Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03348
StatusFinaled
Name PRIMARY HEALTH
Site Address 800 PARK BLVD Unit: (7 FLR)
Project NameMK PLAZA IV-7TH FLR
Customer Number 
ePlanReviewNo
Description
(PRIMARY HEALTH) Fire sprinklers are used for building area increase and to meet high-rise provisions. To create a 10,139 square foot office tenant space on the 7th floor of MK Plaza IV. To resolve exit separation concerns, a 1-hr tenant demising wall divides this tenant space into two separate areas for exiting. Non-structural demolition is also covered by this permit. Work is to include interior nonbearing walls, 1-hr tenant demising walls, relocated and new doors, relocated and new windows, suspended ceiling repairs, 1-hr corridor modifications, and interior finishes all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1996 as regulated by the Fire Department. PC-955-00 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/23/20017/23/20017/23/2001PPASS
DetailsTony Young
7th floor Dave ###-####
Permanent Occupancy 7/23/20017/23/2001 DONE
Details
FIRE-Final Inspection2/26/20012/26/20012/26/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 2/26/2001 1:01:13 PM
BLD-Framing/Rough-in2/21/20012/22/20012/22/2001APART
DetailsTom Arcoraci
###-####\\ceiling grid grid ok 2/22/2001 10:39:33 AM
FIRE-Final Inspection2/22/20012/22/20012/22/2001PFAIL
DetailsRick Jackson
###-#### Tim need to test alarms; rated doors; sprinkler heads 2/22/2001 3:24:19 PM
BLD-Framing/Rough-in2/6/20012/8/20012/8/2001APART
DetailsTony Young
###-####
interior walls ok to cover on phase 2, need to verify bracing of walls later @ ceiling grid inspection, also corridor compliance 2/8/2001 11:28:57 AM
FIRE-Sprinkler Rough-in1/22/20011/22/20011/22/2001PPART
DetailsRick Jackson
###-#### okay to occupy phase 1 only 1/24/2001 3:50:23 PM
BLD-Framing/Rough-in1/18/20011/19/20011/19/2001PPART
DetailsTony Young
Dave ###-####
ok for ceiling grid on 1st phase, verify the rest of wall bracing @ final 1/19/2001 2:17:51 PM
BLD-Framing/Rough-in1/5/20011/5/20011/5/2001PPART
DetailsTony Young
fr dave miller ###-#### -7th floor
c/n posted, ok to cover 1st phase of interior walls, pending architect letter. verify bracing of walls @ ceiling grid inspection. see prior notes 1/5/2001 1:54:00 PM
BLD-Framing/Rough-in1/4/20011/4/20011/4/2001PFAIL
DetailsTony Young
###-####
conf. w/ dave on framing, no c/n/// wall bracing, headers, jambs, seismic pods in existing ceiling, height of demising wall 1/4/2001 2:57:50 PM