Permanent Occupancy | | 12/4/2001 | 12/4/2001 | | DONE |
|
|
|
|
BLD-Final | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | PASS |
Tony Young
|
|
|
###-####
ok for perm. occ. as long as others are ok 10/16/2001 2:02:54 PM
|
BLD-Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted 10/3/2001 11:31:19 AM
|
BLD-Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | FAIL |
Tony Young
|
|
|
###-####
c/n posted 10/3/2001 11:31:19 AM
|
FIRE-Final Inspection | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Rick Jackson
|
|
|
###-#### they will have the extinguishers and address installed on Vine st. for structural inspector 10/3/2001 9:36:33 AM
|
BLD-Concrete | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Tony Young
|
|
|
###-####
holes for carport, wip, ok w/ verbal corrections 8/27/2001 3:47:49 PM
|
BLD-Footing | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | CANC |
Tony Young
|
|
|
###-#### wayne--cancel per wayne
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PASS |
Tony Young
|
|
|
wip 8/7/2001 12:23:44 PM
|
BLD-Energy code compliance | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 | P | PASS |
Tony Young
|
|
|
April ###-####
ext. shear ok also 5/25/2001 12:43:50 PM
|
BLD-Energy code compliance | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | NR |
Tony Young
|
|
|
Titan const ###-####
|
BLD-Aging Inspection | 5/16/2001 | 5/16/2001 | 5/16/2001 | | CANC |
Tony Young
|
|
|
This is an aging activity,ok 5/16/2001 8:28:07 AM
|
BLD-Footing | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 3/6/2001 4:07:44 PM
iterior ftgs still not redone , phone has been busy yesterday and today 3/7/2001 11:51:18 AM
|
BLD-Footing | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | NR |
Tony Young
|
|
|
Duane ###-####
|
BLD-Footing | 3/2/2001 | 3/2/2001 | 3/2/2001 | P | FAIL |
Tony Young
|
|
|
###-####
interior ftgs. , need to redo per approved plans 3/2/2001 2:01:26 PM
|
BLD-Foundation | 2/8/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 10:12:02 AM partial pour back bldg; setting bolts...appears 30" sst bolts used at hd's, watch connections for proper install as bolts actually larger than req'd.
|
BLD-Foundation | 2/6/2001 | 2/7/2001 | 2/7/2001 | P | PART |
Carl Dependahl
|
|
|
###-####
bldg a walls, set back appears ok; ok to set hd bolts. 2/7/2001 5:55:49 PM
|