BLD-Final | 3/15/2002 | 3/18/2002 | 3/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 12:32:20. Contact: ###-####.
|
BLD-Final | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/18/2002 11:30:52 AM Call ###-#### for access. 3/18/2002 11:34:45 AM.NOT the right permit I added in wrong number. 3/18/2002 12:19:52 PM
|
BLD-Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | FAIL |
Dave Hannah
|
|
|
###-####ROBINCALL BEFORE YOU GO c/n on site 11/16/2001 11:33:14 AM
|
BLD-Grading Inspection | 11/16/2001 | 11/16/2001 | 11/16/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading is approved.
|
BLD-Conference | 7/11/2001 | 7/16/2001 | 7/16/2001 | A | PASS |
Tony Young
|
|
|
conf. on final, mech. room ceiling need not be rocked, just fire blocks/ mineral wool above walls in floor joists cavities per owners request 7/16/2001 2:32:58 PM
|
BLD-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Tony Young
|
|
|
CALL FIRST ###-####
conf. on final 7/11/2001 3:27:14 PM
|
BLD-Energy code compliance | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Steven Webb
|
|
|
Energy report needed prior to final. 3/30/2001 10:57:21 AM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | A | PASS |
Steven Webb
|
|
|
###-#### Prior c/n corrections verified; engineering supplied. 3/30/2001 10:57:58 AM
|
BLD-Energy code compliance | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PART |
Russ Owen
|
|
|
bearing for truss a-6, fire block stairs basement areas and drop ceiling in hall, letter from engineer for all changes on site,but required addnl work, this work needs to be verified by the engineer as being complete.c/n posted. ok to insulate. 3/28/2001 3:40:07 PM
|
BLD-Energy code compliance | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | NR |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | NR |
Tony Young
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | FAIL |
Tony Young
|
|
|
SHEAR\\###-####
c/n posted, need letter from eng. for compliance for shear due to changes (as built vs. plans) 3/20/2001 3:28:03 PM
|
BLD-Foundation | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 03/05/2001 at 18:11:53. Contact: ###-####.
wip, ok w/ verbal corrections 3/6/2001 11:15:18 AM
|
BLD-Footing | 2/28/2001 | 3/1/2001 | 3/1/2001 | A | PART |
Steven Webb
|
|
|
###-####: WIP--appears ok. 3/1/2001 9:08:40 AM
|
BLD-Footing | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PART |
Tony Young
|
|
|
FT INSP ROBIN ###-####
already poured slab w/ ftgs 12/21/2000 11:07:48 AM
|
BLD-Foundation | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | PASS |
Jim Storey
|
|
|
randy ###-#### found walls ok for rebar. 12/12/2000 4:45:51 PM
|
BLD-Foundation | 12/4/2000 | 12/4/2000 | 12/4/2000 | P | PASS |
Steven Webb
|
|
|
###-####footing not foundation 12/4/2000 2:03:55 PM
|
BLD-Grading Inspection | 12/1/2000 | 12/1/2000 | 12/1/2000 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been inspected and approved by the geotechnical engineer.
|