BLD-Final | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | DONE |
Russ Owen
|
|
|
Final ok/perm. occ. cert.
|
Permanent Occupancy | | 3/13/2002 | 3/13/2002 | | DONE |
|
|
|
|
BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 12/17/2001 2:10:24 PM need detail for 4 hour fire wall, ul u901, need to fully grout cells,first pour has been done and has not been fully grouted, called architect will need to provide details for 4 hour compliance,also contractor on site notified.
|
BLD-Conference | 11/13/2001 | 11/13/2001 | 11/13/2001 | A | CANC |
Jim Storey
|
|
|
Added by Inspector: 301 On 11/13/2001 11:00:54 AM
|
FIRE-Final Inspection | 11/12/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Troy Cobbley
|
|
|
OK for perm occ 11/13/2001 3:41:16 PM
|
BLD-Final | 11/7/2001 | 11/9/2001 | 11/9/2001 | A | FAIL |
Russ Owen
|
|
|
Needs Fire/Life Safety, ACHD, Zoning, also rest room signage,fire caulk at auto repair, complete all hand rail installations. 11/9/2001 2:10:17 PM
|
BLD-Final | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 11/9/2001 2:12:59 PM Ok for temp oc if the Fire/Life Safety inspector signs card and ACHD. 11/9/2001 4:39:02 PM
|
FIRE-Final Inspection | 11/7/2001 | 11/9/2001 | 11/9/2001 | A | NR |
Troy Cobbley
|
|
|
fire alarm and fire sprinkler inspection were not complete 11/12/2001 9:30:26 PM
|
BLD-Conference | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | PART |
Russ Owen
|
|
|
###-#### Tom> went over req for final . Need all signatures on card, also I have the final s-i report given to me this day, needs all handrails and fire caulking done,1 sink needs to be raised,strrage rack needs to be moved out from door. no c/n at ths time walk thru only would like to possibly obtain t.c.o by friday. 11/5/2001 12:33:44 PM 11/5/2001 12:34:28 PM
|
FIRE-Conference | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | DONE |
Troy Cobbley
|
|
|
discussed fire doors with superintendant 11/5/2001 3:41:03 PM
|
BLD-Final | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Russ Owen
|
|
|
###-#### AL . went over req for final . 10/19/2001 3:55:19 PM
|
BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 10/3/2001 11:43:22 AM grid ceiling. 10/3/2001 11:49:41 AM
|
BLD-Framing/Rough-in | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 10/1/2001 4:32:05 PM . Need pods at upper floor and lower floor ceilng at the north side also slack wires on the round drop in lights at all areas contractor and electrical contractor notified. Made copy of the requirement gave to general contractor from volume 3 of building code. 10/1/2001 4:59:13 PM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | CANC |
Tom Arcoraci
|
|
|
jay- ###-####
|
BLD-Framing/Rough-in | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | NR |
Russ Owen
|
|
|
fr jay- ###-####
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Russ Owen
|
|
|
###-#### . need to complete sheetrocking and penetrations of 1 hr stair well . 9/17/2001 2:42:47 PM
|
BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Russ Owen
|
|
|
###-#### al . ok to cover 2nd floor non bearing walls. 8/27/2001 2:34:42 PM
|
BLD-Conference | 8/18/2001 | 8/20/2001 | 8/20/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/18/2001 at 08:24:01. Contact: ###-####.info for req of temp oc. 8/20/2001 11:01:59 AM
|
BLD-Conference | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/20/2001 3:55:43 PM . went over the 1 hour stair corridor ,the walls will be continous up to the metal roof deck, and the need for a shaft to the skylight would not be required ,if acceptable to architect,also went over this with plan reveiw. 8/20/2001 3:59:46 PM
|
BLD-Conference | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 16:27:27. Contact: .
|
BLD-Framing/Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Russ Owen
|
|
|
###-#### al sparks . need resubmittals for s-3 service area firewall and stairs which are 1 hour rated,also exhaust shaft. 8/9/2001 12:17:20 PM
|
BLD-Framing/Rough-in | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/3/2001 11:21:22 AM . ok to cover lower floor walls at rear rest rooms offices. 8/3/2001 4:41:42 PM
|
BLD-Framing/Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/27/2001 at 07:54:39. Contact: .need a fire damper in the auto parts room,also prior note needs to be addressed also the 1 hour duct chase for exhaust ,also plumbing inspection. they called for a lower floor partial area only. 7/27/2001 3:50:13 PM
|
BLD-Framing/Rough-in | 7/19/2001 | 7/23/2001 | 7/23/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 09:56:32. Contact: ###-####.shaft for exhaust duct,may seek approval for fire 7/23/2001 1:05:25 PM damper at conc floor also auto inspection area ,may seek change order to delete 1 hour occupancy,but no approvals at this time. 3/2001 1:06:24 PM 7/23/2001 1:06:50 PM
|
BLD-Footing | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 10:59:20. Contact: .ok subject to s-i. 12/2/2001 9:27:07 AM
|
BLD-Footing | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 11:01:25. Contact: .
|
BLD-Footing | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 07:16:11. Contact: . Subject to approval from Special inspector. 11/24/2001 4:11:29 PM
|
BLD-Footing | 4/20/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 16:25:37. Contact: .s-i required. 11/24/2001 9:42:14 AM
|
BLD-Footing | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 07:42:54. Contact: . 11/19/2001 1:17:36 PM11/19/2001 1:17:38 PMs work in progress, meet with contractor special inspection will be performed when complete. 11/19/2001 1:18:53 PM
|
BLD-Footing | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 07:42:54. Contact: . 11/19/2001 1:17:36 PM11/19/2001 1:17:38 PMs work in progress, meet with contractor special inspection will be performed when complete. 11/19/2001 1:18:53 PM
|
BLD-Footing | 4/16/2001 | 4/16/2001 | 4/16/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/16/2001 at 10:44:12. Contact: ###-####. ok subject to s-i. 11/16/2001 4:39:21 PM
|
BLD-Footing | 4/10/2001 | 4/11/2001 | 4/11/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 18:19:57. Contact: ###-####.subject to s-i. 4/11/2001 4:08:35 PM
|
BLD-Concrete | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 17:26:18. Contact: . MTI on site for lower elevator shaft of elevator. 4/6/2001 12:03:29 PM
|
BLD-Footing | 4/4/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 09:38:51. Contact: ###-####. 2 10x10 footing and elevator shaft footingds ok. 4/4/2001 3:53:00 PM
|
BLD-Conference | 3/30/2001 | 4/3/2001 | 4/3/2001 | A | PART |
Russ Owen
|
|
|
FOR CONF-- -- AL-- ###-#### -CALL 1ST BEFORE INSP
|