BLD-Final | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Tony Young
|
|
|
7th floor Dave ###-####
|
Permanent Occupancy | | 7/23/2001 | 7/23/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/26/2001 | 2/26/2001 | 2/26/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/26/2001 1:01:13 PM
|
BLD-Framing/Rough-in | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PART |
Tom Arcoraci
|
|
|
###-####\\ceiling grid grid ok 2/22/2001 10:39:33 AM
|
FIRE-Final Inspection | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### Tim need to test alarms; rated doors; sprinkler heads 2/22/2001 3:24:19 PM
|
BLD-Framing/Rough-in | 2/6/2001 | 2/8/2001 | 2/8/2001 | A | PART |
Tony Young
|
|
|
###-####
interior walls ok to cover on phase 2, need to verify bracing of walls later @ ceiling grid inspection, also corridor compliance 2/8/2001 11:28:57 AM
|
FIRE-Sprinkler Rough-in | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | PART |
Rick Jackson
|
|
|
###-#### okay to occupy phase 1 only 1/24/2001 3:50:23 PM
|
BLD-Framing/Rough-in | 1/18/2001 | 1/19/2001 | 1/19/2001 | P | PART |
Tony Young
|
|
|
Dave ###-####
ok for ceiling grid on 1st phase, verify the rest of wall bracing @ final 1/19/2001 2:17:51 PM
|
BLD-Framing/Rough-in | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | PART |
Tony Young
|
|
|
fr dave miller ###-#### -7th floor
c/n posted, ok to cover 1st phase of interior walls, pending architect letter. verify bracing of walls @ ceiling grid inspection. see prior notes 1/5/2001 1:54:00 PM
|
BLD-Framing/Rough-in | 1/4/2001 | 1/4/2001 | 1/4/2001 | P | FAIL |
Tony Young
|
|
|
###-####
conf. w/ dave on framing, no c/n/// wall bracing, headers, jambs, seismic pods in existing ceiling, height of demising wall 1/4/2001 2:57:50 PM
|