BLD-Final | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Dave Hannah
|
|
|
###-#### c.c #23814 issued 4/15/2003 4:32:52 PM
|
BLD-Final | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | DONE |
Dave Hannah
|
|
|
SHAWN ###-####
|
BLD-Grading Inspection | 4/15/2003 | 4/15/2003 | 4/15/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Energy code compliance | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PASS |
Dave Hannah
|
|
|
basement walls
|
BLD-Final | 3/27/2003 | 3/28/2003 | 3/28/2003 | A | NR |
Dave Hannah
|
|
|
###-#### shawn
|
BLD-Conference | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PASS |
Dave Hannah
|
|
|
for conference extentsion ok to extent permit work in progress 11/8/2002 4:19:10 PM
|
BLD-Framing/Rough-in | 4/4/2002 | 4/4/2002 | 4/4/2002 | P | PART |
Tony Young
|
|
|
sheer wall ###-#### shawn
int shear 4/5/2002 9:15:37 AM
|
BLD-Energy code compliance | 3/25/2002 | 3/25/2002 | 3/25/2002 | P | PASS |
Tony Young
|
|
|
###-#### BERT
received eng letter on clearance on fireplace chimney, // eng. approved as built because of solid masonary wall w/ airspace built around clay lined flue w/ brick around flue, air space between brick and solid masonary. 3/25/2002 1:42:52 PM
|
BLD-Framing/Rough-in | 3/20/2002 | 3/20/2002 | 3/20/2002 | P | PART |
Tony Young
|
|
|
###-#### SHAWN
re-inspect ok except chimney clearance, ok to insulate 3/20/2002 12:21:12 PM
|
BLD-Conference | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Tony Young
|
|
|
chimney/ combustion materials 3/19/2002 10:55:28 AMGeorge S. agrees w/ my c/n on having 2" clearance from masonary chimney 3/19/2002 3:30:47 PM
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Tony Young
|
|
|
###-####
c/n posted, ok to insulate 3/18/2002 1:27:13 PM
|
BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 | P | PART |
Tony Young
|
|
|
SHEER WALL AND FRAIMING SHAWN ###-####
ext. shear ok 12/14/2001 2:13:06 PM
|
BLD-Foundation | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 08:45:25. Contact: ###-####.
|
BLD-Footing | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Tony Young
|
|
|
###-#### ROBERT
porch, poured already 9/17/2001 1:37:37 PM
|
BLD-Foundation | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | PART |
Tony Young
|
|
|
###-####
wip 7/20/2001 11:35:31 AM
|
BLD-Footing | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | PART |
Tony Young
|
|
|
SHAWN-- ###-#### FT -LATE AM IF POSSIBLE
verbal corrections 7/17/2001 11:25:27 AM
|
BLD-Footing | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PART |
Russ Owen
|
|
|
###-#### interior isolated footings basement. 1/13/2002 3:25:10 PM
|
BLD-Foundation | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PART |
Tony Young
|
|
|
###-####
basement walls pass, ok to pour 5/22/2001 12:02:03 PM
|
BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PART |
Tony Young
|
|
|
Robert ###-#### late am please
veral corrections, depth of ftgs 5/7/2001 11:02:25 AM
|
BLD-Grading Inspection | 5/7/2001 | 5/7/2001 | 5/7/2001 | | PASS |
Rita DeYoung
|
|
|
Foundation subgrade has been approved by the engineer.
|