BLD-Aging Inspection | 10/8/2003 | 10/8/2003 | 10/8/2003 | | DONE |
Dave Hannah
|
|
|
wip 10/10/2003 1:17:04 PM
|
BLD-Aging Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 | | PASS |
Carl Dependahl
|
|
|
west wing infrastructure...WIP 8/6/2003 4:54:04 PM
|
BLD-Conference | 6/5/2003 | 6/6/2003 | 6/5/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 6/5/2003 at 8:03:06 AM. Contact: ###-####....wip...w/ Mike Cotner, proj mgr 6/5/2003 10:39:15 AM
|
BLD-Aging Inspection | 6/2/2003 | 6/2/2003 | 6/2/2003 | | PASS |
Carl Dependahl
|
|
|
rest of west wing upgrade not done..wip re mech & struct. 6/3/2003 1:38:25 PM
|
BLD-Conference | 3/26/2003 | 3/31/2003 | 3/31/2003 | A | PASS |
Carl Dependahl
|
|
|
Follow up from aging...w/ Mike Cotner, Proj. Mgr...re status 3/31/2003 9:28:44 AM
|
BLD-Conference | 3/26/2003 | 3/27/2003 | 3/27/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 1:26:51 PM. Contact: ###-####....work still in progress, HVAC wip, not ready for final, will need spec insp reports, etc. at that time. 3/28/2003 10:20:50 AM
|
BLD-Aging Inspection | 3/20/2003 | 3/20/2003 | 3/26/2003 | | DONE |
Carl Dependahl
|
|
|
called SLRMC office 3/26/2003 11:50:36 AM
|
BLD-Aging Inspection | 1/17/2003 | 1/17/2003 | 1/17/2003 | | PASS |
Carl Dependahl
|
|
|
WIP...still need all reports. 1/17/2003 9:27:40 AM
|
BLD-Conference | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/12/2002 6:31:28 PM need affidavits, insp reports...all other agcy ok's for final
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | NR |
Carl Dependahl
|
|
|
bsmt/mech upgrade for west wing 1/7/2002 5:01:03 PM
|
BLD-Aging Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | | NR |
Carl Dependahl
|
|
|
demo bsmt/mech for west wing emodel. 11/7/2001 10:05:25 AM
|
BLD-Concrete | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PART |
Carl Dependahl
|
|
|
concrete ###-####- john; equip pads, ok 9/7/2001 8:54:25 AM
|
BLD-Concrete | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PART |
Carl Dependahl
|
|
|
concrete john -###-#### curbs at mech room roof deck, bar in place, MTI onsite. 8/30/2001 11:18:14 AM
|
BLD-Conference | 8/14/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/14/2001 9:46:43 AM w/ John Schultz...need all spec insp reports...
|
BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Carl Dependahl
|
|
|
structural steel John ###-####; deck, studs in place ok, pend MTI report. 8/14/2001 10:31:25 AM
|
BLD-Foundation | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | PART |
Jim Storey
|
|
|
###-#### placed with special insp. pending report. 7/23/2001 4:07:12 PM
|
BLD-Concrete | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 08:09:29. Contact: ###-####. pend S.I. report 6/20/2001 5:03:32 PM
|
BLD-Conference | 5/9/2001 | 5/9/2001 | 5/14/2001 | P | PASS |
Carl Dependahl
|
|
|
w/ john schultz 5/14/2001 3:10:57 PM
|