Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-03185
StatusFinaled
Name IDAHO ATHLETIC CLUB (PHASE I)
Site Address 2999 N LAKEHARBOR LN
Project NameIDAHO ATHLETIC CLUB
Customer Number 
ePlanReviewNo
Description
IDAHO ATHLETIC CLUB - TO CONSTRUCT A NEW 29,400 SQ. FT., TWO STORY, ATHLETIC CLUB BUILDING CONSTRUCTED OF MASONRY EXTERIOR WALLS, CONCRETE FLOORS AND STEEL STRUCTURAL ROOF FRAMING WITH METAL ROOF DECK. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR ONE-HOUR CONSTRUCTION SUBSTITUTION. THIS IS THE FIRST PHASE OF A PROPOSED THREE PHASE BUILDING PROJECT. THIS BUILDING PHASE CONTAINS RACQUET BALL COURTS, EXERCISE AREAS, LOCKERS, RESTROOMS AND OFFICE AREAS. FIRST FLOOR: 14,850 SQ. FT., SECOND FLOOR: 14,550 SQ. FT.. DRH00-00117/CUP00-00060/PC#888-00/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection12/27/200112/28/200112/28/2001APASS
DetailsTroy Cobbley
fire fn -- ###-####- kent fire finaled 12/28/2001 8:37:45 AM
Permanent Occupancy 12/28/200112/28/2001 DONE
Details
BLD-Final12/21/200112/26/200112/26/2001APART
DetailsTony Young
###-####
ok for final after other trade inspectors are ok 12/26/2001 10:56:21 AM
BLD-Aging Inspection10/24/200110/24/200110/24/2001 PART
DetailsTony Young
wip 10/24/2001 2:30:20 PM
BLD-Conference8/23/20018/24/20018/24/2001ACANC
DetailsTony Young
BLD-Other8/23/20018/23/20018/23/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2001 at 07:59:32. Contact: ###-####.final,, ok for temp. occ. 8/24/2001 8:23:27 AM
FIRE-Final Inspection8/23/20018/23/20018/23/2001PPART
DetailsJoe Tawney
Reinsp OK for temporary occupancy Temp FDC and access road. 2landings at rear of bldg. Fax of alarm signals 8/23/2001 4:45:30 PM
BLD-Final8/21/20018/22/20018/22/2001AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 08/21/2001 at 17:20:40. Contact: ###-####.still need fire sign off, conf. on rest of final 8/22/2001 12:15:49 PM
FIRE-Final Inspection8/22/20018/22/20018/22/2001AFAIL
DetailsJoe Tawney
###-#### Reinsp Fail all issues not resolved 8/22/2001 12:20:40 PM
BLD-Final8/21/20018/21/20018/21/2001PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 08/21/2001 at 09:34:06. Contact: ###-####.
need trades signed off, misc. other items 8/21/2001 3:49:52 PM
FIRE-Final Inspection8/21/20018/21/20018/21/2001PNR
DetailsJoe Tawney
Reinsp not ready all issues not resolved 8/21/2001 3:45:00 PM
BLD-Conference8/19/20018/20/20018/20/2001APASS
DetailsCarl Dependahl
meet w/ Tony please 8/19/2001 11:09:33 PM keep c/n, no occupancy til reinsp ok'd by fire 8/20/2001 9:53:00 AM
BLD-Other8/17/20018/20/20018/20/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/17/2001 at 17:59:49. Contact: ###-####. met w/ Joe Tawney to go over job,
I had to leave to go to other jobs 8/20/2001 11:44:54 AM
FIRE-Final Inspection8/19/20018/20/20018/20/2001AFAIL
DetailsJoe Tawney
Final Fail Multiple items 8/20/2001 11:54:23 AM
BLD-Conference8/17/20018/17/20018/17/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 8/17/2001 5:30:58 PM final walk-thru w/ Tony & Petra...c/n issued re exits, fire & other insps not complete, storage below stairs, etc. Partial insp only (to identify life-safety issues.) Phase 1 of project.
BLD-Final8/16/20018/17/20018/17/2001PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 08/16/2001 at 16:23:24. Contact: ###-####.kent 8/17/2001 2:11:12 PM
met w/ 340, c/n posted , DO NOT OCCUPY 8/17/2001 5:03:19 PM
BLD-Framing/Rough-in6/28/20016/29/20016/29/2001APART
DetailsTony Young
lower south 6/28/2001 9:41:23 AMok to cover lower south 6/29/2001 3:16:23 PM
BLD-Framing/Rough-in6/27/20016/28/20016/28/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/27/2001 at 11:05:18. Contact: ###-####.
c/n on fire blocks in stud cavitys w/ combustion, ok to cover lower south area small rooms only 6/28/2001 9:40:15 AM
BLD-Framing/Rough-in6/1/20016/11/20016/11/2001ACANC
DetailsDave Hannah
6/1/2001 3:28:02 PM
BLD-Framing/Rough-in6/4/20016/5/20016/5/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/04/2001 at 15:01:52. Contact: ###-####. WIP 6/5/2001 10:59:56 AM
BLD-Framing/Rough-in5/31/20016/1/20016/1/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/31/2001 at 12:11:57. Contact: ###-####.some int. ok, pending elec. on other 6/1/2001 3:28:41 PM
BLD-Framing/Rough-in5/18/20015/21/20015/21/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 05/18/2001 at 14:18:57. Contact: ###-####.
c/n posted, ok after trade sign offs to cover 2nd floor, int. walls 5/21/2001 11:00:58 AM
BLD-Concrete3/20/20013/20/20013/20/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/20/2001 at 07:28:15. Contact: ###-####.
masonary, pending S.I. report 3/20/2001 1:05:50 PM
BLD-Concrete3/14/20013/15/20013/15/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/14/2001 at 17:02:26. Contact: ###-####.
pending S.I. report 3/15/2001 9:45:09 AM
BLD-Concrete3/13/20013/14/20013/14/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/13/2001 at 15:59:50. Contact: ###-####.
pending S.I. report 3/14/2001 10:03:26 AM
BLD-Concrete3/12/20013/13/20013/13/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/12/2001 at 08:40:10. Contact: ###-####.
pending S. I. report 3/13/2001 1:40:59 PM
BLD-Concrete3/8/20013/9/20013/9/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 03/08/2001 at 16:11:30. Contact: ###-####.
BLD-Concrete3/7/20013/8/20013/8/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/07/2001 at 14:58:03. Contact: ###-####.
pending special inspector report 3/8/2001 10:26:48 AM
BLD-Concrete3/5/20013/6/20013/6/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 03/05/2001 at 14:33:41. Contact: ###-####.
masonary, bond beams, plates, wip, ok pending special inspector report 3/6/2001 9:42:36 AM
BLD-Concrete3/1/20013/2/20013/2/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/01/2001 at 20:05:37. Contact: ###-####. masonry, spec. insp onsite...wip. Met w/ new supt. 3/2/2001 9:11:17 AM
BLD-Concrete2/28/20013/1/20013/1/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/28/2001 at 16:17:32. Contact: ###-####.
pending mti report 3/1/2001 9:58:46 AM
BLD-Concrete2/26/20012/27/20012/27/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/26/2001 at 16:01:23. Contact: ###-####.
masonary, pending mti report 2/27/2001 9:44:27 AM
BLD-Concrete2/23/20012/26/20012/26/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/23/2001 at 16:25:16. Contact: ###-####.
bond beam wip, pending special insp. report 2/26/2001 9:30:32 AM
FIRE-Hydro test above ground2/22/20012/23/20012/23/2001PCANC
DetailsJoe Tawney
Cancel should be structural insp 2/26/2001 8:07:40 AM
BLD-Foundation2/15/20012/16/20012/16/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/15/2001 at 17:19:48. Contact: ###-####.
wip, pending special rpt. 2/21/2001 8:35:33 AM
BLD-Footing2/15/20012/15/20012/15/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/15/2001 at 09:04:46. Contact: ###-####.
met w/ kent, new job super, wip ok pending special insp. report, also t/w s. inspector 2/15/2001 3:50:18 PM
BLD-Footing2/6/20012/7/20012/7/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/06/2001 at 12:19:06. Contact: ###-####.
east wall and more int. ftgs., wip, still waiting for survey , pending special inspection report 2/7/2001 11:36:38 AM
BLD-Footing2/5/20012/6/20012/6/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 02/05/2001 at 09:47:44. Contact: ###-####.
special on site, Gary w/ mti// wip, verbal corrections to be taken care of b-4 pour, south and west wall and interior pads pending report from special 2/6/2001 9:47:01 AM
BLD-Footing1/31/20012/1/20012/1/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/31/2001 at 09:43:29. Contact: ###-####. met w/ supt. onsite; need suvey report, all spec. insp's called to city et 2/1/2001 10:11:07 AM c. 2/1/2001 10:11:13 AM
BLD-Footing1/29/20011/30/20011/30/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 14:43:13. Contact: ###-####. mti report pending...need surveyors statement for p.l. 1/30/2001 9:43:43 AM