/ 8/6/2001 2:17:13 PM
|
BLD-Other | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 15:12:29. Contact: ###-####. ceilling in vidio rm ok 8/1/2001 8:25:41 AM
|
BLD-Other | 7/26/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 09:33:04. Contact: ###-####. fozen food ceillg ok for cover. 7/27/2001 1:34:51 PM
|
BLD-Other | 7/23/2001 | 7/24/2001 | 7/23/2001 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 13:08:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/23/2001 at 13:11:39.
|
FIRE-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/11/2001 9:59:37 AM discussed address location with John
|
BLD-Other | 6/13/2001 | 6/13/2001 | 6/13/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 07:52:39. Contact: ###-####. 6/13/2001 1:12:33 PM 6/13/2001 3:59:32 PM roof deck over elec room and front entrt needs botton punched and deck weled to ledger have special inspection reinspect 6/13/2001 4:01:45 PM
|
BLD-Other | 5/25/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 5/25/2001 8:50:08 AM left correction notice for rain water system installed without a permit.
|
BLD-Framing/Rough-in | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 10:11:31. Contact: ###-####.
|
BLD-Other | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 08:27:56. Contact: ###-####. missing botton punching and clean out of south paripett mortor over 5/8 into wall cavity for grout. 4/25/2001 9:18:09 AM
|
BLD-Other | 4/13/2001 | 4/16/2001 | 4/16/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 12:59:30. Contact: ###-####. north roof deck ok for cover. 4/16/2001 9:15:21 AM
|
FIRE-Conference | 4/10/2001 | 4/11/2001 | 4/11/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 14:39:56. Contact: ###-####. discussed knox box location; told him to call fire station for locations 4/11/2001 9:41:12 AM
|
BLD-Other | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 16:31:46. Contact: ###-####. roof deck welding in progess appeares ok special insp. on site and will verify north half in report upon completion. 4/10/2001 10:58:18 AM
|
BLD-Other | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:21:49. Contact: ###-####. roof deck welds under sized. 4/6/2001 9:14:31 AM
|
BLD-Footing | 3/12/2001 | 3/13/2001 | 3/13/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/12/2001 at 15:43:50. Contact: . placed with special insp. pending report / reviewed plan. 3/13/2001 4:51:43 PM
|
BLD-Footing | 3/7/2001 | 3/8/2001 | 3/8/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/07/2001 at 10:11:27. Contact: ###-####. placed with special insp pending report. 3/8/2001 5:06:26 PM
|
BLD-Foundation | 3/1/2001 | 3/2/2001 | 3/2/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 14:18:38. Contact: ###-####.
|
BLD-Footing | 2/28/2001 | 3/1/2001 | 3/1/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/28/2001 at 15:46:38. Contact: ###-####. placed with special insp.pending report. 3/1/2001 3:40:22 PM
|
BLD-Footing | 2/26/2001 | 2/27/2001 | 2/27/2001 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 13:54:00. Contact: ###-####. placed with special insp. kleinfelder ed sloane. tech. icbo cert. 2/27/2001 3:27:02 PM
|
BLD-Footing | 2/22/2001 | 2/26/2001 | 2/26/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 16:29:14. Contact: ###-####.Klienfeilder is 2/26/2001 12:27:33 PM special insp. 2/26/2001 12:28:31 PM
|